Loading...
HomeMy WebLinkAboutProduct Approval�I • I i 1. 1 ` r r • r • r r r ' r c c R � part e I I 7 ,.. . . DIVISION:06 00 00--WOOD,PLASTICS AND COMPOSITES SECTION:0616 00—SHEATHING DIVISION:07 00 00—THERMAL AND MOISTURE,PROTECTION SECTION:07 25 00—WATER-RESISTIVE BARRIERS/WEATHER BARRIERS SECTION:07 27 00—AIR BARRIERS i REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE 10925 DAVID TAYLOR DRIVE,SUITE 300 CHARLOTTE,NORTH CAROLINA 28262 EVALUATION SUBJECT: ZIP SYSTEM" WALL SHEATHING r c IN ICC ICC C PmC. uSTED Look for the trusted marks of Conformity! "2014 Recipient of Prestigious Western States Seismic Policy Council = (WSSPCJ Award in Excellence" A Subsidiary of�oEc Nine ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any ether aitPp ltes not specifically addressed, nor are they to be construed as an endorsement of the subje t� .lhe repay;fir�1 (0= recommendation for its use, There is no warranty by ICC Evaluation Service, LLC, express or implied as `-� to any f nding or other matter in this report, or as to any product covered by the report. 0°', L �° Copyright©2016 ICC Evaluation Service,LLC. All rights reserved. f , F SERVICE and Trusted IMES Evaluation Report ESR-1474 Reissued October 2016 This report is subject to renewal October 2018. www.icc-es.ora 1 (800)423-6687 ( (562)699-0643 A Subsidiary of the International Code Council DIVISION:06 00 00—WOOD,PLASTICS AND 3.0 DESCRIPTION COMPOSITES 3.1 Sheathing Panel: Section:06 16 00- Sheathing The ZIP System®Wall Sheathing panel is an OSB wood DIVISION:07 00 00—THERMAL AND MOISTURE structural panel having a laminated exterior facer. The PROTECTION Exposure 1 OSB complies with US DOC PS 2 for wood Section:07 25 00—Water-resistive Barriers/Weather structural panels. The exterior facer is a medium-density, Barriers phenolio-impregnated, polymer-modified sheet material Section:07 27 00—Air Barriers qualifying as a Grade D water-resistive barrier(required by Section 2510.6 of the 2012 and 2009 IBC).The panels are REPORT HOLDER: nominally 4 feet wide by 8, 9, 10, 11 or 12 feet long and have a square-finished-edge or machined-edge profile. HUBER ENGINEERED WOODS,LLC When tested in accordance with ASTM E96 (water ONE RESOURCE SQUARE method), the polymer-modified sheet overlay has a CHARLOTTE,NORTH CAROLINA 28262 DAVID TAYLOR DRIVE,SUITE 300 minimum vapor permeance of 12 perms ]68.6 X CHA (800)933-9220 10"» kg/(Pa-s-m2)]. Equivalent Water Vapor Transmission www.huberwood.com rate (WVT) of the polymer-modified sheet overlay is 83.4 gI(24h-m)when tested at 73.4 F(23'C). EVALUATION SUBJECT: The water-resistive barrier and air barrier properties of the ZIP System®Wall Sheathing Panels are not affected ZIP SYSTEM WALL SHEATHING when the panels are manufactured to comply as facing materials for SIPS in accordance with Section R610.3.2 1.0 EVALUATION SCOPE and Table R610.3.2 of the 2015 IRC (Section R613.3.2 Compliance with the following codes: and Table R613.3.2 of the 2012 and 2009 IRC). ■ 2015.2012 and 2009 International Building Code®(IBC) 3.2 Seam Tape: ® The ZIP SystemTm seam tape is a self-adhering membrane ■2015, 2012 and 2009 International Residential Gode tape'consisting of acrylic adhesive laminated to a (IRC) pelyolefin backing.The tape is 0.012 inch(0.30 mm)thick ■ 2015,2012 and 2009 Intemational Energy Conservation with a minimum width of 3/4 inches(95.2 mm),and comes Code®(IECC) in rolls of various lengths. Properties evaluated: 4.0 INSTALLATION ■ Weather resistance 4.1 General: ■ Air leakage Installation of ZIP System® Wall Sheathing panels must comply with the applicable code, this report and the 2.0 USES manufacturer's published installation instructions. The manufacturer's published installation instructions must be ZIP System® Wall Sheathing panels are used as available at the]obsite during installation. combination wall sheathing,air barrier,and water-resistive barrier. This report recognizes the use of ZIP System® 4.2 Application: Sheathing, when installed with ZIP SystemTm flexible 4.2.1 General: The ZIP System®Wall Sheathing panels flashing seam tape, in walls of Type V construction (IBC) must be attached to wall framing in accordance with the and dwellings under the IRC, and as an alternate to the applicable code for wood structural panels, and in water-resistive barrier required in Chapter 14 of the IBC compliance with their panel span rating. The panels must and Chapter 7 of the IRC,and to the air barrier required by be Installed with the polymer-modified sheet overlay Sections R402.4 and C402.5.1 of the 2015 IECC(Sections facing the exterior. In accordance with the manufacturer's R402.4 and C402.4.1 of the 2012 IECC; Sections 402.4.1 published Installation instructions, it is recommended that and 502.4.3 of the 2009 IECC). the square edges of the panels be installed with a gap ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other ouribures not specifically addressed,nor,are they to be construed as an endorsement of the subject of the report or a recommendation for its use.There is no is ornanty by ICC Evaluation Service.LLC,express or implied,ar to anyJinding or other matter in this report,or as to airy product covered by the report. Copyright 0 2016[CC Evaluation Service,LLC. All rights reserved. Page 1 of 6 ESR-1474 I Most Widely Accepted and Trusted Page 2 of 6 between adjacent panels and between panels and alternative to what is specified in, those codes listed in dissimilar materials.All ZIP System®Wall Sheathing panel Section 1.0 of this report, subject to the following seams must be sufficiently sealed with ZIP System seam conditions: tape.All overlay surfaces must be dry and free of sawdust 6.1 This evaluation report and the manufacturer's and dirt prior to application of the ZIP System' seam tape. The ZIP SystemTm seam tape must extend a minimum of published installation instructions, when required by 1 inch )past the panel edge T-joint intersections mm 25.4 the code official, must be submitted at, the time of ( and must be centered within /2 inch (12.7 mm) over the permit application. middle of panel seams.The tape must be pressed firmly to 5.2 The ZIP System® Wall Sheathing panels must be adhere to the surfaces and seal the seams.Wrinkles in the manufactured, identified and installed in.accordance ZIP SystemTm seam tape are acceptable unless they with this report and the manufacturer's published create a leak path to the panel seam. installation Instructions. In the event of a conflict 4.2.2 Flashing: Flashing complying with the applicable between the instructions and this report, this report code must be installed at the perimeter of door and must govern. window assemblies, penetrations and terminations of 5.3 The ZIP System® Wall Sheathing panels must be exterior wall assemblies, exterior wail intersections with covered with a code-complying exterior wall covering, roofs, chimneys, porches, decks, balconies, and similar or one that is recognized in a current ICC-ES projections, and at built-in gutters and similar locations evaluation report. where moisture could enter the wall. An adhesive-backed 5.4 The OSB sheathing must comply with US DOC PS-2. flashing tape recognized.in a current ICC-ES evaluation report must be installed to seal all ZIP System® Wall 5.5 Fire-resistance-rated construction is outside the Sheathing flashing joints. Penetration items must be scope of this report.. sealed to the panels. The adhesive-backed flashing tape 6.0 EVIDENCE SUBMITTED must comply with the ICC-ES Acceptance Criteria for 6.1 Data in accordance with the ICC-ES Acceptance Flexible Flashing Materials (AC148)and must be installed in accordance with the manufacturer's published Criteria for Water-resistive Membranes Factory- installation instructions. Sea Figures 1 through 7 of this� Water-resistive Barriers (AC310), dated May 2008 report for typical flashing, water-resistive barrier and air (editorially revised August 2015). barrier assembly installation details. 4.2.3 Air Barrier Assembly: ZIP System® Wall 6.2 Air leakage data in accordance with ASTM E2357. Sheathing fastened to maximum 24-inch-on-center 7.0 IDENTIFICATION (610 mm), wood wall framing, using minimum 6d nails Each ZIP System®Wall Sheathing panel described in this spaced at 6 inches (152 mm) around panel edges and at report must bear a label that includes the manufacturer's 12 inches (306 mm) in the field, leaving a /e-inch name (Huber Engineered Woods LLC),the product name, (3.18 mm) gap between panels, forms an air barrier nominal panel thickness, the evaluation report number assembly when the gaps between panels and the (ESR-1474),and the words"Mill 229, Crystal Hill,Virginia"; perimeter of penetrations are sealed with ZIP System TM' "Mill 228, Easton, Maine";"Mill 227, Commerce, Georgia"; seam tape as required by Section 4.2.1.The assembly has or"Mill 290, Broken Bow, Oklahoma."The OSB'sheathing demonstrated a2maximum air leakage of 0.0072 cwfl? must also bear a label demonstrating compliance with [0.037 lJ(s m )j infiltration and 0.0023 cfm/ft� US DOC PS 2 from an approved Inspection agency. The [0.012 U(s•m )] exfiltration at a pressure differential of ZIP SystemTm seam tape roll must be labeled with the 1.57 psf (75 Pa) when tested in accordance with ZIP System logo and the evaluation report number ASTM E2357. ESR-1474(see Figure 8). 5.0 CONDITIONS OF USE The ZIP System®Wall Sheathing panel and tape system described in this report complies with, or is a suitable i ESR-1474 Most Widely Accepted and Trusted Page 3 of 6 GUTEIDE UWE LOW-PRE`.SM POLYURETHANE »tFDDw r ML-\ ML NG CLU In RECOIRAENOm ZIP symu* BY FLASHING WALL SF£ATHNO MANUFACNRER ROUM MOM ADFEM-BACKED ` FL SIM TAPE AOH®YE-BACKED FIAFUNG TAPE ROUGH FRAYING DP S't"lEll` WALL 9iEATHN. LOWS!-PP1SWRE PIXW ETHME FOAM WT9DE dEaE WNGW HEM I SILL SECTION HEADER SECTION WINDOW JAMS OUMUE ZIP`YSTFM" WALL 94EAlHNO ADHESIW-BAOTO FLASHING TAPE INsm LOW-PRESSURE POLYURETHANE FOAM JAMB SECTION FIGURE i—TYPICAL CROSS SECTIONS OF FLANGED WINDOW I ', ESR-1474 Most Widely Accepted and Trusted Page A of 6 s W150E IH90E IP 5Y'SIEll• WALL'JIFAMNO TANDDM SLL� L�UW�W TAP NWGH FVAMWG '—tow-fRLSm FOLM&THHL FOAW CAtAAp7G . 8Aa.DAM l90- TF EE ftE FOLYUl+ETMNE rem AONESJJE-eAn�n —�' FI1f.71`WG Tw PoRA31fiD� ZIP SYSlE11• FALL If4EA1NMG WT*uIDC NGaC VNAGW HEAD SILL SEC71ON HEADER SECTION u�NDOW ims YIP Sf51EM' WALL SHEATHING ADHESIVE-9AMED FLASHING TAPE DLITSIDE CAULKING ROUGH OPENING I i INSIDE LOW4RESWAE 1 POLINRETHANE FOAM JAMB SECTION FIGURE 2--TYPICAL CROSS SECTIONS OF INSTALLED BRICK MOLD WINDOW i I i ESR-1474 Most Widely Accepted and Trusted Page 5 of 6 ZIP SYSTEM"' ZIP SYSTEM' WALL SHEATHING WALL SHEATHING WALLFRAMING WALL FRAMING ADHESIVE-BACKED FLASHING TAPE ADHESIVE-BACKED FLASHING TAPE FLASHING FASTENER METAL FLASHING COUNTER FLASHING FLASHING FASTENER BASE FLASHING ADHESIVE-BACKED FLASHING TAPE FLASHING FASTENER ADHESIVE-BACKED FLASHING TAPE ROOF UNDERLAYMENT(FMT) —ROOFUNDERLAYIUENT fEI.T) ROOF SHEATHING ROOF SHEATHING I ' I ROOF JOIST ROOF JOIST FIGURE 3—ROOF-WALL INTERSECTION(OPTION 1) FIGURE 4—ROOF-WALL INTERSECTION(OPTION 2) i �rwwa rReawt., K 0aoa�u°A1+o aulraAl —Ka+cao 6tTfabJtRtCr —w olwA a —"'w�uaoeA�ryao �nPO` Cana w wi1RW p W159W iv4RD Ygo"m .-. uoaion naa_mvoo amt mo mamcNw.-s —ft aaprpt mt4o¢Y/E000Q76 �oHa+ao�naomL f Mpuos wmaoo0°"10rraeo°�at _.___�r,� aav�r�am°�Orrn°+� .—_aiwnr •'�. rums[ ♦ • .#� ��-WHnACaO WORLTVDu�,___ / .• miaa5w►ato • ucsLL wtsyom.n •� t•�;, �amawmw— awa oiw i sv�nru r �wru �I FIGURE 5—TYPICAL WALL-SILL INTERSECTION FIGURE 6—TYPICAL WALL-SILL INTERSECTION AND FLASHING DETAILS FOR BRICK SIDING AND FLASHING DETAILS FOR LAPPED SIDING I I I ' ESR-1474 Most WIdely Accepted and Trusted Page 6 of 6 1 i Adhesive-Backed Flashing.Tape I I i I FIGURE 7--INSTALLATION AT PENETRATION OPENING(NON-FIRE-RESISTANCE RATED) I 1 I � II I FIGURE 8—LABELING FOR THE ZIP SYSTEM SEAM TAPE ROLL I - SERVICE: Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-1474 FBC Supplement Reissued October 2016 This report is subject to renewal October 2018. www.icc-es.org 1 (800)423-6687 1 (562)699-0643 A Subsidiary of the International Code Council® DIVISION:06 00 00—WOOD,PLASTICS AND COMPOSITES Section:0616.00--Sheathing DIVISION:07 00 00—THERMAL AND MOISTURE PROTECTION Section:07 25 00—Water-Resistive BarrierslWeather Barriers Section:07 27 00—Air Barriers REPORT HOLDER: HUBER ENGINEERED WOODS,LLC ONE RESOURCE SQUARE 10925 DAVID TAYLOR DRIVE,SUITE 300 CHARLOTTE,NORTH CAROLINA 28262 (800)933-9220 www.huberwood.com EVALUATION SUBJECT: ZIP SYSTEM®WALL SHEATHING 1.0 REPORT PURPOSE AND SCOPE If Purpose: The purpose of this evaluation report supplement is to indicate that ZIP System®Wall Sheathing panels, recognized in ICC-ES master evaluation report ESR-1474,have also been evaluated for compliance with the codes noted below. Applicable code editions: * 2014 Florida Building Code—Building ■ 2014 Florida Building Code—Residential 2.0 CONCLUSIONS The ZIP System®Wall Sheathing panels,described in Sections 2.0 through 7.0 of the master evaluation report ESR-1474, comply with the 2014 Florida Building Code—Building and the 2014 Florida Building Code—Residential,provided the design and installation are in accordance with the Intemational Building Code®provisions noted in the master report. Use of the ZIP System®Wall Sheathing panels for compliance with the High-Velocity Hurricane Zone provisions of the 2014 Florida Building Code—Building and the 2014 Florida Building Code—Residential has not been evaluated, and is outside the scope of this evaluation report. For products failing under Florida Rule 9N-3,verification that the report holder's quality-assurance program is audited by a quality-assurance entity approved by the Florida Building Commission for the type of inspections being conducted is the responsibility of an approved validation entity(or the code official,when the report holder does not possess an approval by the Commission). This supplement expires concurrently with the master report,reissued October 2016. !CC-ES Evaluation Reports are not to he construed as representing aesthetics or any other attributes not spec frn(fy addressed,nor are they to be construed ar an endorsement of the subject of the report or a recommendation for its use,There is no warranty by[CC Evaluation Service,LLC,express or implied,as to anyfinding or other matter in this report,or as to any pradum covered by the report, Copyright 0 2016]CC Evaluation service,LLC. All rights reserved. Page 1 of 1 cICC EVALUATION c SERVICE Most eely Accepted,ind Trusted ICC-ES Environmental Report VAR-1012 Reissued September 2015 This report is subject to renewal September 2017. www.lec-es.ora/ep 1 (800)423-6587 1 (562)699-0543 A Subsidiary of the International Code Council® i DIVISION:06 00 00—WOOD,PLASTICS AND • 2013 California Green Building Standards Code COMPOSITES (CALGreen),Title 24,Part 11 (see Table 3 for details) Section:0612 OO—Structural Panels Section:0616 00—Sheathing • National Green Building Standard (ICC 700-2008) (see Table 4 for details) DIVISION:07 00 00--THERMAL AND MOISTURE e National Green Building Standard ([CC 700-2012) i PROTECTION (see Table 5 for details) Section:07 21 00—Thermal Insulation Section:07 25 00—Water-Resistive Barriers/Weather LEED far Homes 2008(see Table 8 for details) Barriers . LEED v4 for Homes Design and Construction (see Section:07 27 00—Air Barriers Table 7 for details) REPORT HOLDER: • LEED 2009 for New Construction and Major Renovations (see Table 8 for details) LEED 2009 for HUBER ENGINEERED WOODS,LLC Schools New Construction and Major Renovations(see 10925 DAVID TAYLOR DRIVE Table 9 for details) CHARLOTTE,NORTH CAROLINA 28262 e LEED v4 for Building Design and Construction (BD+C) i (800)933-9220 (See Table 10 for details) www.huberwood.com • ANSI/GBI 01-2010 — Green Building Assessment EVALUATION SUBJECT: Protocol for Commercial Buildings (see Table 11 for details) ADVANTECH®(AT-SERIES)SHEATHING SPAN; 2.0 USES ADVANTECHe(AT-SERIES)FLOOR SPAN;ZIP SYSTEM® ROOF SHEATHING;ZIP SYSTEM®WALL SHEATHING; AdvanTeche (AT-Series) Sheathing Span, AdvanTeche ZIP SYSTEM®R-SHEATHING(INSULATING SHEATHING) (AT-Series) Floor Span,ZIP System Roof Sheathing and ZIP System® Wail Sheathing are used for a variety of 1.0 EVALUATION SCOPE interior and exterior framing and sheathing applications. Compliance with the following evaluation criteria: ZIP Systeme R-Sheathing panels are used as combination wall sheathing and continuous insulation in l, ICC-ES Environmental Criteria for Determination of Bio- conventional wood-framed wall construction. based Material Content(EC102),dated March 2012. 3.0 DESCRIPTION • ICC-ES Evaluation Guideline for Determination of AdvanTeche(AT-Series)Sheathing Span and AdvanTeche Source of Recovery, Extraction, Harvest and AT-Series FloorS Manufacture for Materials or Products (EC114), dated ( ) pan wood structural panels are March Manufacture Exposure 1 oriented strand board (OSB) panels manufactured with strands from a single wood species or a • ICC-ES Environmental Criteria for Determination of combination of wood species blended with an exterior-type Formaldehyde Emissions of Composite Wood and adhesive system to comply with U.S. DOC PS-2 and the Engineered Wood Products (EC108), dated March applicable ICC-ES report as indicated in Table 1. 2012. ZIP Systeme Roof Sheathing and ZIP Systeme Wall • ICC-ES Environmental Criteria for Determination of Sheathing wood structural panels are OSB panels with Certified Wood and Certified Wood Content in Products laminated, resin-impregnated, polymer-modified sheet I (EC109),dated March 2012. material manufactured to comply with U.S. DOC PS-2 and i the applicable ICC-ES reports as indicated in Table 1.The Compliance eligibility with the applicable sections of panels are installed with ZIP Systeme self-adhering the following green building rating systems,standards membrane tape. The tape is outside the scope of this and codes: evaluation report. • 2012 International Green Construction Cade (IgCC) ZIP Systeme R-Sheathing is an insulated sheathing (see Table 2 for details) made by combining 7/le-inch-thick ZIP Systeme Wall !CC-ES Verification ofARdbutes Reports are Issued tinder the IMES VAR Environmental Program.These reparb are not to be eominred ar representing aesthelics or any other onribures not speeificnRy addressed,nor are they to be construed ar an endorsement of the stibject of the report or a recammendation jar its rue.There is no wisunty by ICC im Esnhiallon Service,LLC,"Preis or implied as to any finding or other matter in this report,or as to any product covered by the report, ona Copyright®2016 ICC Evaluation Service,LLC. All rights reserved. Pagel or 6 .f - ` VAR-1012 j Most Widely Accepted and Trusted Page 2 of 6 Sheathing as described in ESR-1474 with a layer of 5.2 ICC-ES EC114. [Evaluation applies to IgCC Section maximum 1-inch-thick (25.4 mm) rigid foam plastic 505.2.5; CALGreen Section A5.405.1; ICC 700-2008 insulation laminated to the interior face with PVA adhesive. Section 608.1; ICC 700-2012 Sections 609.1, Refer to ESR-3373 for additional product description. 11.609.1 & 12.1(A).609.1; LEED Homes MR 2.2(c); 4.0 CONDITIONS LEED v4 Homes MRc3; LEED NC MR 5; LEED Schools MR 5; LEED v4 BD+C MRc3;ANSI/GBI 01- 4.1 Code Compliance: 2010 Section 10.1.4.11. AdvanTech® (AT-Series) Sheathin% Span, AdvanTech® 5.3 ICC-ES EC108 (Evaluation applies to IgCC Section (AT-Series)Floor Span,ZIP System Roof Sheathing,ZIP 806.1; ICC 700-2008 Section 901.4(6);ICC 700-2012 System® Wall Sheathing and ZIP System® R-Sheathing Sections 901.4(6) & 11.901.4(6); LEED NC EQ 4.4; have been evaluated for compliance with the requirements LEED Schools EQ 4.4;LEED v4 BD+C EQc2]. of the International Codes as listed in Table 1 of this report. SA ICC-ES EC109 [Evaluation applies to ICC 700-2008 4.2 Green Rating Systems, Standards and Code Section 606.2; ICC 700-2012 Sections 606.2(2), Eligibility: 11.606.2(2) & 12.1(A).606.2; ANSI/GBI 01-2010 The information presented in Tables 2 through 11 of this Section 10.3.2.1]. report provides a matrix of areas of evaluation and 5.5 Documentation establishing and documenting all corresponding limitations and/or additional project-specific major sources of primary manufacturing energy requirements, and offer benefit to individuals who are [Evaluation applies to ICC 700-2008 Section 606.3; assessing eligibility for credits or points. ICC 700-2012 Sections 606.3&11.606.31. The final interpretation of the specific requirements of the 5.6 ICC-ES ESR-1474 documenting that ZIP System Wall respective green building rating system, standard and/or Sheathing is equivalent to a code-prescribed water- code rests with the developer of that specific rating system resistive barrier [Evaluation applies to CALGreen or standard or the Authority Having Jurisdiction, as Section 5.407.1; ICC 700-2008 Section 602.9; ICC applicable. 700-2012 Section 602.1.8]. Compliance with items noted as "Verified Attribute' is 6.7 Refer to )CC-ES ESR-1474 for evaluation of the ZIP subject to any conditions noted in the tables. Decisions on System Wall Sheathing as an air barrier assembly compliance with those items noted as"Eligible for Points" [Evaluation applies to IgCC Section 605.1.2.1.1; ICC i in Tables 2 through 11 rests with the user of this report, 700-2008 Section 703.2.1; ICC 700-2012 Sections and those items are subject to the conditions noted. The 701.4.3.2, 11,701.4.3.2 & 12.1.701.4.3.1; LEED user is advised of the project-specific provisions that may Homes EA 3;LEED v4 Homes EAc7]. be contingent upon meeting specific conditions, and the verification of those conditions is outside the scope of this 6.0 IDENTIFICATION report. Rating systems or standards often provide AdvanTech (AT-Series) Sheathin% Span, AdvanTech supplemental information as guidance. (AT-Series)Floor Span,ZIP System Roof Sheathing,ZIP ` 5.0 BASIS OF EVALUATION System® Wall Sheathing and ZIP System® R-Sheathing The information in this report, including the "Verified products are identified with a stamp noting the Attribute; is based upon the following supporting manufacturer's name(Huber Engineered Woods,LLC)and documentation: address,the product name the manufacturing location,the ICC-ES evaluation report number (if applicable), and the 5.1 iCC-ES EC102 [Evaluation applies to IgCC Section name or logo of the inspection or grading agency. The 505.2.4; CALGreen Sections A4.405.4 & A5.405.2; report subjects are also identified on the product and/or ICC 700-2008 Section 606.1(2); ICC 700-2012 packaging with the VAR Environmental Report number Sections 605.1, 11.606.1 & 12.1(A).606.1; ANSI/GBI (VAR-1012)and the ICC-ES SAVE Mark,as applicable. 01-2010 Section 10.1.2.2]. l I TABLE 1-11EFERENCE STANDARD OR EVALUATION REPORT NUMBER FOR HUBER ENGINEERED WOODS LLC PRODUCTS REPORT NUMBER/ PRODUCT REFERENCE STANDARD AdvanTech'(AT-Series)Sheathing Span ESR-1785 AdvanTech!(AT-Series)Floor Span ZIP System!Roof Sheathing ESR-1473&ESR-2227 ZIP System!Wall Sheathing ESR-1474&ESR-2227 ZIP System!R-Sheathing €SR-3373 I i { VAR 1012 I Most Wrde1Y Accepted and Trusted Page 3 of 6 1 TABLES 2 THROUGH 11 20PSyaram WSW- Seetbn 6oetlon inimhf Pw•bfo candttlau of Ilse to OualSy AdvanTeoh A&-Tach Rmf Wan 20Psyswm Numbef Pdnh Slaeamhinp Ftowlnp Sheaminp Sheathing R-6hamhtttp TABLE 2--SUMMARY OF AREAS OF ELEGIBILITY WITH 2012INTERNATIONAL GREEN CONSTRUCTION CODE W5.2.4 Sio-based P.MXM WA A4 Huber Wood pmducta am quallfied as bk•based. • • • • 05 Product¢"ee ms*mtd,homeded,aeeaded a mamdodwed-Mire a 5W mil (600 Ion)radius oethe WON eite,Where omh a Portion at a mated¢!or Product M mcomred,harvested astradd 8 ma-bidumd MW SW roses IB00 ion),mh 50525 1MVenwd mateftah WA Out portion sh.0 be Inducted,~a resource am transported by water or rad,the 0 0 0 0 dfstwaa tome buMW axe shalt be ddemdnd by nsrhi}iyhp the dsbna that me reseuroes era tmmponed my voter of ma by 025.Aadd%g that mumber to the dstanoe bampwted by means let's,Manvratet et tail 805.1.2.1.1 Ay bander imtaeatlon WA Irutss me system m amordenm IvIM me manNadwda bstallatlan hstrlw-Cass k m�n `+ • • iCGES evatua0an¢pat Efgt•1470. b` � �'� ��' ' i �` axi FmmldMhyde emdbm f,OA Hubwwom.,al ts m al pollee; Mt'US COG PS 2(See Table 1 of Ohh asmpod • • • Os am am exempt from fa m iWe"ands¢(¢,,tadng. TABLE 3—SUMMARY OF AREAS OF ELEGIBILITY WITH 2O13 CALIFORNIA GREEN BUILDING STANDARDS CODE Verify total poduobthat are ehreadd,pmesed ammarwhdumdwehm O O O O A5405.1 Regl.,W matelots Canomia w 50 mss MS Mrn of afe axe MAK4 Cfo-based miltenSha An Huber weed produce am quaChd as bb4ased. • • • • 05 A.-M5.2 EtedNe M:405.413) Renwrableeoutme materials from rene We sources as ergineemd wood). • • • • Od A4.405.N6) AS.005.2.1 C.MlslWocd UrdV mvlew by CaVorwa eueduq Standams CWM*Ibn? hfA y MA�'s� WA WA WA 5,407.1 WateraeaMard selector was osoemdy Hubei products provide s wale,-reshtam ulerlorwaA envelolw. Mandatory 4.5N.5 Ct4npm4eaom p+oaxt-saebm EWP pmduebdonatappr/m Ue=Pos@evmmpfmudd'F lftrt' ESN 4.5 TABLE 4--SUMMARY OF AREAS OF ELEGIBIUTY WITH THE NATIONAL GREEN BUILDING STANDARD(ICC 700.2008) W29 Water4ea'sWe Wmw Mandm Itstapgvrateateatsave baron attdlor tlnseape Ptanaynem behind ealefbrvmcer " .^.'.)�"... — • • °ry androrsml - - - Two IyR'a of b1cea d materials am reed.wdt for To eam a peey-i products must be al toast 1%of me mnubuOJan mMedat oat ANX 6W.1(2) more man 1%Of the pmJea-Pr*dd MOft 5 anothw doaaad product¢!1%mmatedm mat must be aced 1 w 3 pokas are • • • • Os matergamst a✓aCa.a for ¢ter man 0.5%. Tam¢ndkd wood-based prmuch ate used ror To eam 3 poelte a semm mr0ded vmod Product must also be Used as a Moor 6082(l) nvmrefements of the buun euchas a0 wilts, 3 etememt • • • as oa Oaamwrmf Tea ceMdv d-basil products are usd for To eam4 ttoima s.-Uld t Mftd woad product mull also be wed as a mayor 608,42) pr dements Of Me lah&-p,srxal as 0-11, 4 dumenLh • • • • O° Poom w roof Matelots ale ued for major componens oithe huillNblat am"muff"dutd usury a mlmmum at 2 each To eam 6 poNb the pmdures must be wed for al least 3 major t P(ulerda of the 606.3 33%a1 Phmry marwtadudry pticwa energy B ror bdddLV.2 pmb,may W earned when acted for each mgor m pmKL • • • • Os dedvd ham renexable¢drama,rnrri0us4bie wsate eda4a,w renowade energy oedda • avert'st, row proNebn am rM apply to Oils product 1 tote:FmmatmamiwatedaherTabiett i V 1 ' f I I i VAR1012 l Most Widely Accepted and Ttusted _Page 4of6 i TABLES 2 THROUGH 11 Continued Advao,Tm h ANmlTesls LP system 21P System w system Sae6an Sm6an lrttem Poaalbia Canditlam ofUw fo Buddy SMa1h11g Fberbg Roof well R-M-Wrig Number *cute St—thhg Shaothln• TABLE4--SUMMARY OF AREAS OF ELEGIBILITY WITH THE NATIONAL GREEN BUILDING STANDARD(ICC 700-2008)(Continued) 60&1 Ind mW materiab 2 soh -Toearn pro ven ucu arse nai a .prmvrratura a O O 19e 10 mine Doerr naWra ,,Wn MI a05km a1 sea` Ins&Vonand arcaea!hp is Irets.In aRordanoawitha9 mafdbxira _� ...i I TOWpUablc irWaW.and ak seafkV t�r3i me (� nyvMtKitlan padalned is (2)no th wr&Mm performed3 pto Buuctuml plywood used for Root.WWt ender roof ahaaminp compkes vhM DOC PS arNor DOC PS 2 OSB used br amr.wWt ondfor rwrsheaWnp To moot this a mInknurn of 65%of OSS on plyamd In Its bididdaq must omaiet of Sol-4(l) compnes wMh DOC PS 2 Panels are made with MasrdaUry Huber pmdude. • • • • .• mothaateawam ad:nl—and lhetmdemalh Indkatm fhe panmivm are Exposure 1 or Exterior IPY#md)and Eap—m 1(0581 901.4(6) N�dro pnod�.M9ch can lr4wft structural 4 Amsrknum of 85%ot pWuct In the txMM are the idemifled Huber products. • • • • •e �V � TABLE 6—SUMMARY OF AREAS OF ELEGIBILITY WITH THE NATIONAL GREEN BUILDING STANDARD(ICC 700.2012) ImtaO a Water-ro§MO mu andar dranope plan eyWem beMM erterbr veneer (""'-:-^`''77 i�� �M� • • S021.a Wafer4eb+ntive tanttt 6961(2) Twogpe cf NoI;—dnuL l2anowed,eachtor Toeamapohm profucte must boo al least l%of the mK7nrdbn materlalcwt Ay. )�—. 71.8Cs.1(bS tmhell,an l%oltbeprojeQe progeded OhAriM1p 6 another hbbmed paduq all%ot matedal eosl mtSt be loed.I a3polMs aro • • • • ps 12.1A.6®.1 nutedalemt ovajoble I.gnmater than 0.5%. M82(1) Two oseaed moot-hash products are used fw To eam 3 polnls a second wffmd wood Roduamrm also be Wed as a minor 11.M6.2(1) mimr efemmis of ens bulidl g.audi mat Om. 3 element' • • • • O` 121 A BOa.t eabkhe ec rtd8wak l Irro82(2) Two cmfeed wood-Dosed Products are used for To UM 4 polms a 6emnd eedilled wood Product moot also be used as a major 77.66.2(2) maim etementeof me Wt6np,eudlma9 wo0o, 4 dememn • • • • O` 121(AsM2 romacr-1 Materbb are Wed for mina components of the fi089 b.1k g are mamfadurcd using a r0nlrrum of33% 2each To eam 6 points me peaduds moat be Wed for atteast 9 major mmpan_-rds of the 11.6063 of Perry mam�tardudrg lomess energy derived 8 rtaa bul614p.2 points may be earned when Wed for each major asnpmed • • • • O` from rmuwatte muroes,ovn"Ilda waste Games.a renew"evem-ed" To earn 2 pokne veifry material is produced,gmwa naturally,mowua nal=51 wdhln 500 m8es(005 km)of the)obada 0 bampodeet by tuck or 1500 miles(2414 41 mateda§ 2 each km)0 bampa ted for at least a0%of me tohl dhta=by rall orwasr.Products th. O O 0 O t 9.1 flbud S e7 10 m are astemd from ed or pmdumd m murapa raw material.aw.rify 9 the"Tgtdee g overa2e(by wevm or vofums)611Da distance lie taw materials have been to-scarted mess the d'id r. M.W. 701.43 T intwation sm aB seatIna b ImteBed In aomed—woh a8 ma ROVA:g.m 1701.432 1.7ot.a.32 ImWatbnandaysealkg 3 (1)Wr PpucDb: i -Y } O O 12t.701.4.3.1 15 mina (2)no tW- verill allonrMw*Homed 15 pis. (2)no tnyd- wrtnmum rfdmed3 pb shtdual plywood uRd ton amy Wail,anuor=I mevvft mmp&sw'm DOC PS 1 or&.DOC PS 901.4111 2 05a used far actor,wall.ands rmtshesOdtg To a the a mharnum of a5%of050 a*wood In 9re b did'ug must cweat of 11.001.4(1) cm#ies with DOC PS 2 Panels am made winMandatory mes Huber products. • • • • • 12.1.901.411) maistUrt`resistant 2dhmNd a the trademark (ndiweathe aanesfm We Eapow"10 E.1w., (plywood.a E.Pmure 1 COBB) 9p1.4(8) Ncr errs"products,Whldh wr include atnrdural 4 A minh rn of 85%of product In me bued!rp are Me ldenti5ed Huber products. • • • • Os tt."1. a wood tram. o =Elip'bie ar polies Vodaed attdbule y=Tub pv&bn does M apply to W dun s po Note,foobWen arelocated aaerTaba I I I I , i VAR-1012 I Most MdelyAccepled and Trusted Page 6 of 6 TABLES 2 THROUGH 11 Continued Section Paulbla AdvanTeoh AdvnnTah 21Psy.tem ZIP SalemFPepin rt Number Section lntam Pdnls Can -n.of We to Gaddy for Points llmftl Fiomi?kp Red WWi ShemNn � sheathing Shemhing g TABLE S--SUMMARY OF AREAS OF ELEGIBILITY WITH USGBC'S LEER FOR HOMES 2005 Fa] Al,InAtraton 3 maz To can 2 w 7 pdtN meet the alr leafage requvemafb shown 1 in Tad.170l Nc cedi maPpk bl. O O MRZ1 F9C areeed tropical wood 0e mu To earn 0.5 rE corn ':.., ...1 ._.7. 1 2 Po Per proem we FSCaeNrad tropical woos?• Erry rmmeoi?fry pnmerade products fw roe/,wes a 0.5 each To cam Ponta me products Out am eatradef,proasaed and rmrurfadured within M Ibora,]yariw eslabr framnp sheaiNng a R 22(a) 500 Mks(W5 I-)of the aft.far a mWonmm�of W%(by weight or volume of the O O O O a a noon ra TABLE 7—SUMMARY OF AREAS OF ELEGIBILriY WITH USGBC'S LEED V4 HOMES Ta earn 1 x 2 pou,b based on air leakage rotes determined by tatlrq and j EA.7 Nr lnRbatlon 2mas verification. MR FFic aNaed tropialwmd Prerq—b AA%VOA must be nonihmpical or caUlled by FSC or USGSC-approved equhrWerre 2 24 a x 7 ] Option o cam poiMe ma frarrung that is axtraded.q a maral a urec Em4amrontyy pmfende produce Mroof,wa0 a 05 each wdhk 100 m1e(160lat)d he vile fw a nurtbnwrr at 50%(by welghl or vohm»)of O O O O MW fears.interior a tadedor ! ng famYrgasheaW errox ' ';.. Opean 2 tlsewood products aerated by FSC or USCWC pgmed equivalent? 2 2 ] 2 - 07..•.'� EGQ Law emAung mmerbb t io cam t pavd use wood emnPa911.pradum mitt kV n ,uf led urea- • • • • Is f_. rears. TABLE"UMMARY OF AREAS OF ELEGIBILITY WITH USGBC'S LEER 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATION MR 5.1 Regional materials 1121E of contend) 1W%earn 1(P" e products that am ubaded,prooess d and man O o ufactured 500 GW us Wlea(6o5iaolofV."a for amtnlnan.110%ftwt)mtotalrtatedals D O MR 5.2 Regkml materials(20%of content) 2 valve.To eam 2 patrols use a mWmum.12014 O O O O MR7 CeNSdwoad 1 To earn 1 Pont use a mlNmum rA% (based on mg) of wood-based 2 2 2 1 2 Nfled b malaria lsf uos?ce FSC xerrmft' EO 4.4 Loweuatvtg nutedah I To earn 1 Pont use woad mmposde wood prodmft corsalnhq no.added urea- e fanmaldehyde mshe. - • • • • O,. TABLE SSUMMARY OF AREAS OF ELEGIBILITY WITH USGBC'S LEED 2009 FOR SCHOOLS NEW CONSTRUCTION AND MAJOR RENOVATION MR&I Regional materials 110%of consent) 1 To earn 1 point use products that are Crtraded,pracossee and manufactured wftNA O O O O -- f 500 mile,(805 tool of the On for a mlNmum of 11254(by coal)of total malMah ^ MR 5.2 Rp&wl malerlata(20%of content) 2 "bin.To earn 2 patois roe a minimum of 2010 O O O O MRi CeNScdvcod o earn Point one a m.alum ( ca st)s) ] x ] a _--:.2YJ 1 EO 4A Low-ON matelyb 1 To cam 1 pobR use wood composite wood podmb cwdabing no-added urea- e rannWdehyda metre • • • • O TABLE 10—SUMMARY OF AREAS OF ELEGIBILITY WITH USGBC'S LEED V4 BUILDING DESIGN AND CONSTRUCTION(BO+C) MAn3 soutorg of taw materials-ceNfleatlonof—.w 1 Option T.Use wood-based matenzaiVroam"avtmed by FSC a,0sw"p(rmed 2 1 2 2 o3 produce uivatem? Pro iuCa meelmg the requirements of MRr3 Option 2 may be etlgNe for2dditbrul e MR.] Sourcing of raw matelah-source locat an ion WA aims bash on source 1—fion(ertrawon,mufacture and Pardus.Post)basal e e e on rdaWeb ect ae2s IFACZI L—emAdng matedah WA 0W and Wmber prodw.y do.1 apply to the onmposite waW produrt deCneb� (�, O =Fil2bk for pblrde • -VedriedidbWe 1ro,W:X"XX -This provbion does not apply to thin product Nate FactivAea sm located stint Table It i �l I ' r VAR-1012 Most mdeb Accepted and Trusted Pape 6 of 6 TABLES 2 THROUGH 11 Continued SocUon Pasalhb ZIP Syabm ZIP Sr Soto SOcOon lrtmrd F41nh Condltlwuaf Uro to Qualify for Pdnb Stroathlnp Ftominp ROOF WNl pp.6hestlrlm Number Sheathlnp SMothirtp np TABLE 11—SUMMARY OF AREAS OF ELEGIBILITY WITR ANSUGBI 01.2010—GREEN BUILDING ASSESSMENT PROTOCOL FOR COMMERCIAL BUILDINGS 10.12.2 Bbtnaed Pwducm-butldlrq eeeembies Tma Ay Huber wood pwdueb are gw6fkd as blobaed • • • ■ Os To cam creoeb use produce that are eatntctnd.processed and mduC an .red AdUe 10.1.41 Replw.al Wieriale-imegmeaati 00 les Smaa 5 miles 18051on)of the eke to,a minimum.190%(by weight w vobmedthe O O iO O I wmponent! am Between 10%and 60%or moto of weebbaced produce used In the buliling are s 10321 Centiiedwwrd 6maa Wr0 mtl0ed. • • • • O O zEtpibe br pdma � • =Verlfkd eNOase -- -:::i•This paAblan does not apply to this product Fwtrwter rCed lat6m b reoldred wthe manufam.rer ony Vendor Chain ofCwtody 6 mt requlmd to guatiy fw tms Poha. 'Forest mrdcallon ced for LEEO 2009 resoun—FSC"chm cly and ftrLEED v4 resources ether FSC w USGBC.apportd equIvalern Comas USGSC for a list of aPPWW egOlvabM P.oBnrt■ 'CG65C ncogrkt a ImPalmiwed me d eelUtled forest product.hvaever the spedfiorequbemenb are wRenily under developmmd 'ibsarea b nd be mnfueed With the ptoviel"of EQ 4 4 in LEER(Table 4)because Oro California Air Resource Bmrd(CMB)dom net reguWe engineered wood product wMssom 'EIyiLUsy applies only to Ise wood•bueed sh..Wnq potion of the PaneL 'Regional malerlal eaieuletlore bash be pm)ed location provided by Haber upon request WA r Nd applicable I I I �• EN.511' SER i li DIVISION:06 00 00—WOOD,PLASTICS AND COMPOSITES SECTION:0616 00—SHEATHING DIVISION:07 00 00—THERMAL AND MOISTURE PROTECTION SECTION:07 30 05--ROOFING FELT AND UNDERLAYMENT REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE 2092S DAVID TAYLOR DRIVE,SUITE 300 CHARLOTTE,NORTH CAROLINA 28262 EVALUATION SUBJECT: ZIP SYSTEM® AND ZIP SYSTEM+` ROOF SHEATHING ICC (CC C . � c1cc c � C PMG LISTED Look for the trusted marks of Conformity! "2014 Recipient of Prestigious Western States Seismic Policy Council Eli (WSSPC)Award in Excellence" A Subsidiary of bran p1 [CC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not ' spec�cally addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as to artyfcnding or other matter in this report, or as to arty product covered by the report. CMnFYXM Copyright©2015 ICC Evaluation Service,LLC.All rights reserved. a e ICC EVALUATION SERVICE Most Widely Accepted and Trusted" IMES Evaluation Report ESR-1473* Reissued September 2015 This report is subject to renewal September 2017. www.icc-es.orq 1 (800)423-6587 1 (562)699-OM A Subsidiary of the International Code Council® DIVISION:06 00 00—WOOD,PLASTICS,AND required in Chapter 15 of the IBC and Chapter 9 of the COMPOSITES IRC.The OSB substrate complies with U.S. DOC PS-2 for Section:0616 OD—Sheathing wood structural panels and is overlaid on one side with a medium-density, phenol-impregnated, polymer-modified DIVISION:07 00 00—THERMAL AND MOISTURE sheet material. The standard-size panels are nominally PROTECTION 4 feet by 8 feet. Oversize panels, wider than 4 feet Section:07 30 05—Roofing Felt and Underlayment (1219 mm) or longer than 8 feet(2438 mm), or both, are also produced. The panels are available with either a REPORT HOLDER: square-finished-edge profile a.tongue-and-groove edge profile or a machined edge profile, The proprietary seam HUBER ENGINEERED WOODS,LLC tape is a self-adhering sheet-type membrane consisting of ONE RESOURCE SQUARE acrylic adhesive laminated to a polyolefin backing,and the 10925 DAVID TAYLOR DRIVE,SUITE 300 face of the tape is labeled with ESR-1473. The tape is CHARLOTTE,NORTH CAROLINA 28262 0.012 inch thick (0.30 mm) with a minimum width of (800)933-9220 3 inches(76.2 mm),and comes in rolls of varying length. www.huberwood.com 4.0 INSTALLATION EVALUATION SUBJECT: 4.1 General: ZIP SYSTEM®AND ZIP SYSTEM+Tm ROOF SHEATHING Installation of ZIP System and ZIP System+Tm roof sheathing must comply with the applicable code,this report 1.0 EVALUATION SCOPE and the manufacturer's published installation instructions. The installation instructions are to be available at the Compliance with the following codes: jobsite at all times during installation. The instructions ■ within this report must govern if there are any conflicts 2015,2012 and 2009 International building Code®(IBC) between the manufacturer's published instructions and this ■2015, 2012 and 2009 International Residential Code® report. (IRC) 4.2 Application: ■ 2013 Abu Dhabi International Building Code(ADIBC)1 The ZIP System® and ZIP System+TM roof sheathing tThe ADIBC is based on the 2009 IBC.200918C code sections referenced panels must be installed with the longer dimension in this report are the some sections in the ADIBC. perpendicular to the roof framing and fastened to the Properties evaluated: roof framing in accordance with the applicable code for wood structural panels. The panels must be installed in ■ Structural—wind uplift resistance accordance with the panel span rating as shown on the ■ Nonclassified roof covering panels. All corners are to be securely fastened. Tongue- and-groove and machined edge panels are designed to Classified roof covering provide the correct gap size at the panel edges during ■ Weather resistance installation.Squared-edged panels must be spaced apart.a minimum of 1/a inch (3.18 mm) at the time of installation. 2.0 USES End joints of adjacent panel runs must be staggered. The ZIP System® and ZIP System+TM roof sheathing panels panel must be installed with the laminated phenol- are used as combination roof sheathing and roof impregnated polymer-modified sheet material facing to underlayroent. the exterior. All ZIP System® and ZIP System+Tm roof 3.0 DESCRIPTION sheathing seams must be sealed with the Zip System® tape. All overlay surfaces must be free of any significant The ZIP System® and ZIP System+m roof Sheathing presence of debris panicles or sawdust prior to installation panels are wood structural panels having a laminated of the ZIP System tape.Overlay surfaces must be®id of facer.The ZIP System+T"°panels are manufactured using any free water prior to application of the ZIP System tape. a different resin than the Zip System®panels..The panels The ZIP Systeme tape edges must be sealed and the tape are installed with a proprietary seam tape,which allows the is to be centered within+/-1/2 inch�12.7 mm)of all panel systems to be used as an alternate to the Underlayment edge seam centers. All ZIP System and ZIP System+Tts 'Revised November 2015 /CC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed,nor are they to be construed as on endorsement of the subject of the report or a recommendation for its use.There is no warranty by dCC Evaluation Service.LLC:express or impliecc as to anyfinding or other matter tit this report,or as to vary product covered by the report. Copyright C 2015 ICC Evaluation Service,LLC. All rights reserved. Page 1 of 2 ESR-1473 Most Widely Accepted and Trusted Page 2 of 2 roof sheathing surface defects,openings,cracks,etc.,that wood structural panels with either a 24/16, 32/16 or completely penetrate the overlay and substrate, and 40/20 span rating. caused by handling or construction work, must be covered 5.4 s jurisdictions enforcing the IBC, the roof covering with the ZIP System® tape. The ZIP System® tape must extend a minimum of 1 inch(25.4 mm)past the panel edge system incorporating the panels is limited to ® installations in the following construction types: T joint intersections. The ZIP System tape must be adhered to the ZIP System® and ZIP System+Th" roof . Type III-B and Type V-B sheathing. Wrinkles in the ZIP System seam tape are acceptable unless they create a leak path to the panel • Type III-A or Type V-A under the conditions seam. specified in footnote d of IBC Table 601 4.3 Roof Assemblies • Type III-A or Type V A under the conditions specified in footnote b of IBC Table 601, for 4.3.1 Classified Roof Coverings occupancies other than Group F-1,H,M and S-1 4.3.1.1 Class A: Underlayment Is not required for a In jurisdictions enforcing the IRC, the roof covering minimum %7inch thick Zip System+rm roof sheathing with system incorporating the panels may be installed on Class A asphalt glass fiber mat shingles. structures constructed in accordance with the IRC. 4.3.1.2 Class B: Underlayment is not required for a 5.6 Enclosed attics and rafter spaces must be ventilated minimum lie-inch thick Zip System roof sheathing with in accordance with the applicable code,except where Class A asphalt glass fiber mat shingles. unvented conditioned attic assemblies are permitted 4.3.2 Nonclassifled Roof Coverings: The ZIP*System® by 2015 and 2012 IRC Section R806.5 or 2009 IRC and ZIP System+TM" roof sheathing panels are limited to Section R806.4. installation on buildings permitted to have nonclassified 5.6 An ice barrier must be provided as required by roof coverings using code-complying asphalt-fiberglass Section 1507.2.8.2 of the IBC and Section R905.2.7 shingles,metal shingles,metal panels,wood shakes,wood of the 2015 IRC and Section R905.2.7.1 of the 2012 shingles, built-up roofing, slate and slate-type shingles, and 2009 IRC. and clay and concrete file roof coverings. Roof coverings i may be applied directly to the taped ZIP Systee and ZIP 5.7 Installation is limited to roofs having a slope of 2:12 System+w roof panels unless multi-layer underlayments (16.67%slope)or greater. are required. 6.8 ZIP System® and ZIP System+TM" roof sheathing 4A Wind Uplift Resistance: panels are manufactured by Huber Engineered Wind uplift design loads and ZIP System® and ZIP Woods, LLC, in Crystal Hill, Virginia; Commerce, System+TM" roof wood structural panel allowable uplift Georgia;Broken Bow,Oklahoma;and Easton,Maine, resistance shall be determined in accordance with under a quality-control program with inspections by Sections 1609 and 2304.8.2 of the 2015 IBC or 2304.7.2 of ICC-ES. the 2012 and 2009 IBC and Section R301.2.1 of the IRC. 6.0 EVIDENCE SUBMITTED Roof coverings must be fastened to the sheathing with Data in accordance with the ICC-ES Acceptance Criteria mechanical fasteners sufficient to resist the design uplift for Wood Structural Panel Roof Sheathing Factory- load. laminated with an Alternative Roof Underlayment(AC266), 5.0 CONDITIONS OF USE dated May 2008(editorially updated October 2015). The ZIP System and ZIP System+r" roof sheathing 7.0 IDENTIFICATION panels described in this report comply with,or are suitable alternatives to what is specified in, those codes listed in Each ZIP Systerno and ZIP System+T11 roof sheathing Section 1.0 of this report, subject to the following panel covered by this report must bear a label that includes conditions: the manufacturer's name(Huber Engineered Woods,LLC) and address; the product name; the evaluation report 5.1 This evaluation report and the manufacturer's number(ESR-1473);and the grade,performance category published installation instructions, when required by and bond classification. the code official, must be submitted at the time of permit application. The panel mill label and span rating,grade,performance category and bond classification label must be visible on 5.2 The ZIP System®and ZIP System+TM" roof sheathing the bottom face of panels,opposite the laminated facer. { panels must be manufactured,identified and installed in accordance with this report and the manufacturer's The ZIP System® tape roll is labeled with the product published installation instructions, name and the evaluation report number(ESR-1473). 5.3 The ZIP System®and ZIP System+TM" roof sheathing panels are limited to code-approved structural use for I s ICC EVALUATION' SERVICE Most Widely Accepted and Trusted. ICC-ES Evaluation Report ESR-1473 FBC Supplement Reissued September 2015 This report is subject to renewal September 2017, I www.,Icc-es.om 1 (800)423-6587 (562)699-0543 A Subsidiary of the international Code Council® DIVISION:06 00 00—WOOD,PLASTICS,AND COMPOSITES Section:0616 OD—Sheathing DIVISION:07 00 00—THERMAL AND MOISTURE PROTECTION Section:07 30 05—Roofing Felt and Underlayment REPORT HOLDER: HUBER ENGINEERED WOODS,LLC ONE RESOURCE SQUARE 10925 DAVID TAYLOR DRIVE,SUITE 300 CHARLOTTE,NORTH CAROLINA 28262 (800)933-9220 www.huberwood.com EVALUATION SUBJECT: ZIP SYSTEM®AND ZIP SYSTEM+TM ROOF SHEATHING 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indicate that ZIP System® and Zip System+TM' roof sheathing, recognized in iCC-ES master evaluation report ESR-1473, has also been evaluated for compliance with the codes noted below. Applicable code editions: ■ 2014 Florida Building Code—Building ■ 2014 Florida Building Code—Residential 2.0 CONCLUSIONS The ZiP System®and ZIP System+TM+roof sheathing,described in Sections 2.0 through 7.0 of the master evaluation report ESR-1473, complies with the 2014 Florida Building Code—Building and the 2D14 Florida Building Code—Residential, provided the design and installation are in accordance with the international Building Code®provisions noted in the master report, and with the condition that wind uplifting design loads must be determined in accordance with Section 1609 of the Florida Building Code—Building and Section R301.2.1 of the Florida Building Code—Residenliai. Use of the ZiP System® and ZIP System+TM' roof sheathing for compliance with the High-Velocity Hurricane Zone provisions of the 2014 Florida Building Code—Building and the 2014 Florida Building Code—Residential has not been evaluated and is outside the scope of the evaluation report. For products falling under Florida Rule 9N-3,verification that the report holder's quality-assurance program is audited by a quality-assurance entity approved by the Florida Building Commission for the type of inspections being conducted is the responsibility of an approved validation entity(or the code official,when the report holder does not possess an approval by the Commission)- 1 This supplement expires concurrently with the master report,reissued September 2015'and revised November 2015. 1CC-ES Evaluation Reports are not lobe construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed as on endorsement ofthe subiect of the report or a recommendation for its use.There is no warranty by 1CC Evaluation Service,LLC express or implied,as to anyfinding or other ratter in this report,or as to any product covered by the report. Copyright 0 20151CC Evaluation Service,I.I.C. All rights reserved. Page 1 of 1 Florida Building Code Online Page 1 of 1 BLS Homo I log In I User Registration i Hot Topics I submit Surtiarye', Stats&Facts Publications FBC.SmR I Ks site Map I unks I search I Rdd r Product Approval USe0.:Public User 14rfzm� Product Aooreval Menu>Prodmui or Aootfatfon Search>Appliaetlan else Search Criteria Refine Search Code Version 2014 FL* 17147 { Application Type ALL Product Manufacturer ALL AU- Category ALL Subcategory Application Status ALL Compliance Method ALL Quality Assurance Entity ALL Quality Assurance Entity Contract Expired ALL Product Model,Number or Name ALL Product Description ALL, Approved for use In HVHZ ALL Approved for use outside HVHZ ALL I Impact Resistant ALL Design Pressure ALL Other ALL iSearch Results-Aonlications 'i � Type Manufacturer Validated By tus FL17147- Revision Huber Engineered Woods LLC ICC Evaluation Service, Approved ` Category.Structural Components LLC.i dory Subcategory:Products Introduced as a Result of New (205)599-9000 Technology -Approved by DSPR,Approvals W DSPR shall be reviewed and ratified by the POC and/or the Commission Ir necessary. contactus:t 2501 Blairstona Road.Tanahassen FL32399 Phohe-11404e7-192A The Stab:of Florida Is an AWED employer,Copyright 200 W(113 Mtn of Florida..;Privacy slatome ::Aeeosslbllliv""tamet::Refund state n Under Florida law,email addresses are pubL'c records.If you do not want your e-mail address released In response to a publIc-records request,do not send elec4onic mall to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 1150.4117.1395.-Pursuant to Section 455.275(1),Florida statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S,must provide the Department with an email address If they have one.The emalls provided may be used for official eommuntation with the licensee.However small addresses are pubilt record.If you do not wish to supply a personal address,please provide the Department with an email address which an be made available to the public.To determine If you are a licensee under Chapter 455,F.S.,please dick h=. Product Approval Accepts: Credit Card Sate I 1 i https://www.floridabuilding.org/pr/pr_app_lst.aspx 4/12/2017 I ; .;.. Florida Building Code Online Page 1 of 2 �• MS Home }Login User Registration Hot Tops Submit Surcharge I Stats&Facts Publications I FBC Staff i Bt7S Slte Map I Lima Search ! �, brida Product Approval USER:Public User �4 Product Aoomval Menu>Product or Aoollailun Search>Aoollcation Lkt>Application Detail FL# FL17147-RI Application Type Revision Code Version 2014 �\ Application Status Approved Comments \ ` Archived I Product Manufacturer Huber Engineered Woods LLC Address/Phone/Emall 10925 David Taylor Drive Suite 300 Charlotte,NC 28262 (704)548-5442 kurt.koch@huber.com I Authorized Signature Kurt Koch kurt.koch@huber.com Technical Representative Ken W.Hix Address/Phone/Email 1446 Hwy 334 Commerce,GA 30530 (706)336-3041 ken.hix@huber.com Quality Assurance Representative Walker Campbell Address/Phone/Email 1446 Hwy 334 Commerce,GA 30530 (704)562-1053 walker.campbell@huber.com Category Structural Components Subcategory Products Introduced as a Result of New Technology Compliance Method Evaluation Report from a Product Evaluation Entity Evaluation Entity ICC Evaluation Service,LLC Quality Assurance Entity ICC Evaluation Service Quality Assurance Contract Expiration Date 10/01/2017 Validated By ICC Evaluation Service,LLC. Certificate of Independence FL17147 RI COI Certificate of indepg3tdence for Fvs1luation.odf Referenced Standard and Year(of Standard) Standard Year ICC-Evaluation Service AC310 2015 Equivalence of Product Standards Certified By Approved Evaluation Entity FL17147 RI Eauiv AC310 odf Sections from the Code -j' 'A.a I Fl y—aj https://www.floridabuilding.org/pr/pr app dtl.aspx?param=wGEVXQwtDgvCo3EapiIiBd... 4/12/2017 I Florida Building Code Online Page 2 of 2 Product Approval Method Method 1 Option C Date Submitted 08/31/2015 Date Validated 09/16/2015 Date Pending FSC Approval Date Approved 09/20/2015 Summary of Products FL# Model,Number or Name Description 17147.1 ZIP System(R)Wall Sheathing ZIP System(R)Wall Sheathing Limits of Use Installation Instructions I Approved for use in HVHZ:No FI 17147 R1 II ZIP Sheathing Install Manual-2013.odf Approved for use outside HVHZ:Yes Verified By:ICC Evaluation Service,LLC Impact Resistant:No Created by Independent Third Party: Design Pressure:N/A Evaluation Reports Other:limited to structural aspects of panel FI 17 47 RI AE ESR-1474 f21.Odf FL17147 Rl AE ESR1474_Ddf I I , Back Next Contact(g::20I Rlalr stone Road.Tallahassee FL 32199 phone RS0Je7-1824 The State of Florida Is an AA/EEO employer,rnayriaht 2007-2013 ate of Flarida,%privacy Slateme[:;Accessibility SWgrr1ent:: Under Florida law,small addresses are public records.If you do not want your e-mall address released in response to a public-records request do not send electronic mail to this entity.Instead,contact the olllce by phone or by traditional mad.If you have any questions,please contact 650.457.1395.`Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2022,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they have one.The emah provided may be used for official communication with the licensee.However mall addresses are public record,If you do not wish to supply a personal address,please provide the Department with an small address which can he made available to the public To determine If you are a licensee under Chapter 455,F.S.,please dirk DIM. product Approval Accepts: In Credit Card Safe https://Www.flolidabuilding.org/pr/pr app dtl.aspx?param=wGEVXQwtDgvCo3EapillBd... 4/12/2017 I w a -"15 - --- - ,�_ � _ -fit,• �ai��r - -. _. -. _ - —r._._.`_ - - - ---� - ---_ _. - { ZlP Si-st6f 0 Roo-f '& `iNaG - Sheathing. ` ftNT LLA _ 10't11 IVJ�!►4N:UL ,SafesOlflCb: 10825�OavkfTayforD�.,;Sulta3�(1 Phans:;80�-938.9220 zlpsystemoam o2m"s'HitrEry�uaedwooc�LtGPdwdtechrla7lrNcrtcxnarlmdwa��enpt�rst)rdanac+aa 'aft s 460* Fa*7D4..W 9228, FitxrFicjitaodWmoiir1Ci31Pbysci tnoaz?arsf97P&��►�a++dd?D�a�9�o�.� gtitQ.�tg4,oisdvoSau�fi3aa�q�Fseea*aifvn:kanwtkp HttB7lat SO ERE WOODS f� oaos ZIP System®Roof &Wall Sheathing Z ? //systemi^ 1 N STALLATI O N MANUAL ROOF•WAU SWAn+1N0 FASTER.TIGHTER.ENERGY EFFICIENT. IContents 02 ZiP System®Sheathing installation On Roofs 08 ZIP System®Roof&Wall Sheathing-Window Installation Flanged Windows&Brick Mould Windows 03 ZIP System"'Tape Installation- Roof Panel Seams 09 ZIP System®Roof&Wall Sheathing -Window Installation Brick Mould Windows (continued) 04 ZiP System`"Tape Installation - Roof Panel Seams (continued) 10 ZIP System®Roof&Wall Sheathing- Penetration Openings 05 Roof Covering Installation Instructions 11 ZIP System®Roof&Wall Sheathing 06 ZIP System®Roof &Wall Sheathing Installation Installation Details 07 ZIP System'o Tape installation - Panel Seams 12 ZIP System®Roof &Wall Sheathing Installation Details(continued) I ATTENTION:This installation guide is intended to provide general ZIP System Roof&Wall sheathing can be used with a range of exterior Information for the designer and end user.The following guidelines claddings and roof coverings. Approved wall coverings include brick, will help you safely and properly Install the ZIP System°Roof&Wall vinyl,stone,wood fiber cement, wood and cedar shakes,traditional hard wall sheathing.We urge you,and anyone installing this product,to coat stucco and specified drainable EIFS applications, however it is read these guidelines in order to minimize any risk of safety hazards not recommended for use with adhesively attached EIFS. Approved roof and to prevent voiding any applicable warranties. This manual is coverings include asphalt-fiberglass shingles,metal tiles and panels,day and a general installation guide and does not cover every installation concrete tiles,slate and slate-type shingles and wood shakes and shingles. condition. Proper installation shall be deemed to mean the most Follow all cladding and roof covering manufacturer's installation instructions. restrictive requirement specified by Huber Engineered Woods (HEW), local building code, engineer or architect of record or other authority ZIP System Roof &Wall sheathing can be used on buildings of Type having jurisdiction.You are fully and solely responsible for all safety III(Roof Applications ONLY)and Type V construction and construction requirements and code compliance.For additional information contact permitted under the IRC. Huber Engineered Woods LLC. ZIP System"Roof&Wall Sheathing includes: ZIP System°Roof&Wall Sheathing Safety Guidelines - ZIP System sheathing panels with built-in moisture barrier with preprinted Follow all OSHA regulations and any other safety guidelines and safety fastening and tape guides practices during installation and construction. . ZIP System tape - Use approved safety belts and/orhamessasorotherfall protection equipment Storage and Handling Install ZIP System panels and tape only in dry conditions and on dry surfaces. - Set panel stack on three supports(stickers)to keep off the ground. Do not install in rain,snow,frost or other slippery conditions. Outdoors,cover panels loosely with waterproof protective material. Wear rubber-soled or other high-tradion footwear while installing ZIP System sheathing in a roof application.Do not wear footwear with worn soles or heels. - Anchor covers top of the stack,but keep away from sides and bottom air circulation. Ensure the roofing surface Is free from oil,chemicals,sawdust,dirt,tools, to assure goad a electric cords, air hoses, clotting and anything else that might create a In high moisture environments,cut banding on the panel stack to prevent tripping hazard edge damage. - install temporary toe boards along the ZIP System sheathing roof surface. ZIP System*Roof&Wall Sheathing Notes and Limitations: - Do not use on roofs with slopes less than 2112. What Is ZIP System°Roof&Wall Sheathing? - Do not use abutted against general stone or masonry without providing a ZIP System Roof&Wall sheathing is code-recognized as a wood structural minimum of a 1/2'gap. panel, roofing underlayment (ICC-ES ESR-1473), water-resistive barrier - Do not install ZIP System tape in temperatures less than 20°F and air barrier(ICC-ES ESR-1474). ZIP System Roof &Wall sheathing - ZIP System products are not recommended for manufactured housing has abuilt-in moisture barrier that lets you say good-bye to building paper applications that are built under a federal building code administered by or housewrap on the walts and felt paper an the roof.' Simply install the the U.S.Department of Housing and Urban Development(HUD). panels,tape the seams,and you have a structural wall sheathing,water- Do not use panel edge dips(H-Clips)with ZIP System Roof&Wag sheathing resistive barrier and air barrier or a structural roof sheathing and roofing without expressed written approval from Huber Engineered Woods." underlayment all from one product. Do not use ZIP System tape to permanently seal around circular roof projections(plumbing vents,pipes,curved walls,etc.) f i r , Contents (continued) I Wall Coverings Wet Blown Cellulose Insulation ZIP System Roof&Wall sheathing should be covered with the finished - In addition to following manufacturer installation Instructions,we recommend roof covering or exterior cladding within 160 days of Installation. a maximum moisture content of the cellulose of less than 25%measured at I - Finished roof and exterior cladding products should be installed per the inside surface of the ZIP System panel before dosing the wall cavity. the manufacturer's installation instructions. Per the recommendation of the Western Red Cedar Lumber Association Secondary Coatings and the U.S.Forest Products Laboratory,wood siding should be primed Do not apply secondary coatings or treatments to ZIP System Roof&Wail before installation. sheathing panels with the exception of the following: - When original roofing or claddings are removed and replaced on existing ZIP HEW approved fire resistant coatings. Fire resistant coatings must be System sheathing,the roof or wail should be covered with an additional tested and approved by HEW for use with ZIP System panels. roofing undetiayment or water resistive barrier prior to installation of the Reid applied water-soluble borate insecticide or fungicide treatments new finished roofing or cladding. applied to the non overlay side of the panel. See technical lip,"Termite Treatments on ZIP System Roof&Wall Sheathing,"on zipsystem.com for Note.In cladding systems requiring multiple layers of water-resistive barriers, more information. like traditional hard-coat stucco,ZIP System sheathing is intended only to Permeable laminated radiant barrier foil or paint For a radiant barrier foil or replace the first layer. coating to be considered permeable,it must have an applied penneance of five perms or greater as tested by the AS7M E 96 wet cup standard.For a radiant foil,the penneance evaluation would Include any adhesive and/or backer used to laminate a foil.For a radiant paintfcoating,the permeance evaluation should be conducted at the applied thickness of the paint/coating. 1 I I ZIP System Roof and Wall sheatidng replaces arty the first layer in muttl-undedayment systems. Edge support is not required try code YAth 112(M6 span rated)and M(MO span rated)performance category,sheaftg 8 the framing does not emeed 2,V a.c. and the total toad does not exceed 93 psf for 12 and 1so psi for Sill performance categortes.This Is based on U180 deflection aileda for low load. I ! ' ` I ZIP.System°Root&Wall Sheathing installation Manual I I 02 ZIP System®Sheathing Installation on Roofs Overview:ZIP System Roof&Wall sheathing is composed of ZIP System panels and ZIP System seam sealing tape.ZIP System?Roof&Wall Sheathing panels should be fully installed before the seam sealing tape is applied.In general,the ZIP System roof sheathing panels should be installed from the lowest point on the roof to the highest.it is at the discretion of the installer whether to apply tape from the top down or from the bottom up. However,working from the highest sections of the roof and working down will minimize foot traffic on the tape.The following installation steps are presented as guidelines and a general outline of the installation process.These are manufacturer installation recommendations—please visit zipsystem.com for a library of flashing and installation details.You are fully and solely responsible for all safety requirements.Good construction and safety practices should be followed at all times. Step 1. Ensure that the panel surface is dry and clean of any nails,sawdust,or other debris or protrusions prior to installing or walking on the panels. After ensuring compliance with all OSHA and local code safety guidelines, install ZiP System sheathing panels with the moisture barrier surface facing outside.The long edge(8')should be oriented perpendicular to the framing members,and panels should be installed with the 4'edge seams staggered a minimum of 24'. 1/8'spacing between square edges of all adjacent panels is recommended, in accordance with industry standards for wood sheathing.(Tongue& g pang Edges 4'Panel Edges Groove panels are designed to self-space and do not require manual IB. ire, spacing on the 8'edges.) I I I 7 � f The unique edge profile is Maintain 1/8'space designed to accommodate where V edges meet. Incremental panel Unique edge profile is on expansion and does not 8'edges only. require manual gapping along the 8'edges. Step 2. Ensure that ZIP System panels span.at least three framing members and a framing member supports the entire 4'edge of the panels. Fasten the ZIP System Root&Wall sheathing panel to the framing members with code approved fasteners spaced at the appropriate edge and intermediate spacing, It is the responsibility of the general contractor to verify proper fastener type and spacing prior to installation. • Apply the fasteners 3/8'from the panel ends and comers. An ideal installation would be where fastener heads are flush with the panel surface. However,due to variations in materials and limitations on equipment,this may be difficult to achieve in some situations.It is not required to tape over overdriven fasteners unless the fastener head creates a hole through the entire panel thickness. Please see the technical tip,"Overdriven Fasteners in ZIP System Roof and Wall Sheathing,"for more information. Step 3. Install temporary toe boards as necessary when applying the ZIP System sheathing panels up the slope of the roof planes. I I I _ I ` 03 ZIP System""Tape Installation- Roof Panel Seams Apply ZIP System tape after all ZIP System Roof&Wall sheathing panels are fu(iy fastened to roof framing members.only ZIP System tape should be used to seal the seams of ZIP System panels.Ensure that the panel surfaces are dry and free of any nails,sawdust and other debris,or protrusions.Avoid stepping on tape in high temperature environments.ZIP System tape is a contact tape that requires pressure for an adequate seat. Step 1. Apply ZIP System tape to every vertical and horizontal panel seam. It is " at the discretion of the Installer whether to apply tape from the top down or from the bottom up. However,working from the highest sections of the roof and working down will minimize foot traffic on the tape. Ensure that the tape is centered over the seam within+/-1/2"to provide adequate coverage and to ensure that wrinkles In the tape are minimized. Ensure that tape lengths are continuous across the W horizontal edge of the panels.If splices are unavoidable,create an overlapping splice of at least 3".Apply moderate pressure onto the surface of the tape to ensure a secure bond between the panel and the tape. IIII - Use ZIP System tape gun or tape roller to apply pressure to the tape and smooth out any wrinkles. - Take special care to remove any voids and/or trapped air at splice areas and T joints. Step 2. For valley areas of framing,we recommend you use 6"wide ZIP System tape.This tape is wider than panel seam tape and is designed to give you optimal protection in valley areas. Starting from the bottom and working your way up,apply one continuous Piece of 6"tape so that the center of the tape is over the valley seam. Use the tape gun or tape roller to apply pressure to the tape to ensure proper contact with.the panel and to eliminate any wrinkles that might have occurred in the tape..Take special care to seat tape completely into the valley. Note: It is important to pay extra attention to valley taping as water is directed toward the valleys during rain events. Self-adhering ice and water barriers may be required by code.ZIP System tape is not considered a replacement for self-adhering ice and water barriers.Therefore,when sett-adhering Ice and water barriers are required,they should be Installed In addition to ZIP System tape. ZIP System°Roof&Wall Sheathing installation Manual i I 04 1 ZIP System'Tape Installation- Roof Panel Seams(continued) Step s. I - If 6'ZIP System tape is not available,use two continuous pieces of 3.75' ZIP System panel seam tape over the entire length of the valley seam, overlapping the pieces on the valley seam by at least 1'. • Starting from the bottom,Install the first piece of tape overlapping the valley seam by at least 1°. First piece Use the tape gun or tape roller to apply pressure to the tape to ensure of f ape proper contact with the panel and to eliminate any wrinkles that might have occurred in the tape. Apply the second piece of tape,overlapping the first piece in the valley seam by 1'. - Repeat use of the tape gun or roller to make sure the tape is adequately adhered and tightly pressed into the valley seam. Second piece Note: of tape - It is important to pay extra attention to valley taping as water is directed toward the valleys during rain events. - Self-adhering Ice and water barriers may be required by code.ZIP System tape is not considered a replacement for self-adhering ice and water barriers.Therefore,when self-adhering ice and water barriers are required,they should be installed In addition to ZIP 1•overlap System tape. Step 4. - To provide temporary weather protection to rooftwall intersections of dormers or other wood-sheathed projections, apply 2'of the tape width up the vertical projection from where it intersects with the roof. The remaining tape vddth can be adhered to the ZIP System roof sheathing panels. - Use the tape gun or tape roller to apply pressure to the tape and smooth . 1.Alai out any wrinkles. Step 5. - Install ZIP System tape over hips and ridges by centering the tape over the peak seam.Apply tape in sufficient length to completely extend the length of the hip or ridge. - Starting from the lowest point of the hip and working up,press tape Into place keeping tape centered over the hip.Apply moderate pressure onto the surface of the tape to ensure a secure bond between the panel and the tape. - Cut ridge tape as required for ventilation prior to Installing ridge vent. Iwo Step 6. Tape over toe board nail holes once the toe boards are removed,working from the highest toe boards to the lowest i 05 Roof Covering Installation instructions ZIP System Root&Wall sheathing is a code recognized sheathing and underlayment and is approved for use with the following roof coverings: Asphalt-fiberglass Shingles - Metal Roofs(shingles and panels) - Clay Tile - Concrete Tile - Slate and Slate-type Shingles - Wood Shingles - Wood Shakes When installing roof coverings,follow applicable codes and manufacturer's suggested Instructions.Some roof coverings require a sfip-sheet in addition to conventional underlayment.Where slip-sheets are required,they should be Installed over ZIP System sheathing panels. Note:Visit zipsystem.com for updates and installation details. j Asphalt-fiberglass Shingles Apply asphalt shingles directly to ZIP System sheathing.For roofswith a slope of 2/12 or greater but less than 4/12,additional underlayment may be required. iInstall asphalt-fiberglass shingles according to applicable codes and manufacturer's installation Instructions. �i iNetal Roof Coverings Metal roof coverings may be applied to ZiP System sheathing provided that the roof covering manufacturer's Installation instructions and applicable codes are followed. Fasteners used to secure the ZIP System Roof&Wall sheathing panels to supporting framing must be compatible with the specific metal roof covering used.Galvanized fasteners shall be used with galvanized roof coverings,aluminum-zinc coated fasteners shall be used with aluminum-zinc coated roof coverings and 300 series stainless steel fasteners shalt be used with copper roofs.Stainless steel fasteners are acceptable with all metal roof types. In addition,metal roof flashing shall also be made of a material compatible with the specific metal roof covering used.Apply metal shingles on roofs with slopes of 3/12 or greater. Clay and Concrete Tile Roof Coverings ZIP System Roof&Wall sheathing is intended to replace the first layer in a two-layer or multi-layer underlayment system.When Installing clay or concrete tile roof coverings,follow the installation recommendations of FRSA/TR107320.Install life roofs according to applicable codes and manufacturer's installation instructions. Slate and Slate-type Shingles Apply slate and slate-type shingles on roofs with slopes of 4112 of greater.Install slate and slate-type shingles according to applicable codes and manufacturer's installation instructions. Wood Shingles ZIP System Roof&Wall sheathing is Intended to replace the first layer of underlayment required by the IBC and/or the iRC.Additional layers of underlayment may be required by code depending on the local climate.Apply wood.shingles on roofs with slopes of 3/12 or greater. Install wood shingles according to applicable codes and manufacturer's installation instructions, Wood Shakes ZIP System Roof&Wall sheathing Is intended to replace the first layer of underlayment required by the IBC and/or the IRC.Additional layers of underfayment may be required by code depending on the local climate.ZIP System roof sheathing is not to be construed as a replacement for intedayment.Apply wood shakes on roofs with slopes of 4/12 or greater.Install wood shakes according to applicable codes and manufacturer's installation Instructions. iI I ZIP System®Roof&Wall Sheathing Installation Manual os ZIP Systems Sheathing Installation on Walls Overview:ZIP System Roof&Wall sheathing is composed of ZIP System panels and ZIP System seam sealing tape.ZIP System°Roof&Wall Sheathing panels should be fully installed before the seam sealing tape is applied.The following installation steps are presented as a general outline of the installation process.These are manufacturer installation recommendations—please visit zipsystem.com for a library of flashing and installation details.You are fully and solely responsible for ail safety requirements.Good construction and safety practices should be followed at all times. Step 1.Install ZIP System Roof & Wall sheathing panels positioned with the water-resistive barrier facing outside.The panels may be installed with the long side of the panel oriented either horizontally or vertically to the framing members.Walls that are designed to resist lateral shear forces and sheathed with wood r'! structural panels typically require solid framing or blocking behind all panel edges. if oriented horizontally,block horizontal joints ff wall is designed for bracing or as a shear wall. 1/8'spacing between square edges of all adjacent panels is recommended in accordance with industry standards for wood sheathing installation. 8'and 4' 8'Panel Edges Panel Edges 4'Panel Edges 1B' 1/B 1/a, stt, �N C The unique edge profile Is Maintain 1/8'space where Maintain f/8'space designed to accommodate 8'panel edges meet 4' where 4'edges meet. incremental panel panel edges.Unique edge Unique edge profile Is on expansion and does not profile does not provide 8'edges only.' require manual gapping the full 1/8'recommended along the 8'edges.' space in this situation.' Step 2.Fasten the panels to the framing members with code approved fasteners.Space fasteners 6"o.c.along supported edges and 12' 6.6.at intermediate supports,unless otherwise specified by local code or the designer of record.It is the responsibility of the general ? contractor to verifyproper fastener g prior to 1 p p type and spacing Installation.Apply the fasteners 3/8'from the ends and corners. An ideal installation would be where fastener heads are flush with the panel surface. However, due to variations in materials and limitations on equipment,this may be difficult to achieve in some situations. It is not required to tape over overdriven fasteners unless the fastener head creates a hole through the entire panel thickness.Please see the technical tip"Overdriven Fasteners in Tip System Roof and Well Sheathing," on zipsystem.com for more information. I r _ 07 ZIP System""Tape Installation-Wall Panel Seams IApply ZIP System tape after all ZIP System Roof&Wall sheathing panels are fully fastened to walbframing members.Only ZIP System tape should be used to seal the seams of ZIP System panels.Ensure that the panel surface is dry and free of sawdust and dirt prior to taping.ZIP System tape is a contact 'I tape that requires pressure for an adequate seal. 1 Step 1.Tape all seams using ZIP System tape. Ensure that the tape is centered over the seam within+/- 1/2" to provide adequate coverage and that wrinkles in tape are minimal. Use the ZIP System tape gun or roller to apply pressure to the tape and smooth out any wrinkles. i Step 2.Wherever tape splices occur at a horizontal or vertical seam,create an overlapping splice of at least 3'. At T-joints,the tape pieces should overlap by at least 1 t Apply moderate pressure onto the surface of the tape to ensure a secure bond betwe 1.en the panel and the tape. Use the ZIP System tape gun or roller to apply pressure to the tape and smooth out any wrinkles. Take special care to remove any voids and/or trapped air at splice areas and T-joints. V Step 3. Tape inside and outside comer seams. i• ''�.,�,a.a ,ate.:,��' 2 ,+:'� Irdde{Amer seam Outside comer seam 1 i1 I Note.Tape over any areas of the panel or tape that are damaged during construction. I i i ZIP System®Roof$Wall Sheathing Installation Manual 08 ZIPS stem-Window Installation DISCLAIMER:The followingcrepsrepreseMagenerafave iewlor the proper Installation oiWndow flashing.Please defer to/consuft Y the installation Instructions of your w ndow manufacturer as welt as code requirements in your jurisdiction for fug Installation details. Flanged Windows 1. Fasten the ZIP System sheathing S. Cut a length of ZIP System tape or another to the wood frame and install adhesive-backed flashing tape (must meet ICC- ZIP System tape to all wall panel ES Acceptance Criteria for Flashing Materials seams, as detailed in sections , (AC148)) and apply to the header, ensuring that 02 and 03. the flashing overlaps the jamb fiashings.• Once the tape is in place,use the tape gun or roller to seal the flashing to the sheathing. 6 . pD NOT tape bottom flange. 2. ZIP System tape may be used as pan flashing if 6. From the interior,apply low-pressure polyurethane installed in accordance with flanged window foam(for windows)between the rough opening installation details posted on zipsystem.com. and the window frame.(Caulk sealant compatible = f Other adhesive-based flashing tapes(must meet with the sill flashing may be used at the sill if the ICC-ES Acceptance Criteria for Flashing Materials i opening between the sill flashing and window (AC148))may be used as pan flashing if installed i is too narrow to allow the use of low-pressure r s f per ASTM 2112-07.Apply the flashing to cover polyurethane foam.) the bottom of the opening,overhanging onto the sheathing by at least 2'and extending a minimum When using ZIP System tape, butyl, 1009% of 6'up each jamb. , silicone or polyurethane sealants are acceptable. Do not use latex sealants with ZIP System tape.If using another flashing tape,follow the flashing manufacturer's recommendation in selecting a sealant compatible with that flashing. 3. Apply sealant around inside face of mounting Brick Mould Windows flange. Sealant must be gapped at the sill to permit drainage.Install and level window per �, 1. Fasten the ZIP System sheathing manufacturer's Installation instructions. Verify to the wood frame and install sealant compatibility with window manufacturer. ZIP System tape to all wall panel When using ZIP System tape as pan flashing, f seams, as detailed in sections \ ; butyl, 1000/6 silicone or polyurethane sealants 02 and 03. are acceptable.Do not use latex or other water- based sealants. Ll 4. Cut two pieces of ZIP System tape or another 2. If recommended by the window adhesive-backed flashing tape (must meet ICC- manufacturer,cut a strip of wood ES Acceptance Criteria for Flashing Materials to function as a back dam at the (AC148))and apply to each of the window iamb sill.The wood strip should have + flanges, ensuring the Jamb flashings overlap the a length equal to the width of the sill flashing. rough opening and a height and width of at least 1/2'.Position the Once the tape is in place,use the tape gun or roller 5 block at the inside edge of the to seal the flashing to the sheathing. window frame. i i 09 ZIP System -Window Installation alsctnllw>r�:The following steps represent o general overview for the proper installation of window Oashing.Please defer tolconsu0 the installation nstructions of your window rmnufeehirer as well as code requirements in your jurisdiction for U installation details. Brick Mould Windows(continued) 3, ZIP System tape may be used as pan flashing if 7. Cut a piece of rigid head flashing so that when I installed In accordance with brick mould window installed,it is flush with the edges of the exterior Installation details posted on zipsystem.com. moulding of the window.Apply a bead of sealant Other adhesive-based flashing tapes(must meet to the back and bottom surface of the rigid ICC-ES Acceptance Criteria for Flashing Materials head flashing.Use sealant recommended by the (AC148))may be used as pan flashing If installed flashing manufacturer. per ASTM 2112-07.Apply the flashing to cover the bottom of the opening,overhanging in onto the sheathing by at least 2'and extending a minimum of 6'up each jamb. 8. Secure the rigid head flashing to ZIP System wall sheathing. �I 4. For vertical jambs,cut ZIP System tape or another adhesive-backed flashing tape (must meet iCC- ES Acceptance Criteria for Flashing Materials (AC148))and apply to each of the windowjambs. Ensure that they cover the entire inside of the rough opening as well as overlap onto the sheathing by t), Cut a length of ZIP System tape or another rough least Flashing shall also extend above the 'ti` j adhesive-backed flashing tape(must meet ICC-ES ugh opening, ng,such that it will project 1'beyond Acceptance Criteria for Flashing Materials(AC148)) the exterior trim of the window. and apply to the rigid head flashing, ensuring Once the tape is in place,use the tape gun or roller that the adhesive-backed flashing overlaps the to seal the flashing to the sheathing. jamb(lashings. Once the tape is in place,use the tape gun or roller to seat the flashing to the sheathing. 5. Apply sealant to jambs and header allowing for drainage at the sill in accordance with window manufacturer's installation instructions. When 10,From the interior,apply low-pressure polyurethane using ZIP System tape,use a butyl,polyurethane foam(for windows)between the rough opening and or 100°16 silicone sealant Do not use latex or the window frame. (Caulk sealant compatible with ' other water-based sealants with ZIP System the sill flashing may be used at the sill it the opening tape.When using'another flashing tape,follow the a between the sill flashing and window is too narrow flashing manufac-curer s recommendations in to allow the use of low-pressure polyurethane foam.) selecting a sealant compatible with that flashing. When using ZIP System tape,butyl,100%silicone s = or polyurethane sealants are acceptable. Do notJ i use latex or other water-based sealants:with ZIP System tape.If using another flashing tape,follow fi. Install and level window per manufacturer's the flashing manufacturer's recommendation in installation instructions. selecting a sealant compatible with that flashing. ( j f i i � I ZIP Systems Roof&Wall Sheathing Installation Manual I 10 Gd System-Penetration Openings plSCLNMfp:Tha IoltaW ng steps represent a ganetol over'-iLx the proper Installation of penetraGan Hashing.Please dolor Ickomull Y your coda requlowts in yaw junsd crion tar and instegat an delelts, 1 WAl16HEAT1016 J \~��\\\\\ NT100 OR LT,OA1@TK 911>DS GTHE 1aPP REfJIILVENGGa AT �WALL7�AT1810 'PM'FI EOOES UMFJ9 WOOD OR LT.OALETAL8Dp9 pD¢INlSGPADY®EDDY L YJ,pO@.p RiOTifO 6Ou£S Pb LOOM LO.w NDFD AT D9 R4TLJM LNSTAtLFD PUID.EDOESOMEE9 OXL 91EAn lNLPBTSTFYD DOEe1WL5[N1OV W EWALL SNE ATIONDl WfJMIDFROF6EOEDDTS '>@S'YSTfliBTAPEINSrAItFD OVFRAP TAPE A YLIW W OP OVERALLJDN WMSYGTE" '�WATYLT.IOIR! wul SaaTrena} gx �IRSTAlifmowam TAPEATNl OVEPyW TAAEA NNWAOF tiiCHAT ALL TOINTS FASMZP'YS WALL NSTA4aP4TliEW TA16ATAu @E.I VIED BY YILERIORCOmO:A3 DNu;-01etccoO O IOCL qcooE FAsrFi�ssrsivewAu Aa€ATrwaAaraDuazfner g D�nar+aEUAnDRLaer1 euLDm:a mob WALL ASSEMBL WALL ASSEMBLY ZP SYSTEMO WYALL SHEATHING ZIP�WALL SHEATHING WOOD OR LT.GA.METAL STUDS WOOD OR I.T.GA.METAL STUDS 144NCH GAP RECOMMENDED AT 1I8{NCH GAP RECOMMENDED AT PANEL EDGES UNLESS PANEL EDGES UNLESS OTHEMISEPROVIDEDSY „ ?'j OTHERWISE PROVIDED BY MACHNED PROFILED EDGES MACN:NEO PROFILED EDGES INSTALL ZIP SYSTEMDTAPE OR .'' is INSTALL ZIP SYSTEMATAPE OR I ADHESIVE BACKED FIJSFLNG MUST +, ADHESIVE BACKED FLASHING IMUST NEST ACT4d)IN SEOUENCB FROM NEEr AC148)IN SEQUENCE FROM BOTTOM,SIDES,THEN TOP TO BOITOM,SmE3;THEN TOP TO ENSURE SHINGLE LAP OF ADHESIVE ENSURE SHINGLE LAP OF ADHESIVE BACKED FLASHING _ :.,1 BACKED FLASHING ZIP SYSTEMDTAPE ONSTALLEO •.Sp?.; .` ZIP SYSTEMOTAPE(INSTALLED OVERALL JOINTS IN DPSYSTEM® .,�2;, OVERWALL SALLL JOINTS J�OIIN ZIP SYSTEM® WALL SHEATHING} APTAPEA MINIMUM OF •v OVERLAP TAPE MINIMUM OF 14NCH 1-INCH AT ALL TJOfMS /JNCH AT ALL TJ01NT5 USE FLANGED VENT HOODS USE FLAN.ED ELECTRICAL ~ 80AES OR MEMBRANE FLASHING TO PROVIDE FLANGES FOR ELECTRICALBD%ES I I i I � 11 ZIP System Sheathing Installation Details on Walls-visit zipsystem.com for more details. WALLASSEMBLY WALL ASSEMBLY AT VINYLIWOOWIBER CEMENT SIDINGTIT BRICK VENEER (INSTALLED IN ACCORDANCE WITH AIR SPACE(AS PRESCRIBED BY CLADDING MANUFACTURERS LOCAL BUILDING CODE) INSTALLATION RECOMMENDATIONS) ZIP SYSTEMS WALL SHEATHING 71P SYSTEMS WALL SHEATHING WOOD OR LT.GAMETAL STUDS WOOD OR LT.GA.METAL STUDS TOP EDGE OF FLASHING TAPED TO TOP EDGE OF FLASHING TAPED \.`\ WALL SHEATHING WITH ZIP SYSTEMS WITH ZIP SYSTEMS TAPE OR TAPE OR ADHESIVE BACKED ADHESIVE BACKED FLASHING. ;\ FLASHING.(MUST MEET ACM) (MUST MEETAC1481 CODE APPROVED FLASHING CODEAPPROVEDBASE FLASHING '•�� WEEP HOLES(AS PRESCRIBED FOUNDATION BY LOCAL BUILDING CODE) WALL AssEMEav wU AIR SPAM(AS PRES CR BED BY (NSTALLEDINACCCRANMI1TH LO DINGCOOS) LDOIN UFA7FUREIT ZIPSYSTE T.WALLSHEATHING INSTALLATION REOMMECA bi WOOD OR L7.GA METAL STUD ZF SVSTEM WALL SHEATHING wow ciL.GA LETL STUDS S 111P"GAP RECOMMENDED AT 11SNCHGAP RECOMMENDED AT PANEL EDGES UNLESS PANEL EDGES UNLESS OTHERMSEPROVIDED BY OWIERWRE PROVIDED BY MACHINED PROFULEO EDGES I MACHINED PROFLE0 EDGESZIP SYSTEMID TAPE(INSTALLED ZIP 1 �& OVER ALL JOINTS O TAPE IAYSTALLEO � 1`:. OVER KL JDMTS IN ZIP SYSiENO OVER HET01 'S"SYELEMo WALL SHEATIONt7i. � wALLS11EATHNDt �_ �rY«•y"�x `\� C• OVERLAPTAPE A MWWUM OF \`\ '+r, OVERLAPTAPE A MINIMUM OF \ NNCHATALLT.AATTS VINCHATALLT.WNTB IAFINCH GIP REOGIAMODEDAT \ 1184RCH GM RECOMMENDED AT PANEL EDGES UNLESS PANEL EDGES UNLESS 0711ERW6EPROVDEO BY OTNERYASE PROVIDEDBY MACHINEDPROFILM EDGES MACHINED PROFHED EDGES FASTEN aP SYSTEMS WALL SHEATRNG AS REWIRED BY FASTEN ZIP SYSTEMS WALL GES-GNEROFRECORD OR LOCH. SHEATHING AS REQUIRED BY BUILDING CODE DE=.%R-OF.RECORO OR LOCAL BUILDING CODE Note:For optimal air leakage reduction,all untsped edges of the panels can be caulked,gasketed or sealed with a weather stripping material. ZIP System®Roof&Wall Sheathing Installation Manual 12 ZIP System Sheathing Installation Details on Walls (continued) j WALL BEYOND i WALL ASSEMBLY •,` BACKDAM PER WINDOW BRICK VENEER MANUFACTURER'S INSTALLATION � AIR SPACE(AS PRESCRIBED BY _.' RECOMMENDATIONS LOCAL BUILDING CODE) ' ZIP SYSTEM®WALL SHEATHING `; ` WOOD OR LT.GA,METAL STUDS INSTALL FLASHING IN ROUGH SILUPAN FLASHING IN ROUGH OPENING PRIOR TO WINDOW TOP EDGE OF FLASHING TAPED INSTALLATION. WITH ZIP SYSTEMO TAPE OR !I ADHESIVE BACKED FLASHING. \\ TOP EDGE OF FLASHING TAPED (MUST MEET AC148) WITH ZIP SYSTEM®TAPE OR ADHESIVE BACKED FLASHING. CODE APPROVED FLASHING (MUST MEETAC148) \ \� WEEPS(AS PRESCRIBED BY \ ,� WEEPS(AS PRESCRIBED BY LOCAL BUILDING CODE) ` LOCAL BUILDING CODE) STEEL LINTS! CODE APPROVED FLASHING NX INSTALL WINDOW IN WALL ASSEMBLY `` - ACCORDANCE WITH DETAILS BRICK VENEER , 24A-24D OR 25A-25D AIR SPACE(AS PRESCRIBED BY LOCAL BUILDING CODE) ZIP SYSTEMO WALL SHEATHING WALL BEYOND WOOD OR LT.GA.METAL STUDS WALL ASSEMBLY CODE APPROVED CLADDING (INSTALLED IN ACCORDANCE WITH CLADDING MANUFACTURER'S INSTALLATION RECOMMENDATIONS) EXTERIOR RIGID INSULATION DRAINAGE PLANE(MIN.Ye) ZIP SYSTEM®WALL SHEATHING WOOD OR LT.GA.METAL STUDS TOP EDGE OF FLASHING TAPED TO WALL SHEATHING WITH ZIP SYSTEMO TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AC148) CODE APPROVED FLASHING FOUNDATION I. Note.For optimal air leakage reduction,all untoped edges of the panels can be caulked,gasketed or seated with a weather stripping material. S 'f .f � �,�?'� �,,��•;�.. .� �.x.�„�; fir.. •ice+.�� '. �...� ty x s „ire. �r ♦� ,�� � "'�' . � eF �'4� k f��} _ ��. aka 's, w• �¢� � �, a r zw• x r,;�� � .� �. w� ��, r�'�� � .,� a� ids.•,� = .� � tr '''fig ��'�^¢r��r "� Wt� � .er b _ " �c. `#•<�,£� a9` ! I� y}[ 4Y 'Elxa gyp.... 17, I. "yi++! i�.y � `* T;r�,1^yr•'+¢- � � tk*'�*��. ��s' £{fit: �'�,E.ti+�y.'`_ � r��,• 1 b...a,. ! ���� �•b1g �� ��4 �� Y y �l r�i p` -ay'E. � � y�'�'^�L•e4;s"� t �f # � �`i ��.i"r�w s R .��,f� ti `'rt"°' ,,,. �.. B d t �t .. �� • 'z.' �� _. . .AV I I I i TEM@ SHEATHING WITH HARD COAT STUCCO AT ZIP sus H-2 BLOCK FOUNDATION WALL- OPTION A �I TRADITIONAL HARD-COAT STUCCO LATH INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S OR THE PORTLAND CEMENT ASSC.(PCA) RECOMMENDATIONS WITH THE MOST ONE LAYER OF WATER41ESISTVVE RESTRICTIVE CONTROLLLING. VAPOR-PERMEABLE BARRIER WITH A PERFORMANCE AT LEAST EQUIVALENT TO GRADE D BUILDING PAPER, i ZIP SYSTEM®SHEATHING* TOP EDGE OF WEEP SCREED WITH ZIP SYSTEM®TAPE OR i M: :+• �'",'' ADHESIVE BACKED FLASHING. XA (MUST MEET AAMA 711 OR ' AC148) WOOD OR LT,GA. METAL STUDS I ADHESIVE BACKED MEMBRANE BRIDGE FLASHING CENTERED OVER TRANSITION JOINT(ZIP SYSTEM TAPE MAY BE USED AS THE BRIDGE FLASHING) 0 0 0 0 CODE-APPROVED WEEP SCREED AT BASE OF WALL - ,• VERTICAL AND HORIZONTAL }r CONTROL JOINTS AS NEEDED. DESIGNER OF-RECORD TO `•- SPECIFY TYPE AND LOCATION. �y MASONRY BLOCK WALL 'ZIP SYSTEM®SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO-LAYER UNDERLAYMENT SYSTEM. DRAWING NOT TO SCALE o >v Sales Office:10925 David Taylor Drive N � Suite 300-Charlotte,NC 28262 OR ENGINEERED 6 SHEATHING&TAPE Telephone:800.933.9220-www. ipsystem.comMystem WOODS 0 These construction etails are provided to assist in the installation o ct s)and may not to every situation. Manufacturer accepts no responsibility or liabiliity for the use of these or other construction details. i 1 ZIP SYSTEM® SHEATHING WITH HARD COAT STUCCO AT BLOCK FOUNDATION WALL- OPTION A H-2 WALLASSEMBLY TRADITIONAL HARD-COAT STUCCO METAL LATH ONE LAYER WATER-RES.BARRIER ZIP SYSTEM®SHEATHING* WOOD OR LT.GA.METAL STUDS TOP EDGE OF WEEP SCREED TAPED TO WALL SHEATHING WITH ZIP SYSTEM®TAPE OR ADHESIVE BACKED FLASHING. (MUST MEET AAMA 711 OR AC148) CODE-APPROVED WEEP SCREED AT BASE OF WALL ADHESIVE BACKED MEMBRANE BRIDGE FLASHING CENTERED OVER TRANSITION JOINT(ZIP SYSTEM / TAPE MAY BE USED AS THE BRIDGE I FLASHING) MASONRY BLOCK WALL LATH TOP EDGE OF WEEP SCREED TAPED \ TO WALL SHEATHING WITH ZIP \ f SYSTEM®TAPE OR ADHESIVE BACKED I FLASHING. (MUST MEET AAMA 711 OR AC148) TRADITIONAL HARD-COAT STUCCO \\ 1 INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S OR THE PORTLAND CEMENT ASSC.(PCA) RECOMMENDATIONS WITH THE MOST 1 RESTRICTIVE CONTROLLLING. ONE LAYER OF WATER-RESISTIVE VAPOR-PERMEABLE BARRIER WITH A PERFORMANCE AT LEAST EQUIVALENT TO GRADE D BUILDING PAPER. j CODE-APPROVED WEEP SCREED AT BASE OF WALL ADHESIVE BACKED MEMBRANE / BRIDGE FLASHING CENTERED OVER TRANSITION JOINT(ZIP SYSTEM TAPE MAY BE USED AS THE BRIDGE FLASHING) MASONRY BLOCK WALL �- �R�y�N�NOT TO SCALE 'ZIP SYSTEMS SHEATHING IS APPROVED TO REPLACE ONLY THE FIRST LAYER OF A TWO-LAYER UNDERIAYMENY'SYSIEM. rc� _ Sales Offic00-Ch5 David Taylor Drive ��V�� ENGINEERED -a& S}3�/77 Suite 300-Charlorie,NC 28262 � WOODS SHEATHING 8 TAPE Telephone:800.933.9220-www.zipsystem.com These construction details are provided to assist in the instal ation of IP ystem®products and may not apply to every situation. Manufacturer accepts no responsibility or liability for the use of these or other construction details. -- --------