Loading...
HomeMy WebLinkAboutInpsction Results-temp toliet ®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: Permit No. - - P,oject: �-) K s c;o& Address: 3 A-- Try C e;�_ Check one: Regular Inspection: Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL _ Footing Underground Underground Duct Rough-In Slab Floor Rough-In Rough-In Steam Piping&Test Masonry Wall Rough-In Stack Piping&Test HW Piping&Test Wall/Ceiling Ceiling Rough-In Water Piping& Test CHW Piping&Test Framing Panel/Feeder Gas Piping&Test Cond. Piping&Test Structural Service/Ground Storm Piping&Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re-inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results: ) AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP-Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: A OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772)924-3580 (fax) www.tea mgfa.coin