Loading...
HomeMy WebLinkAbout20-202 Ocean Harbor N - Bldg E - Rep 2 - 03.10.21 - DSSM L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 20-202 Report No. 2 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmnt. St. Lucie County Bldg. Dept. Mr. Robert Stark – Structure-Con Mr. Khris McConnel – Structure Con Page 1 of 3 THRESHOLD INSPECTION REPORT OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. E CONCRETE REPAIRS 5167 N. HWY. A1A, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 2009-0182 PROJECT NAME: Ocean Harbor N. Condos – Bldg. E Concrete Repairs DATE: March 10, 2021 CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Units 108/208, 408/508, and 708/808 OBSERVATIONS: Shoring is in place as specified in the permit drawings. Unit 108/208 • The screen enclosure was removed from both units at the spalled areas. • Loose concrete was removed from the slab edge. • (2) Post tension cables at the west edge of balcony have been locked off. • An additional crack was found next to one of the cables, but not yet removed. (See recommendations.) • There was a crack in the concrete behind an adjacent cable running in the perpendicular direction of the cables being repaired. Unit 408/508 • The screen enclosure was removed from both units at the spalled areas. • (13) Post tension cables at the north edge of balcony have been locked off. • Corroded bursting bars were found at the slab edge. • Spalling in the concrete extended 3’-6” from the slab edge into the balcony. Unit 708/808 • Partial depth ceiling spall was repaired near the slab edge. • Minor surface corrosion was found on the reinforcing bars. • No deteriorated cables were found. RECOMMENDATIONS: Unit 108/208 • Lock off additional cable at the north edge of balcony where concrete is cracked prior to removing the remaining spalled concrete. • Remove the remaining screen enclosure that is attached to the face of the 2nd floor balcony along the west edge. • Remove loose concrete at the slab edge for further inspection of the post tension cables. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 20-202 Report No. 2 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmnt. St. Lucie County Bldg. Dept. Mr. Robert Stark – Structure-Con Mr. Khris McConnel – Structure Con Page 2 of 3 Pic 1 Units 108-808 North elevation Pic 2 Unit 108/208 (2) PT cables locked off Pic 3 Unit 108/208 Anchor plates removed from cable ends and loose concrete removed M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 20-202 Report No. 2 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmnt. St. Lucie County Bldg. Dept. Mr. Robert Stark – Structure-Con Mr. Khris McConnel – Structure Con Page 3 of 3 Pic 4 Unit 408/508 Post tension cables along the north end of balcony have been locked off Pic 5 Unit 708/808 Ceiling spall repair