Loading...
HomeMy WebLinkAboutVegeation removal const_Activity_brochure-PLEAESE PRING WITH VEG REMOVAL PERMIT*A new online system called Interactive Notice of Intent (INOI) is now available to the public. Applicants that use iNOI can complete, save, edit, __ o o pay for (using a credit card) and submit NPDES Stormwater applications o o M. � online. The use of iNOI is encouraged but voluntary. Applicants can still o w cn submit paper notices. iNOI is available at www.dep.state.fl.us/water/ o o� stormwater/npdes/ w 3 WA� 5. ifyou complete a paper NO[, submit it along w h the application fee, as 3 o (D CID indicated below, to the NPDES Stormwater Notices Center. Authorization a is usually granted 48 hours after the date the complete N0I is post- c p marked to the Notices Center. o p � The fee is required by Rule 624.050(4) (d), EAC.. Make checks payable o to the Florida Department of Environmental Protection. :3 3 Large Construction (disturbs 5 or more acres of land) is $400. m Small Construction (disturbs between 1 and 5 acres) is $250. u3 6. Re -apply for coverage every five years (if the construction activity ex- o tends beyond a 5-year period) or submit an NOT to terminate coverage. CID Where Can I Find More Information? eDEP's Web site provides more information on program - coverage and requirements, useful Web links, and electronic - versions of the CGP, all regulations and forms cited herein, - and SWPPP guidance. In addition, the NPDES Stormwater - Notices Center provides hardcopies of permits and forms. - e NPDES Stormwater Section Florida Department of Environmental Protection - 260o Blair Stone Road, MS #2500 - Tallahassee, FL 32399-2400 - (850) 245-7522 - Email NPDES-stormwater@dep.stateAus - e iNOI www.dep.state.fl.us/water/stortnwater/npdes eNPDES Stormwater Notices Center Florida Department of Environmental Protection - 260o Blair Stone Road, MS #2510 - Tallahassee, FL 32399-2400 - (866) 336-6312 (toll free) or (850) 297-1232 The Florida NPDES Stormwater Permitting Program for Construction I Activity �VtO1E(IION FLOR A PRINTED ON NE(YQEO PAPER 03/09 What is Florida's NPDES Stormwater Permitting Program for Construction Activity? In October 2000, the U.S. Environmental Protection Agency (EPA) authorized the Florida Department of Environmental Protection (DER) to implement the National Pollutant Discharge Elimination System (NPDES) stormwater permitting program in the State of Florida (with the exception of Indian Country lands). The program regulates point source discharges of stormwater runoff from certain construction sites and was developed by EPA in two phases: Phase I regulates "large" construction activity (disturbing 5 or more acres of total land area) and Phase II regulates "small" construction activity (disturbing between 1 and 5 acres of total land area). The "operator" (i.e., the entity that owns or operates the project and has authority to ensure compliance) of regulated construction sites must obtain an NPDES stormwater permit and implement appropriate pollution prevention techniques to minimize erosion and sedimentation and properly manage stormwater. DER adopted under Rule 62-621.300(4), EA.C, the Generic Permit for StorrntvaterDisebargefrone Large and Small Construction Activities (CGP) (DER Document 62-621.300(4) (a)) which is applicable to Phase I large construction and Phase 11 small construction. It is important to note that the permit required under DEP's NPDES Stormwater permitting program is separate from the Environmental Resource Permit (ERR) required under Part N, Chapter 373, F.S., a stormwater discharge permit required under Chapter 62-25, F.A.C., or any local government's stormwater discharge permit for construction activity. Which Construction Activities Are Regulated Under The Program? DER's permitting program regulates construction activity that meets the following criteria: Contributes stormwater discharges to surface waters of the State or into a municipal separate storm sewer system (MS4). Disturbs one or more acres of land. Less than one acre also is included if the activity is part of a larger common plan of development or sale that will meet or exceed the one acre threshold. Disturbance includes clearing, grading and excavating. What Does the CGP Require? • A CGP Notice of intent (NOI) (DER Form 62- 621.300(4) (b)) must be submitted to DER A Stormwater Pollution Prevention Plan (SWPPP). In pact, the plan must include the following: — -A site evaluation of how and where pollutants may be mobilized by stormwater — -A site plan for managing stormwater runoff, — -Identification of appropriate erosion and sediment controls and stormwater best management practices (BMPs) to reduce erosion, sedimentation, and stormwater pollution, — -A maintenance and inspection schedule, — -A recordkeeping process, and — -Identification of stormwater exit areas. • ANotice of Termination (NOT) (DER Form 62-621.300(6)) must be submitted to DER to discontinue permit coverage. An NOT may be submitted only when the site meets the eligibility requirements for termination specified in the CGP. Structural Controls • - Retention Ponds. Permanent structures designed to allow time for sediments to settle and water to infiltrate the ground. • - Temporary Sediment Basins. Structures designed to detain sediment -laden runoff from disturbed areas long enough for sediments to settle out and control the release of stormwater. • - Entrance/Exit Controls. Temporary controls, such as gravel, used to stabilize the entrances/exits to the site to reduce the amount of soils transported onto paved roads by vehicles (known as "track -out"). • - Silt Fencing. A temporary erosion and sediment control used to prevent dirt from entering waterways before bare soil is stabilized with vegetation. • - Berms. A temporary erosion and sediment control that physically prevents polluted runoff from entering nearby storm drain inlets and waters. Non -Structural Controls • - Stabilization. Techniques such as sodding, seeding/ mulching and stone cover, which reduce the erosion of exposed soils and steep grades. • - Phased Construction. Scheduling construction to occur during the dry season or to minimize the amount of land cleared at anyone time. • - Good Housekeeping. Techniques such as of and fuel containment, spill prevention and clean-up, and street sweeping of "tracked -out" soils, which help prevent the contamination of stormwater runoff. Now Do I Obtain Permit Coverage? To obtain NPDES stormwater permit coverage, complete the What Are Some Examples of BMPs? following steps: A comprehensive SWPPP includes both structural and non- 1. Obtain a copy of the CGP. structural controls. Some commonly used controls follow: 2. Carefully read the permit language. Visit DEP's Web site at 3. Develop and implement a SWPPP. 4. Complete an N01 in its entirety online using the iNO1 system * or by submitting a paper N01. www.dep.state.fl.us/water/stormwate