Loading...
HomeMy WebLinkAboutEngineer's Field Observation Report & Final Close outYJA CATq r .II MATHERS ENGINEERING CORPORATION Memo To: Plan Reviewer Co: St Lucie Co. Building Dept. 2300 Virginia Avenue Fort Pierce, FL 34982 2431 SE Dixie Hwy Stuart, FL 34996 Phone: (772) 287-0525 Email: mathersengineers@bellsouth.net From: Holly Mathers Pages: SEE ATTACHED Fax: Date: 10/20/2020 Re: Oceanrise Condominium Phone: 10310 S. Ocean Drive, Jensen Beach Concrete Restoration Permit #SLC 2003-05091 ❑ Please Reply' X Mailed ❑ Hand Delivered ❑ Faxed Only ❑ Faxed and Mailed Enclosed is 1 signed and sealed engineer's field observation report #2 and Final Close -Out for the concrete restoration permit #SLC 2003-0509 for Oceanrise Condominium Thank you, Holly This message is intended only for use of the individual or entity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the message is not the intended recipient; or the employee or agent responsible for delivering the message, you are hereby notified that any dissemination, distribution or copying of the communication is strictly prohibited. If you have received this communication in'error, please notify us immediately by telephone and return the original message to us at the address above via the U.S. Postal Service. MATMERS ENGINEERING CORPORATION 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#0004456 Post-BuildinLy Permit Addendum Engineer's Field Observation Revor Date: October 19, 2020 To: St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 Referenced Project: Concrete Restoration for Exterior Balconies for Oceanrise Condominium Stack 1 Unit Numbers ((101, 201, 301, 401, 501, 601 and 701) 10310 S. Ocean Drive, Jensen Beach, Florida 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy. Jupiter, FL 33458 Permit #2003-0509 Mathers Engineering Corporation, visited the job site and made the following observations of the ongoing concrete restoration and repairs of exterior balconies: Stack #01 Balconies: • Unit 101: Concrete restoration has been completed. • Unit 201: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 301: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 401: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 501: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 601: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. • Unit 701: Concrete restoration has been completed; guardrails have been re -installed. Shutters have not yet been re -installed. F T. 2431 SE Dixie Highway 4A W19 Stuart, FL 34996 Phone: (772) 287-0525 MATHERS ENGINEERING EB#0004456 CORPORATION Limitations: Our professional services have been performed, our findings obtained, and our opinions prepared in accordance with general accepted lengneering principles and practices. This company is not responsible for the conclusions, opinions or recommendations made by others based on our findings. Approved by: P'011 MgTAx 4t; /� P ,19658 •;N William J. Mathers, Pe STATE OF = Florida License PE #1� �•, ��0R10P-,•����� Florida SI #155 �X.�Fss, DNA L .y MATHERS ENGINEERING CORPORATION FINAL CLOSE-OUT ON RESTORATION WORK Date: October 20, 2020 To: St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, FL 34982 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#0004456 Referenced Project: Concrete Restoration for Common Walkways and Exterior Balconies (decks, beam & columns) For Stack 1 Unit Numbers (101, 201, 301, 401, 501, 601, and 701) for Oceanrise� Condominium Located ai 10310 S. Ocean Drive, Jensen Beach, FL 34957 Contractor: DMF Construction 312 S. Old Dixie Hwy., Jupiter, FL 33458 Permit No. 2003-0509 The completed concrete restoration did not reduce the structural integrity of the remaining existing structural systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's components and elements outside the renovation area of this permit do not have their current wind load resistant capacity or gravity load capacity compromised by the completed concrete restoration. Mathers Engineering Corporation performed onsite inspections as the job progressed. Repairs did not require shoring. As the demolition exposed areas of exterior concrete deterioration and steel corrosion of the exterior balcony deck, we initiated and inspected restoration work such as concrete preparation, steel reinforcement restoration, and application of bonding agents, and finished concrete applications. The enclosed Record Drawing (Sheet 1) shows the areas of repair for Stack 1 and is made part of this final close-out document approval under Permit Number 2003-0509. Materials used and work performed to date has been substantially completed in conformance with the specifications outlined in the IRCI Guideline No. 03 73 0, as well as the applicable 2017 Florida Building Codes, 6th Edition (and updates), other industry guidelines, or standard engineering practices. Approved by, William J. Mathejl J = Mq 19658 020(0 . STATE OF ; : Q Florida License #1 S;'�C ORIOP;G���!;: � Special Inspector FL 1 //lllllll\ COLUMN REPAIR+ Cll 84'x 8'x 6' BEAM (LINTEL) REPAIR; B11 116'x 8'x 6' or 9,67 FT, REBARS: TOTAL DOWELS = 4 NEW BARS, #4 BARS = 124' or 10.33 L.F. #5 BARS = 168' or 14.0 L.F. LIVING ROOM OCEANRISE —STACK 1 UNIT 101 CONCRETE DECK RESTORATION, 1. EDGE REPAIR; 204'x 12' 2. EDGE REPAIR: 265'x 12' BEAM (LINTEL) REPAIR: 3, EDGE REPAIR: 12' x 12' Bl; 12'x 12'x 4' 4, FULL DEPTH; 180'x 4' TOTAL CHARGE = 12 FT 5, PARTIAL DEPTH, 14' x 96' 6, PARTIAL DEPTH, 10' x 18' 4'-0' 7. PARTIAL DEPTH, 10' x 8' 8, PARTIAL DEPTH, 29' x 23' 9. PARTIAL DEPTH, 8' x 8' COLUMN REPAIR, C2 Cli 21'x 8'x 4' @ BOT, C2; 18'x 8'x 4' @ BOT. 9 DECK REPAIRS TOTAL DOWELS = 3 ; NEW BARS: (15)#4 EDGE BARS @ 120' = 1800' (1)#4 PERP. BAR @ 18' = 18' TOTAL #4 BARS = 1818' OR 151,5' LIVING ROOM CONCRETE DECK REPLACE 1, FULL DEPTH: 192 DECK REBARS: TOTAL DOWELS = 20 NEW BARS; (45)#4 HORZ, BARS @ 10' TOTAL #4 BARS = 450 F BEAM (LINTEL) REPAIR: Bll 12'x 12'x 4' TOTAL CHARGE = 12 FT l a . e. • e .e z 4• ' +� i i •e •.e... a: 12'-4' ♦ IVING ROOM `u 8' $1. 0 ' • as a , a l0 NQ. �.j• .e..•. EXIST, DECK REMOVED & a. REPLACED WITH'l NEW DECK.., { + n. -a 1T-0's .I OCEANRISE —STACK 1 UNIT 201 CONCRETE DECK RESTORATION, 1, EDGE REPAIR: 204'x 12' 2, EDGE REPAIR: 265x 12' 3. FULL DEPTH; 192'x 12' 4, FULL DEPTH; 253''x 4' 5. PARTIAL DEPTH, 37' ix 25' COLUMN REPAIR: C1: 29'x 7'x 6' @ BOT, C21 41'x 14'x 4' @ BOT, C3: 24'x 34'x 6' @ BOT. DECK REPAIRS TOTAL DOWELS = 10 NEW BARS, (15)#4 EDGE BARS @ 120'i= 1800' TOTAL #4 BARS = I800' R 150' LIVING ROOM BEAM (LINTEL) REPAIR: Bl; 12'x 12'x 4' TOTAL CHARGE = 12 FT 4'-0' 1T-0' r 17'-0' OCEANRISE — STACK 1 UNIT 501 OCEANRISE — STACK 1 UNIT 601 1, EDGE REPAIR, 204'x 12' 2, EDGE REPAIR; 265'x 12' 3. EDGE REPAIR: 12' x 12' 4. FULL DEPTH; 180'x 4' 5, FULL DEPTH; 261'x 4' 6, PARTIAL DEPTH; 12' x 72' 7. PARTIAL DEPTH; 8' x 8' 8, PARTIAL DEPTH; 12' x 16' COLUMN REPAIR, C1: 20'x 8'x 4' @ BOT, C2; 48'x 10'x 8' @ BOT, DECK REPAIRS TOTAL DOWELS = 2 NEW BARS, (15)#4 EDGE BARS @ 120' = 1800' (2)#4 PERP. BAR @ 27' = 54' TOTAL #4 BARS = 1854' OR 154.5' LIVING ROOM BEAM (LINTEL) REPAIR, B1; 12'x 12'x 4' TOTAL CHARGE = 12 FT OCEANRISE — STAC'K 1 CONCRETE DECK RESTORATION; 1, EDGE REPAIR, 204'x 12' 2, EDGE REPAIR: 180'x 12' 3, EDGE REPAIR, 12' x 12' 4, PARTIAL DEPTH: 12' x 12' COLUMN REPAIR, C1; 24'x 12'x 4' @ BOT, C2116'x 10'x 4' @ BOT, C31 36'x 12'x 6' @ BOT, C4118'x 18'x 4' @ BOT, DECK REPAIRS TOTAL DOWELS = 3 NEW BARSI (12)#4 EDGE BARS @ 120' = 1440' TOTAL #4 BARS = 1440' OR 120' LIVING ROOM O 3 cu 6 17'-0' L OCEANRISE — STACK 1 UNIT 701 CONCRETE DECK RESTORATIONI 1, EDGE REPAIR; 204'x 12' 2. EDGE REPAIR; 265'x 12' 3. EDGE REPAIR; 12' x 12' 4, EDGE REPAIR; 36' x 12' 5, FULL DEPTH; 186 x 4' 6, FULL DEPTH; 249'x 4' 7. FULL DEPTH; 28' x 4' 8. PARTIAL DEPTH: 12' x 12' 9, PARTIAL DEPTH; 16' x 12' 10, PARTIAL DEPTH, 12' x 12' COLUMN REPAIR: C1; 36'x 10'x 6` @ BOT. DECK REPAIRS TOTAL DOWELS = 8 NEW BARS: (15)#4 EDGE BARS @ 120' = 1800' TOTAL #4 BARS I= 1800' OR 150' at d LIVING ROOM BEAM (LINTEL) REPAIR, Bl; 12'x 12'x 4' TOTAL CHARGE = 12 FT 1T-0' OCEANRISE — STACK 1 UNIT 401 STACK 1 BALCONY REPAIRS 1 2 3 4 5 6 7 8 9 10 OCEANRISE - KEY MAP HATCH REPAIR LEGEND, IT i, FULL DEPTH e 2, PARTIAL DEPTH ® 3, EDGE REPAIR 4, OVERHEAD CEILING NOTE: THE MAJORITY OF RESTORATION WORK ON SITE CONSISTED OF CONCRETE AND STEEL REINFORCEMENT. (REPLACING DETERIORATED REBAR WITH EQUIVALENT REBAR SIZES, SHAPES, ETC... ALL REINFORCEMENT REPAIRED WAS REPLACED WITH A REBAR OF SAME SIZE OR AS MODIFIED BY ENGINEER OF RECORD. ANY NEW BARS INSTALLED WERE ChromX 9100 Grade 100 (MMFX), NOTE: CONCRETE RESTORATION WAS DONE IN SUBSTANTIAL ACCORDANCE WITH THE PREVIOUSLY SUBMITTED PRE -BUILDING PERMIT DOCUMENT AND ICRI GUIDELINES (AS REPRESENTED IN DETAILS 1, 2, & 3) ORIGINALLY SUBMITTED BY MATHERS ENGINEERING CORPORATION AND DATED APRIL 30, 2020.. WORK OUTSIDE OF THE SUBMITTED DOCUMENTS WAS COMPLETED USING STANDARD ENGINEERING PRACTICES TO ACCOMMODATE FIELD CONDITIONS. OTE: FINAL SIZE OF REPAIRS FOR BALCONY DIMENSIONS VARIED AN[ WERE DETERMINED AFTER INITIAL DEMOLITION HAD TAKEN PLAC ST. LUCIE COUNTY BUILDING DEPARfiMENT PERMIT # SLC 2003-0509 W _ W r w ri 0 zQ O as Wa 00 0 U OU U Z_ U W K Z W � W Z 5 W, Z N W W w W Q Fm Q� EO �z 00 yN N FW p oa az G w3 W m �^ z� ¢ W Y X m W W � O wo a� zo �W Q U m> O0 O IW >0 mo �o �W 0w zW zm 'z zz JJ �J ZQ z' ¢ YZ Y ¢ Q 7N ZU J'0 d' �a yU 7 L� o riw ZN ii t0 O �> 'w 'w Jz ¢0 z IO w N'� 1wDw JU r� mQ o> 0 �a >a �Q �2 zw W UO SOZ WQo SZW O J F oQ owe <Q amz � E W ao� k' ' O zQo asp w <F Zow z�� waz mQER 0" 30J � o> Qpo =<W Q w U 0 o m F Q F w O U w z 'wo �Q V zV WJ m Qz>a U Q - Z W DATE REVISIONS 10.19.20 CLOSE-OUT o� `O m 0 V �� 02 G] Q z cf� O a V� u H �pt w WLn V W xW JWy�� H Qw W J U) to vWi ti Z ay QO U c�v m H (D H E�i O w W 0 U) E- W Q T n r® I —I 0 TW F—i co O O DRAWN B.S.D. CHECKED W.J.M. DATE MARCH 3, 2020 SCALE NOT TO SCALE l JOB NO. 3599-01 SHEET 1