HomeMy WebLinkAboutinspection docUniversal
Engineering
Sciences
Company
'�FRNATIONP
Inspection Date: 3 iS " 7-1
Project: �/leeE'se
INSPECTION RESULTS
Address: 7/Z-1 N Ty (Ii 2
8�
Check one:
K Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
Permit No._�Lo 11 — G r 6 o
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
I Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection I
Re -inspection
Re -inspection
Re -inspection
Final Building I
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: 116 SLfl iS
Inspection Results: 1A AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: :�kl' - 579�Z L c q -r;" _ -s /'' - 7P, S ; ��
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: f�Sk� ��z �u Lic.#: Al.) 4& 8 �
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com