Loading...
HomeMy WebLinkAboutCreekside Lot 39-Zipwall.pdfG� Universal Engineering Sciences P� Company 'FRNATION Inspection Date: Project: Ue-c�-o/e S de. INSPECTION RESULTS Address: 13 3 8 7/L A,, Ty Cdirt Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): Permit No. d o i/ — o i G 6 BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Stoi m Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 3 9 Z", wAL Inspection Results: IXAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 0&4'• Z+P u 444Sy57e4- (SA3(a- E,,eZ4 1. 2. 3. 4. 5. 6. 7. Inspector's Name: &&-t— �a w� Lic.#: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com