Loading...
HomeMy WebLinkAboutTemp Request for 30 Day Power 03-18-'21 09:22 FROM- 7728787656 T-904 P0006/0008 F-452 PIa'nin a 16poient Services 2300:'0"rg inia Avg: x e .C. r•? . Fart'Plepce,, FL I 72-.�Efi24-i Fax 7'�' 46 =G443 R,egUd� t4br 3 -D.aV Teilx po4 y'PoWer:Rel°eme Date: �� \ Permit Number: Project Adder: CD< � :n THE UNDEPMGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER'TO THE ABOVE DESCRIBED PROPERTY,FOR A PERIOD NOT TO EXCEED TiIRTY,(30)•DAYS,FOR THt PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FORA FINALET5PEGTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HAY ACi WAGE ANb AGE*P�s FOLLO'i& 1. This temporary power release is requested for the above soterl purpose ol3ly,and fiheie Will be no occupancy of any type,tither than that.perm tied by poitsb ction during this time period. 2. As•witness by our signMits,we hereby a9tee t0 abide W all terms acid-conditions of this agreement, indudi t Building Division:Pbll which is incorporatedh' e � g cY, erern r Terence. by 3. Al conditions'and requirements hsted.in the attached dvc�urrent entit3 d"Requlrernerits for 30 Day Power ffor Testing"have been ful0tlM'and the premise is ready for co npliance inspection. 4. All requests or an extensian beyond 30 days must be'rnade in writing to#fre Building Of dal stating the reason for the request. Power may be removed'from the site and/or a Stop Work Order issued if the Rnal'Inspecbon has not been approved within 30'days. -A fee of0100.00 will be required to lilt the Stop Work Order. WE HEREBY RELEASE AND AGREE.TQ HOLD.HARMLESS,ST. LUCIE COUNTY,AND THEIR EMPLOYEES FROM ALL I IAB�K MS AND.aKMS OF ANY TYRE OF NATME WHICH MAY ARISE NOW OR IN THE RElTURE OUT OF THIS TRANSACTION;INCLUDING ANY`DAMAG8 WHIC l MAY BE INCUi2RED Of1iw TO THE DISC6NNEMON OF EL1=MCAL PbWER IN Ti:E' NT OF VMLATION Of THIS AGPEEME OWNER SIG.' DATE ' { 'CO , } DATE_ ELEC} M CONTRACTOR SIGNX11JRE DATE R E Cr4 E IC E® MAR 19 2021 Permitting Department St. Lucie County, FL