HomeMy WebLinkAboutInspection Docs 03-18-'21 09:22 FROM- 7728787656 T-904 P0005/0008 F-452
Pleil7l i rg, 'I ei +el �aknent Services
BuildirgI tar1 °` tiieg�il tton l ivrsib�n
•..
772-462-21 Fax-772 462-6443
Recluesi:16t 3- -# ay T-e-th oraryr'Poviiar-Release
— Permit Wi tuber
PMect Addm=
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO 7HE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO.DCCEED THIRTY(30)-DAYS,FOR THE PURPOSE QFTESTING SYSFEMS
AND EQUIPMEM'IN PREPAi:tA17ON FOR A.F WAL.INSPI_i' MN. IN CONS-40ERATION OF APPROVAL,OF THE
REQUE57 WE HIERMY ACKNOMEDGE AND AGREE'AS FOLLOWS-.
1. 79s temporary power r?4ease is requaged for itte above staffed purpose only,and there vaffl be no
occupency of arY WM other than that permitted by cofauction during th'isEme period.
2. As witness by our signM- Les,we hereby agree to abide by all terms acid-conditions of this agreement,
Including Ending Division.Pblicy,which is incorporated herein by refeience.
3. All condrdbns;and requirements listed in.the attached document entitl8d oRegdrements for 30 Day
Power for Testing"have,been fulfilfW'arid the premise is ready for compfiance inspection.
4. All requests fbr an extension beyond 30 days must ie madd in,writing to the Building Offidal sta'dng
the reasori fbr the request Power maybe removed from the site and or a Stop Work 0rder issued If
tale Flnai'Irgxztion has not been-approved within 30 days. A fee of$I00.00 wilf be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGMETO HOLD.HARMLESS,5T.LUCIE COUNTY,AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND.CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION;INCLUDING ANY DAMAGE-W.r4ICH•MAY BE INCUiRED DUE TO THE
3I5{CE3N�d�ON OF POWER IN THE. NT OF VIOLA110N OF THIS AGREEMENT.
ram,.
OWNER SGNATURE - DATE'
GE CONTRACTOR:' 1 DATE
FFCMCAL CONTRACTOR SIGNATURE DATE
MAR 19 202i
fitting Department
perm county► FL
Ste Lucie