HomeMy WebLinkAboutRequest for 30 Day for Power 03-18-'21 09:21 FROM- 7728787668 T-904 P0002/0008 F-452
planni fig.A
'si�.In
•e
tdAtiOn vL1
in ��od
• Lp�.1o'L1 'gtLt7L1a A�/Q
F.0r.t pif mA..FL:349
7
Requestfcer 30-Day'Tem.p0pl i v PGWO,.Release
Dale: \� Perr*Ni nber.
Projed Address; �S ��a\
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER Pro THE.ABovE DEsaugED
PROPERTY,FOR A PERIOD NOT TO EXCEED THIRTY(30)-DAYS, FOR"I`HZ PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FORA FINAL_INSPEMON. IN CONSJDERATION OF APPROVAL OF THE
REoUFSr WE-HMEBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
I. ibis temporary power r0ease is requested for#te al�ye:stated purpm only,and a WRI be no
oodupancy of any type,other than-that perm tied.by consU uct ion during this time period.
2. As witness by our sig es,We herdby agree lb abide iiy all t rrns and conditions of this agreement,
Including filding Division Piollw,which is incorporated herein by reference,
3. All conditions:and requirements listed.in the attached doament enMed"Requirements for 30 Day
Power for Testing"nave been fulfilled-and the premise is reedy for coPnpliance inspection.
4. All requests for an extension beyond 30 days must be'made in writing to the Building Official stating
the reason`fbr the request. Power maybe removed•'from.the site and/dr a Stop Work order Issued if
the Final*InspBLton has not been approved Wrrthin 30 days. A fee of 4100.00 will be regtured W lift
the Stop Work Qrder.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS,ST..LUCIE COUNTY,AND THEIR EMPLOYEES FROM
ALL LIABMES AND:CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION INCLUDING ANY DAMAGE NCH'MAY 13E INCUPED[SUE TO THE
DISC'OMEMON OF:ELEcMiCAL POWER IN THE-EVENT OF VIOLA-13011 OF THIS AGREEMENT.
OWNER SIGNATURE DATE'
t 'CONTRAt."rOlt DATE ^�
�L.ECTPICAL CONTRA=R SIGNATURE DATE
RECEIVED
MAR 19 2021
Permitting Department
St. Lucie County, FL