Loading...
HomeMy WebLinkAboutTRUSS51' 0" 23' 1 " 14' 8" N 71011 121011 11 6" 21011 O _ 21011 161011 0 M co rl- co L O O O O co N N CD C) CDO M� O_ CO M O O M O� 00 O C)00 CD C)O U U U U U U a a a s a a a s a a a CJ1 a CJ3 a CJ5 a EJ7 a EJ7 a EJ7 a EJ7 EJ7 a EJ7 a EJ7 EJ7 a EJ7 EJ7 a EJ7 a EJ7 a EJ7 a EJ7 a J N J co U lu 21 9 1 /2' 0 J ED o CU F, ' N T + OW W U- o u_ 9 oV F CUP J b LLI '-0" BRG WALL o > EJ7 D01 ———�--7- N AHU ATTIC STORAGE D02 a / \ // \�/ D03 \ \'� \ /\ V J D04 a V0 / m 00 D` / 06 V.05 N. D07 VO4 D08 / \ x x 8'-0" CLNG D10 CA > o O < CA XV v V V V V V V �'� 0 -3� U u1 w u1 u1 u1 w u1 w U 201011 111811 511011 11'-0" CLNG CA �-< E02 E02 E03 ❑ 0 N N N �,� U W W W U 91411 lu J U 0 00 131311 71011 Ln M U U U n n n 121211 J M (D CD z > (D J U� 0 > 00 1 6' 9 1 /2" 17 17 '7 17 10' 0" [>—CA > CJ3 Coo > CJ5 EJ7 EJ7 EJ7 > EJ7 �>EJ7 EJ7 EJ7 > EJ7 > EJ7 > EJ7 p LO > IEJ7 > EJ7 00 > EJ71 EJ71 EJ71 > EJ71 1> EJ71 I > EJ71 > EJ71 EJ71 EJ71 EJ7 J6 CJ5 CJ3 ti > CA Hatch Legend 0 11 ' -0" A.F. F hristo her Digitally signed by Christopher D Beers p DN: c=US, o=Unaffiliated, ou=A01410D00000172B9270F630000 Beers 62DA, cn=Christopher D Beers Date: 2021.03.18 07:34:00-04'00' N N U U CJ2 CJ2 a 80 LO U U 4' 0" CJ2 C) CJ2 TRUSS END DETAIL 19 HANGER LEGEND * - ALL 2x HANGERS SHOWN ARE HTU26 UNLESS NOTED OTHERWISE * - ALL 4x2 FLOOR HANGERS SHOWN ARE HHUS46 UNLESS NOTED OTHERWISE MAIN WIND FORCE RESISTING SYSTEM/C-C HYBRID IMPORTANT WIND ASCE7-10 ENCLOSED This Drawing Must Be Approved And EXPOSURE CATEGORY C Returned Before Fabrication Will OCCUPANCY CATEGORY II Begin. For Your Protection Check All WIND LOAD 170 MPH Dimensions And Conditions Prior To *TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF Approval Of Plan. BOTTOM CHORD LIVE LOAD NONCONCURRENT WITH ANY OTHER LIVE LOADS SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE ROOF LOADING FLOOR LOADING BEEN ACCEPTED. TCLL: 20 PSF TCLL: PSF TCDL: 15 PSF TCDL: PSF BCDL: 10 PSF BCDL: PSF By Date TOTAL: 37 PSF TOTAL: PSF DURATION: 1.25 DURATION: CAUTION!!! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCI-131 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (ie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE. 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders FirstSource. NO EXCEPTIONS. The General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. BUILDER: G ROZA B L D RS RES: SANTANA/AUTRY MODEL: CRESTVIEW ADDRESS: BROCKSMITH LOT/BLOCK: -- CITY: FORT PIERCE COUNTY ST LUCIE CO DRAWN BY: JL JOB # : 2373691 DATE: 06/29/20 SCALE: NTS REVISIONS: 1. REVISION 7/6/20 2. 3. 4. kilders FirstSource 701 S. KINGS HIGHWAY FORT PIECE, FL 34945 Ph. (772) - 461 5475