HomeMy WebLinkAboutBlower Door TestMWGIGPcs,, Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: Permit #: '�?00
-.g".2`:.= '.rT :'•' - `''=.^.' _� .=:1 - <:y::: _gi.-$v.Y f" _ - 's='<:.;p.- _ •q_._..
..;...
if :. v �..: _ 1?J{..i �. '�_;A _. - "Jc "•^3'aYr Y��..- Yi�L��r t� ..'r Y'.�d' µ �:.
Builder: 7 ULot: ) o 4
Address: 2 Z C1 I rG
✓
IClt)`. T74- A � Gc State: FL Zip:
j5�8 xso- 2Z-11o3 �/.Z
CFM(50)�j� Building Volume ACH(50)
(x i PASS -
When ACH(50) is less than 3, Mechanical Ventilation installation
must be verified by building department.
Method for calculating building volume:
O Retrieved from architectural plans
* Code software calculated
O Field measured and calculated
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSURESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues. or individuals licensed as set forth in Section
489.105(3)(f), (9), or () or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infliMmirol
measures:
3. Interior doors, if installed at the time of the test, shall be open. JAN TO 2021
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off. P�-Itting Departme
6. Supply and return registers, if installed at the time of the test, shall be fully open. tole County
�•-,•:::.,_ate,._.,. __ ._ : - - - - - -- -
'"r�- =_���" mot•:;; . :'�": � - - - -
.w
es'
......... .
Company game: (,- rA 7,- r-4 A on 4 ) Phone: %72. _ 9 N — 35Z
I hereby verify that the above Air k e results are in accordance with the 2017 6th Edition Florida Building Code
Energy Conservation require
me a ording to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Flame of Tester. Ircyo✓ �-5� PO✓ e
License/Certification #: JVtD `f ! Issuing Authority:
G
6/28/2019 7:45:57 AM EnergyGauge® USA 6.0.02 - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
RECEIVED
Duct Leakage Test Report JAN* 2 8 2021
11 n- a m
1 M
Residential Prescriptive, Performance or ERI Method Complianbif. Lucg ieDCoP it
untyent
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: Permit #:
W `V
-Q
11- KA,
Builder:rd Lot: NA Address: C7 9 ZZ6 PO - C'4 cc,
City: 0 1-4- State: FL, Zip:
0.6 Q.
System 1
6-7 cfm25
System 2
cfm25
System 3.
cfm25
Sum of any
cfm25
Total of all
cfm25
47..
Z6o-S = 0 - ()25Qn
Total of all
Total Conditioned
systems
Square Footage
PASS FAI L ... ...
o-7 0
�'a OqdOO/
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section
553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(% (g) or (i), Florida Statutes.
-4,4; As
Company Name: r rn 4 &,.a e, Phone: -7-72 97 1/
I hereby verify that the above duct le age to g results are in accordance with the Florida Building Code requirements with the
selected compliance path as state bovXldler the Prescriptive Method or Performance Method.
Si . gnature of Tester. Date of Test: ZZ Z-o 7-
Printed Name of Tester: Ve vo✓. �� Por7-C'
License/Certification #: J C) Issuing Authority: P. a —Z
6/28/2019 7:46:04 AM ' EnergyGaugeG) USA 6.0.02 - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1