Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Engineer Report
20033-2-Ocean Twrs f 16 17 18 19 20 21 22 Breitenbach Engineering, Inc 4853 SE Pilot Way, Stuart, FL 34997 Tel: 772-8344743 Permit Number: SLC-2007-0746 Attention: Doug Pendelton 772-485-5517 Job Number: 20033-2 e-mail: oceantowersoffi�com Condo Assoc: Ocean Towers, Condo B contact: Chris Arias 9400 S. Ocean contractor: Daniello 8 Associates Jensen Beach, FL 34957 Address: 2708 N Australian, #9, WPB, FL 33407 By: John D. Breitenbach, PE Tel: 772 834 4743 Gate Code: 19490 PE #59770 Si #2072 iohnbach442 aamall.com Billing Method: Date Hours Description r)av Tiree cnmmnnfc 1 8/14/20 Administrative Letter of Intent, review specifications, forms n.a. ! 9/29120 1st inspection Tues 9:30 Units 301,302,303,401,402, & 501- demo progress 1 10/12/20 (rained out) Mon 11:00 n.a. 1 10/13/20 Stack 1 10:00 1001 stucco OK; 901 OK,: 801 remove floor cover progress same 701 OK; 601 nothing; 501 1/4 column; progress same 401 minor, 101 112 column progress i 10/14/20 Stack 2 Wed 9:30 1002 NE corner stucco; 902 2'x4' ready; 702 #3-U; 602 SE corner OK; remove floor coating; 502 NE & SE slab comers, add #3-U; 402 more excavation 202 need more excavation 10/16/20 Stacks 1 & 2 Fri 9:30 Stack 1-90% passed; stack 2-60% passed progress 10/19/20 Stacks 1 & 2 memo, top floor facia crack noticed progress end October Administrative, reports & mailing n.a. 11/2120 (too windy) Mon 11:00 entry canopy demo,(11/6/20 passed) passed 11/6/20 all floors progress 11113/20 (stop by) progress 11/16120 Stacks 2 & 3 (304, 204), (306,206), (309.209) passed all other floors progress 11/20/20 Stacks 4 & 5 1005, 1004, 1007, 607, 507.701 progress e-mail 805.704 passed end November Administrative, reports & mailing n.a. 1211/20 Stacks 2-3,4-5,6.7 Tues 9:30 all floors, 80-90% ready progress 1219120 Stacks 6-7, #205 Wed 9:30 98% ready passed 12/18/20 Fri 9 330 demo unit 205, 112 poured progress 114121 Stack 8 Mon 1:00 (stop -by) progress 1/6/21 Stack 8 all floors, demo, & mark-up progress 1/13121 Stack 8 1 lall floors, progress, and pre -pour some, hdr @308 approved 3/17/21 Roof Wed 11:00 Stucco repair at sill, west aid rryrrr passed Units 109, 209 misc repai , Q passed end Dec, Jan -March ��` % 3�; q: ..._,-__.. _..-. .-..r Y_..v....o.. my ..la apv.n a130y .v, , 1 ,nc,.C,,,uunu puns an0 SpeCt" [10 a accommgTO e I Repair Institute (ICRI). The FBC and ACI.318 do not address concrete restoration. Ciry al>s) 'nry fgefq 6 nal Concrete law. V Total His:See Letter of Intent and the Engineer's Plans 8'$q�t10�(�Ir� etl'ditional information. 20033-2-Ocean Twrs ++••nnnus