HomeMy WebLinkAbout30 day power release'� � � �
h= n+ 4?LS tI _ 4
�1
,.
Dale:
G��p liiilHl0rR {_J1 ? I?eIf9. If(0ifHV11 ^,riIfHMh
uoldlio D Conle RvAirju� A."Bon +� uMN(ahi
� )RA N rce, riL 3/1 32
3/9/2021 2008-0657
Pe11111l INJumber:
5186 Arming Place
Projeck Ad .dress:
THE UNDFRSIG(VED HEftEEY ttEQIJEST RELEASE qF ELECTRICAL .POWER TQ THE ABOVE DESCRIBED
PROPERTY, FOR. A PERIOD- NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
\NDJ EQUIPMENT :IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF TH
ZEQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS. FOLLOWS;
is This temporary power release is regoesEed for the above stated purpose only, and fihere will. be >no
occupancy of any type, other than that permitted b1.y construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building .Division Policy, which is incorporated herein by reference.
3: All conditions and requirements fisted In the attached document entitled *Requirements for 30 Day
Power for Testing" have been and -the prenriise'is ready for compliances Inspection.
�F. All requests for an extension beyond 30 days must be made in writinglo the Building Official stating
the reason for the request. Power may be removedr from the site and/or a Stop Work Order' Issued if
the Final. Inspection hasmot been approved wlthin 30 days, A fee of $100.0-0 will be required.to lift
the.stop Work Order.
WE HEREBY RELEASE_ AND AGREE TO HOLD HARMLESS, SST: L.UCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS aF ANY TYPE OF NATURE WHICH. MAY ARISE. N01N OR �N TNE:FUTURE OUT
OF THIS TRANSACTION, INCLUDING. ANY,DAMAGE WHICH MAY BE INCURRED DUE TQ-THE.
DISCONNECTION OF ELECTRICAL. POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT:
OWNER'�I
GENE
SIGNA'
ELECT(�ICAL CONTRACTOR SIGNATURE
zn T301k�X�1]agei�ll 3/9/2021
Josepi� 5p�lt 2021
,TE
3/9/2021
DATE