HomeMy WebLinkAboutProduct Approval V 8�`0e21,/-�IhnCOJ l File Co
orida Building erode Online - . https://www-floddabuilding.org/pr/pr app dtl.aspx?param lG,EVX...
AVOW—
v ++�i En• n h .:ter 2.. .,•.t:_.._.i. - ._3 i- r..-...:,:...r-_�9..�,k,.., r.-- -.Pca�%.
?--•<y=-F,ywr^•n BGIS Home tog In User Registration -Hot Topics Submit Surcharge Stats Pa Fads Publications FBC Staff SCts S¢e Map Woks search
Susines ��:��i
Professional + .4 usreR ruble pproval CONCEALED FASTENERS OR ATTACH�iENia
{"'--< �±:;1:tof ARE THE RES RONS I BI L[TY OF THE
,�„ i. product Mnrav:J Meng>�mdix�l DPP_ t?or YArch.>Ap bcpLgn k!F.k a Appamtiwt Dotal
t 'G FL FL16048-113
Application Type Revision
Code Version 2014
Application Status Approved i HcSE PLANS AND ALL PROPOSED WORK
ARE SUBJECT TO ANY CORRECTIONS
Comments REQUIRED DY FIELD INSPECTORS THAT
Archived
.MAXK NECESSARY:IN DRD9�,TO r.,
Product Manufacturer TRI-BUILT Roofing Products ^ MP y`rmrM o N gyp ( P
g �.Oti1PL�"Villl7 r'tbe�j=���Ib�1�h[s�,°�.�1JES.
_ Address/Phone/Email 9050 Louisiana Street
Merrillville,IN 46410
(201)842-2449
david.ruiz@ttibuiltma teriaisg rou p•com
Authorized Signature David Ruiz
david.ruiz@tribuiltmatdrialsgroup.com
Technical Representative David Ruiz
Address/Phone/Emall 250 Route 17 North
East.Rutherford,NJ 07073
(201)842-2449 cT T� V _UINITy all3km' it IarIISIGNT
david.ruiz@tribuiltmaterialsgrad�.c -
RFVTEVV tI FOP U-) P''LUNC-E:
Quality Assurance Representative %�
Address/Phone/Email D.TE 5
471 -4
PL N'S ri D PEI�'�111T 14 ST BE IaPT ON JOB
On-NO TENSPEOT-O�i ti'ML BE iINLA&DE.
Category Roofing -
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
~p i Florida Professional Engineer
Evaluation Report'-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report.
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By John W.Knezevich,PE
Validation Checklist-Hardcopy Received
Certificate of Independence ELi804q tn3 CQI 2015'01 COI-Mleminzn:pdf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2009
ASTM G15S 2005
FRSA/TRI April 2012(04-12) 2012
TAS 103 1995
1 of 2 5/24/2016 9:58 AM
.odds Building Code Online https://www.floddabuilding.org/pr/pr app dtl.aspx7param=wGEVX...
Equivalence of Product Standards
Certified By
Sections from-the Code
Product Approval Method Method 1 Option D
Date.Submitted. 10/08/201S
Date Validated 10/10/2015
Date Pending FBC Approval 10/21/2015
Date..Approved 12/1S/2015
Sumrnaryof Products
r FL# Model,Number or Name Description
L
16048.1 ;TRI-BUILT Roof Underlayments �1 Self-adhering,modified bitumen roof underlayments
Limits of Use
—!"Installation Instructions T
Approved for use In HVHZ:No FL16048 R3 It1 2015 10 PINAL ER MI-
__
Approved for use outside HVHZ:Yes BUILT UNDERLAYMENTS_FL160$�-R3.,o_d
Impact R(isistant:N/A, i Verified By:Robert Nieminen PE-59166
Design Pressurei+N/A/-45 j Created.by Independent Third Party:Yes
Other:1.)The design pressure noted herein pertains to use i Evaluation Reports
of foam-on tile systems overtop the self-adhering FL16048_83 AE 2915 10 FINAL qlk TRi= t
underlayntent for one particular application,See ER Section BUILT`UNDERLAYMENTS—FFL-1f04S8-R31pdf
5.6 for details.2.)RePerto ER Section 5'for other Limits of Created by Indeperdent Third,Farty:.Yes
Use.
_ 9ack IVetct4
�ontacLUS::S9E0 North ltonm(`Stree[.Thlaha55ee FL 32199 JiQ;850487-_02A
- The State ofFbrlda is,an M/EEO employer.CoA*A[LZ0SLL•,201;a,StBtC,:Pf,F.Iaikk::PIJYiLCY-star menu:;QtsCyS pry-5tateme�::.Redone.stptClDetlt
Under.Fbrlda law;emal addresses are public records.tf you do'not want your a-mall address released in.-response to a pubk-records request,do not send electronic
mail to ttds entity.Instead,contact the'of ice by phone or by traditional mall,If you have any questions,please contact 850.487.1395.'Pursuant to section
455.275(1),FiorBa Statutes,effective October 1,2612,licensees licensed under Chapter 455,.F.S.must provkie the Department with an emall address It they have
T one.The emats provided maybe used for offklaicrimmunlcbtbn wth.the tr.ensee.However eniat addresses are public record.it you do not wish to.supply a
Personal address,please provide the Departmentwith an emat address whkh can be made available to the Pubk.To determine Ir you are'atcedsee under.chapter'
455,F.S.,please click.hem.
Product Approval Accepts:
't
2 of 2 5/24/201.6 9:58 AM
EXTERIOR RESEARCH&:DESIGN,LLC.
Certificate of Authorization N9503
353 CHRISTIAN STREET,UNIT#13'
TRINITY OXFORD,CT 06478
PHONE: (203)262-9245
FAX:(203)262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluation Report A42960.10.12-113
dba TRI-BUILT Roofing Products FL16048-113
9050 Louisiana Street Date of Issuance:10/25/2012
Merrillville,IN 46410 Revision 3: 10/08/2015
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction-materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code.and Florida Building.Code, Residential Volume. The
products described herein have been evaluated for compliance with the 5th Edition (2014) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named prod uct(s).changes,the referenced
Quality Assurance documentation changes,orprovisions of the Code that relate to the product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen,_P.E. if the product
7. changes or the referenced Quality Assurance documentation changes. Trinityl ERD requires a.complete review of this
Evaluation Report relative to updated Code requirements with each Cade Cycle.
ADVERTISEMENT:The Evaluation Report number preceded by the words "TrinityIERD'Evaluated" may be displayed in
advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request;a copy of this entire Evaluation Report shall be provided to the user-by the manufacturer or
its distributors and shall be available for inspection at the job site at the request of the Building.Official.
This Evaluation Report consists of pages 1 through 5.
Prepared by: ,ittthtt„r
c aosa� :• ':.�?
Robert).M.Nieminen P.E. was authorized by Robert Nieminen.
:J1u„�i Most pl.cnJ0108/2015.Th(s does not serve asancleftrOniptFysia{ned
Florida Registration No.591:66,Florida DCA ANE1983 document..Signed,stated hardwptes have been transmittedtothe
ProduitAPPra-al AdmMstratorand to the named dent
CERTIFICATION OF INDEPENDENCE:
1. TrinitylERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity l ERD is not owned,operated or controlled-by any company manufacturing or distributing prod,ucts.it,evaluates.
3. Robert Nieminen,P:£.does not have nor will acquire;a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen,P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen,P.E. are,:in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
_ I
I. l
a
t
TRINITY MERD
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments,as produced by TRI-BUILT,have demonstrated compliance,
With the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to the Installation Requirements and Limitations/Conditions oWse.set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4,1507.2.8,1507.2:9.2, Physical Properties ASTM D1970 2009
1507.4.5.1,1507.5.3,1507J.3
1504.6 Accelerated Weathering ASTM G155 2005
1507.3.3 Installation Practice FRSA/TRI April 2012(04-12) 2012
1523.6,5.2.1 Physical Properties TAS 103 1995
3: -REFERENCES:
.Entity Examination Reference Date
ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013,
ERD(TST6049) Physical Properties S40540.11.13 11/19/2013
ERD(TST6049) Physical Properties S40540.03:14 03/26/2014
ERD(TST6049) Physical Properties S44870.04.14-2 04/02/2014
ERD(TST6049) Physical Properties S44870.04,14-3 04/02/2614
ERD(TST6049) Physical Properties S44870.04.14-1 04/10/2014
-. ERD(TST6049). Physical Properties S44870.04.14-4 04/10/2014
ERD,(TST6049) Physical Properties S43530.02.14-1-111 05/14/2014
ERD(TST6049) Physical Properties S43530.05A4 05/28/2014
ERD(TST6049) Physical Properties S40540.1o:14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(QUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL,I.I.C.(QUA9625) Quality Control Service Confirmation Exp..10/16/2017
4. PRODUCT DESCRIPTION:
4.1 Self-Adhering Underlayments.,.
4.1.1 Tri,-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced,.sand-surfaced, SIBS
modified bitumen roof underlayment,with a 36-inch sheet wldth.
r 4.1.2 Tri-.Built S/A HT T.0 Underlayment,is a self-adhering, non-woven pofyester fabric surfaced, SBS modified
bitumen roof underlayrent
4.1.3 Tri=Built Smooti .HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified
bitumen roof underlayment.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither TrinityjERD nor Robert Nieminen, P.E. are, in any way,the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that.purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification .is not part of this Evaluation Report, refer to current Approved Roofing Materials
Directory for fire ratings of this product.
1
Exterior Research and Design,LLC Evaluation Report AQ 60.16.12-R3
eerafkate of AothorltoNon OM03 f1.16048-113 S
Revision 3:10/08/201S
Paget of 5
T ERD
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is specifically
referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering.
5.5 Allowable roof covers applied atop the underlayrnents are as follows:
TABLE 1: ROOF COVER OPnoNs
1 Asphalt Wood Shakes
Underlayment Shingles Nall-On Tile Foam-On Tile .Metal,, &Shingles Slate
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built 5/A HT TU Yes Yes Yes Yes Yes Yes
Underlayment See 5.5.1
Tri-Built Srnooth.HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam-On Tile" is limited to use of the following Approved the adhesives unless tensile adhesion/long.
term aging data from an accredited testing laboratory is provided:
`r Tri-Built S/A HT TU Underlayment with 3M"'2-Component Roof Tile Adhesive AH-160(FL6332)or Dow
TIIeBonP'Roof Tile Adhesive(FL717)
5,6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand-R SA Shingle'Underlayment, Tri-Built S/A HT TU-Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
S- Plywood; ASTM D41 primed plywood, OSB;,ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not.required over plywood,OSB or Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final,roof cover"is not slated for installation within.24 hours. Note: TRI-BUILT requires.
tongue-and-groove board decking be covered with plywood or OSS prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
Tri-Built S/A HT TU Underlayment applied to:
Y Dens Deck Prime;SECUROCK Gypsum4iber Roof Board,
For installation:under mechanically attached prepared roof coverings, insulation shall be-attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For-.installations
under foam-on tile systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM-4474,•Appendix D
or TAS.114,Appendix J,,
5.6.3 Bond-to Mechanically Attached Base-Layer:
ASTM D126,Type I or II felt:
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on the systems,base layer shall be attached
per minimum requirements of.FRSA/TRI April 2012(04-12),
Exterior Research and Design,LLC Evaluation Report A4296D.10.12•A3
Certljkute of Author1zotfoa H9303 FL
Revision 3:10/08/2/08/202535
Page 3 of S
a
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TR1 April 2012 (04-12).
does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems,where
the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck
onderiayrnent systems that are.not addressed in FRSA/TRI April 2012(04-12)and are used in foam-on the
applications. -Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads,and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety
per FBC 1504.9.has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 Psf.
Deck: Min.15/32-inch plywood to meet project requirements to satisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment:. Tri-Built S/A HT TU Underlayment,self-adhered.
5.7 Exposure Limitations:
5.7.1 Tri-Built Sand-9 SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below..
6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri Built Sand-R-SA Shingle Underlayment Tri-Built 51A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-Tile applications:
While priming Is optional,TRI-BUILT recommends priming the deck if the-final roof cover is not slated for
installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately,10 ft of membrane,and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches,,configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the.
overlap area at thetop of the sheet-at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.'Peel the release paper and center sheet
over valley or ridge.'Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications(Tri-Built 5/A HT TU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall.be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment.
i
Exterior Research and Design,LLG Evaluation Report A42960.10.12-R3 !
Ceallicate of Authorization 94503 FU6048-R3 }
Revision 3:10/08/2015
Page 4 of 5
TRIN11YERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of.
this product.
8. MANUFACTURING PLANTS:
Contact the noted CIA agency for information on product locations covered for F.A.C.Rule 9N-3 QA7equiremenU.
9. QUALITY ASSURANCE ENTITY:-
UL;LLC—QUA9625;(314)578-3406;k.chancellor@us.ul.com
END OF EVALUATION REPORT-
r
Exterior Research and Design,LLG Evaluation Report A42960:10.12-R3 1
CeAl irate of Authartiddan#9503 F1.16648-R3
Revision 3:10/08/2015 )
Page 5 at$