Loading...
HomeMy WebLinkAboutCreekside Lot 38-Temp Toilet®UNIVERSAL` ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 3 - 2 z - z- 1 Project: dP-z- tes'de Address: 3 3 4-7- Ti2 u , jy 0_1"c- 3 Check one: Vf Regular Inspection: Permit No. oho I t — ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING X MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground I Storm Piping & Test I I Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: L712 °� /� �� To r L a7 Inspection Results: 1AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: fib, ��o/� Lic.#: f5 /-) 2( a ff e OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com