Loading...
HomeMy WebLinkAbout30 day power release3/9/2021 date: i�nn. li i 3,00 VirginiaAve 5182 Arming Place Projeck Address: ��ri�t N um��r: 2oo7-oso7 THE UNDERSIGiVED HEREBY REQUEST RELEASE OF ELECTRICAL POWER T'0 THE A60VE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL. OF THE REQUEST WE HEREBY ACKNOWLEDGE_ AND AGREE AS FOLLOWS; 1. This temporary power release is requested `for the above stated purpdse only, and there will. be no occupancy of any type, other than that permitted Dy construction during this time period. 2. As witness by our signatures, we herby agree to abide by all terms and conditions of this agreement, Including Building Division Policy, which is incorporated herein by reference. 3: All conditions and requirements listed in the attached document entitled ``Requirements for 30 Day Power for Testing" have been fulfilled and the premise 1s ready for compliance inspection. �}. All requests for an extension beyond 30 days must be made in writing to the Building Official stating_ the reason for the request. Power may. be removedw from the site and/or a Stop Work Order issued if the Final. Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the.stop Work Order, WE HEREBY- RELEASE AND AGREE TO HOLD. HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH. MAY ARISE, N0,1N OR IN THE .FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL+EOWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT, 9 DWNEFt GENE TOR SIGNATURE CONTRACTOR .SIGNATURE 17. BoTl�exiha1eXa 3/9/2021 DATE 'oseph 5palt 3/9/2021 DATE 3/9/2021 DATE