Loading...
HomeMy WebLinkAboutTotal Dynamic Head (TDH) Calculation-"i i PROJECT NAME: REED SUDDERTH POOL t PROJECT ADDRESS: 4240 MC CARTY RD. FORT PIERCE, FL TOTAL DYNAMIC HEAD (TDH) CALCULATION DETERMINE MAXIMUM FLOW RATE PER ANSI / ASPS -15 2013 MINIMUM FLOW RATE REQUIRED: 35 gpm / SKIMMER 1 SKIMMER PER 800 ft2 OF SURFACE AREA I SURFACE AREA = 332 ft2 MEAN DEPTH = 4.674 ft POOL VOLUME = 332 ft2 X 4.674 ft X 7.481 gal/ft3 = 11608.7764 gal TURNOVERTIME = 6 hr X 60 min./hr = 3601 min. MAXIMUM FLOW RATE = POOL VOLUME/TURNOVER = 32.21 gpm SPA FLOW RATE = N/A gpm MAX PIPE SIZES AT MAXIMUM SYSTEM FLOW RATE BRANCH PIPING SHALL BE N/A inch AT 6 fps MAX AT #N/A gpm TRUNK PIPING SHALL BE 2 inch AT 8 fps MAX AT 84 gpm RETURN PIPING SHALL BE 2 inch AT 10 fps MAX AT 105 gpm PUMP MAKE/TYPE INTELLIFLO VS 3.0 HP MAX • MAIN DRAIN / COVER I N/A APPROVED COVER RATE _ N/A gpm I I G" I q WTU��REIIATE CONTRACTOR: VITALI BEDERAK CERT. # PR 25255017 Sheet 1 of 3 I SEP F 1 2014 SIGNATURE / DATE PAUL WELCH INC. PAUL WELCH P.E. CERT# 29945 .I PROJECT NAME: REED SUDDERTH POOL , PROJECT ADDRESS: 4240 MC CARTY RD. FORT PIERCE, FL 1 TOTAL DYNAMIC HEAD (TDH) CALCULATION WORKSHEET DETERMINE MAXIMUM FLOW RATE PER ANSI / ASPS -15 2013 FRICTION LOSS FOR 2 inch SUCTION PIPE PER ft AT 84 ',gpm = 0.10 ft (PER TABLE) FRICTION LOSS FOR 2 inch RETURN PIPE PER ft AT 105 gpm = 0.16 ft (PER TABLE) 56 ft. SUCT. PIPE X 0.10 ftHEAD /ft = 5.6 TDH FOR SUCT. PIPE . 36 ft. RETURN PIPE X 0.16 ft HEAD/ ft = 5.76 TDH FOR RETURN PIPE ►' TABLE: SMOOTH PIPE SCH 40 PVC / FLOW AND FRICTION LOSS PFR FT PIPE DIAMETER (in) 6 ft/sec 8 ft/sec 101ft/sec 1 16 gpm 0.13 ft 22 gpm 0.23 ft 27 gpm 0.35 ft 1.5 38 gpm 0.08 ft 51 gpm 0.14 ft 63 gpm 0.21 ft 2 63 gpm 0.06 ft 84 gpm 0.10 ft 105 gpm; 0.16 ft 2.5 90 gpm 0.05 ft 119 gpm 0.08 ft 149 gpm'! 0.13 ft 3 138 gpm 0.04 ft 184 gpm 0.07 ft 1 230 gpm'1 0.10 ft 4 238 gpm 1 0.03 ft 317 gpm 1 0.051 ft 1 397 1 gpml, 0.071 ft SEP 1. 1 2014 S)KYFURfWDATE I SIGNATURE/DATE ON RACTOR: VITALI BEDERAK PAUL WELCH I'NC. CERT. # PR 25255017 PAUL.WELCH P.E. Sheet 2 of 3 CERT# 29945 PROJECT NAME: Y PROJECT ADDRESS: 100 90 80 ?� 70 � 60 = 50 Q 40 c 30 12 20 10 0 REED SUDDERTH POOL 4240 MC CARTY RD. FORT PIERCE, FL S� '� � . •-v:,�t ! 2 ".�'�n s, , �r� �`, �, �4 �^�"�i 1 s : 'v,`;+qua! ..I I �rc � iy I t a Y{ �'S n,y it lk Billi 4 FA f S� { '�t tl • 1 F a ��Ykk,,� 477. J{ 1 4 i xA^, w^•�. � �(r,, Y n h.:. 4 t fi F • Y t �e "n ` 5 1 it I y Factory Preset Speeds 3110 RPM 4 r 2350 RPM ,vr `� ' '• x 1500 RPM `. f T. �� 750 i� I i7 uRPM $ 1 0 20 40 60 80 100 1.20 140 160 Flow Rate in U.S, GPM NOTE The clam a4we demonstrates performance rates at factory preset speed% of 7S0 RPM, ISUO RPM.23SO RPM and 3110 RPM.1-iowever.flow rates an also be twswrn d programmed between the ranges of 400 RPM and 3450RPM as indicated by the blue tint. TDH IN PIPING: 11.4 ft FILTER LOSS IN TDH: 8.0 ft HEATER LOSS IN TDH 0.0 ft OTHER LOSSES IN TDH: 0.0 ft TOTAL SIMPLIFIED TDH: 19.4 ft NOTES: 1) PUMP OR HEATER MAKE / MODEL MAY NOT BE CHANGED 2) INSTALLATION SHALL COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. 3) EQUIPMENT LOCATIONS MAY NOT BE CHANGED. 4) VARIABLE SPEED PUMP USE MAXIMUM FLOW IN CALCULATION. SEP 1 1 2014 SE / E SIGNATURE / DATE 0NTJrTr(OR: VITALI BEDERAK PAUL WELCH INC. CERT. # PR 25255017 PAUL WELCH P.E. Sheet 3 of 3 CERT# 29945