Loading...
HomeMy WebLinkAboutDuct SealingPlanning S, Development Services Budding A Code Regulation Division 2300 Virginia Ave, Rm 201 Fat Fib". FL 34982 T72462-2165 Fax 772-462b/43 FBC ENERGY CONSERVATION CODE Duct Sealing Certification PrescrlptIve and Performance Method Date �>� �Zo�—( Permit lit t 2 Oi$ (o Lot �- comrado. TorF�-) 6kAto_&<sl Address. %(o(-- Xd5ee7-5i AV Constnntion- Ghost Construction Test n Rough -in Test Test Conditions: G Date. -Z, 26ZI Floor Area (ft2): Z' Time: 9; IS At Primary Location of Supply Ductwork A � Indoor Temperature (F): 70_ Primary Location of Return Ductwork ,A-4-4-I �- Outdoor Temperature (F): 1 o(o Duct Leakage. v0el Test Pressure: Baseline Dud Pressure (op0a i i Prop. Leak Free Fan Press n Proposed On = Total Leakage (cfm). Total Leakage per 100 sgfl: Z CFewl 2-441 CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sgft. Testino Companv Company Name: (-A-t�CS PLUS Address: RSFsl ��e�.rH Lr-2 �STEeo FL_ 33928 I hereby certdy not the ab a Dud Sealing Leakoage results demonstrate compliance with 6" Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: ,J Pooled Name' St�VGrJ -i o License/Cenificatetf: