HomeMy WebLinkAboutDuct SealingPlanning S, Development Services
Budding A Code Regulation Division
2300 Virginia Ave, Rm 201
Fat Fib". FL 34982
T72462-2165 Fax 772-462b/43
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
PrescrlptIve and Performance Method
Date �>� �Zo�—( Permit lit t 2 Oi$ (o Lot �-
comrado. TorF�-) 6kAto_&<sl Address. %(o(-- Xd5ee7-5i AV
Constnntion- Ghost Construction Test n Rough -in Test
Test Conditions: G
Date. -Z, 26ZI Floor Area (ft2): Z'
Time: 9; IS At Primary Location of Supply Ductwork A �
Indoor Temperature (F): 70_ Primary Location of Return Ductwork ,A-4-4-I �-
Outdoor Temperature (F): 1 o(o
Duct Leakage. v0el
Test Pressure:
Baseline Dud Pressure (op0a
i i Prop. Leak Free
Fan Press
n Proposed On =
Total Leakage (cfm).
Total Leakage per 100 sgfl:
Z CFewl
2-441
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sgft.
Testino Companv
Company Name: (-A-t�CS PLUS Address: RSFsl ��e�.rH Lr-2 �STEeo FL_ 33928
I hereby certdy not the ab a Dud Sealing Leakoage results demonstrate compliance with 6" Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: ,J
Pooled Name' St�VGrJ -i o License/Cenificatetf: