HomeMy WebLinkAboutSewage Final Approvalr0qslz).
STATE OF FLORIDA ±�
DEPARTMENT OF HEALTH
'ONSITE 'SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION.INSPECTION AND FINAL APPROVAL
APPLICANT.. - Standafd Pacific FL: GP Inc
ACENTx The: Milcor Group, Inc.
PROPERTY ADDRESS`: 3108 NW'Radcliffe Way Palm City, FL 34990
LOT: 21 BLOCK:
1� ICATION #:AP'1.214942'
PERMIT #:56-SF 1645912,
DOCUMENT # : FI ,,11:3832
DATE PAID:12/03/2015
FEE PAID, 00:00
RECEIPT #.:56-PID-2855397
SUBDIVISION: Riverbend ID#: 4425-703-0026-000-3
CBECKEDfIX3 ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED,.
TANK INSTALLATION
-
SETBACKS
] [oi]
TANK SIZE [1] 1050.00 [21 483.00
[
]
[27]
SURFACE WATER 95 _
_ FT
] [02]
TANK.MATERIAL. Concrete
[
]
[28]
DITCHES 20
FT
] [03]
OUTLET DEVICE
(
]
[291
PRIIVATE WELLS
FT
]; 1041
MULTI -CHAMBERED [
Y
N ]
[
.]
[30]
PUBLIC WELLS
] [0$]
OUTLET FILTER Polylok PL-68
[
]
[311
IRRIGATION WELLS
FT
] [0.6]
LEGEND 1. 28-015-08SC3 2. 70-143-54SC4
[
]
1321
POTABLE WATER 57
FT
] {07]
WATERTIGHT
[
]
[33,1
BUILDING FOUNDATIONS 5''
FT
] [093
LEVEL
[
]
[341
PROPERTY LINES 5
FT
]' [09]
DEPTH TO LID
[
]
[35]
OTHER
FT
DRAINFIELD INSTALLATION
FILLED /!MOUND SYSTEM
] [10]
AREA [1] 803.72 [2] SQFT
[
]
[36]
DRAINFIELD COVER
]; [11]
DISTRIBUTION BOX HEADER X
[
]
[371
SHOULDERS
]' (-12]
NUMBER OF DRAINLINES 1. 5.00 2.
[
]
[381
SLOPES
] [13]
DRAINLINE SEPARATION
[
]
[391
STABILIZATION 05/15/2017
r [14]
DRAINLINE SLOPE
] [151
DEPTH OF 'COVER
ADDITIONAL INFORMATION
] 1163
ELEVATION (
ABOVE
/ BELOW ]BM 24.00
[
]
[401
UNOBSTRUCTED AREA
]' [17].
SYSTEM LOCATION
[
]
[41]
STORMWATER RUNOFF
[3.8];
'DOSING' PUMPS 1.00
[
]
[421
ALARM
[ ]
[191
AGGREGATE SIZE
[
]
[43]
MAINTENANCE AGREEMENT
l
j
[201,
[21].
AGGREGATE EXCESSIVE FINES
AGGREGATE DEPTH
[
[
]
]
[441
[451
BUILDING AREA
LOCATION CONFORMS WITH SITE PLAN
(. ]
[' ]
FILL / EXCAVATION MATERIAL
[22] FILL AMOUNT
([Z3] FILL TEXTURE l6
L
[
ti�11[
]
]
]
I467
[47]
[48]
FINAL SITE GRADING
CONTRACTOR Brian 'Dayis',(-Bdan Dayis.Sept_,
oTFIER INFILTRATOR Quick4 Plus; E036 LP
[ ]
[241
May
EXCAVATION DEPTH
ABANDONMENT
[25],
pr�<1vED
AREA,REPLACED P` G
[
l
[49]
TANK PUMPED
[26]
REPLACEMENT MATERIAL
[
]
[501
TANK CRUSHED & FILLED
Comments:
Comments are on page 2.
CONSTRUCTION [ APPROVED / DISAPPROVED
1: Fnvirnnmental
FINAL,, SYSTEM [ APPROVED / DISAPPROVED ]:
-L--- St. Lucie CHD DAM: 12/12/2016
J Ingram (ENVIRONMENTAL HEALTH)
St. Lucie CHD
IONMENTAL HEALTH)
(Explanation of violations on following page)
I
DH 4016,, 08/09 (Obsoletes all previous- editions which may not be used)
Incozpoated: 64E-6.003, FAC
EH Database v 1.0.1 AP1214942 EID1645912
DATE: 05/.15/2017'
Page 2 of 3
STATE OF FLORIDA
DEPARTMENT OF HEALTH
ONSI'VE SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION INSPECTION AND FINAL APPROVAL
Violation Number Comment
J, IcATxox #:AP12,14942
PEMUT #:56-SF-1645912
DOCMMNT #:F1111; 832
DATE PAID :12/03/2015
FEE PAZD A00.0,0
DT.rWTDT 0..56-PID-28553.9.7
The system is sized for 5 bedrooms with, a maximum occupancy of 10 persons (2 per bedroom); for a total estimated flow of 640
gpd.,1650<gal+483_gal ST in series. liberty 1/3 HP pump. 540gal DT 70-143-54SC4. 4x14+1x1511 ng=71 chambers.
No violations; system,bk to cover. Contractor notified onsite.
Needs final inspection for mound system and alarm check.
Final system approved. Buildingr department and contractors emailed final approval. _
DR 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated:. 64E-6-..003, PAC
EH Databaso v 1.0.1 AP1214942 EID1fi45912
Page. '2 of '3'