HomeMy WebLinkAboutFPUA InvoiceFort Pierce Utilities Authority , -
"Committed
"Committed To Quality"
Key Accounts' \
206 S. 6th Street
f�Q
Fort Pierce, FL 3498,4-3191
r
r `"Al
0.
Phone (772)466-1600
Fax (772)467-3115
Job Location: 8224 S OCEAN Fqk Invoice Number: KA-115-14
Account Name: JOE LABARBIERA PCN: 325750100360006
Contact Name: PHOENIX REALTY LocID: 54422300
Billing Address: 11710 TULIPA CT PALM BEACH GARDENS FL 33418
I
Phone: (561)799-5900 Fax: (-) - Cell: ( ) - Cust Type Commercial City Limits Inside
#
Size
Description .
Fees
1
1
Water Meter and/or Service Installation
$350.00
Water Security Deposit
$160.00
Water New Account Setup Charge
$40.00
Water Capital Improvement Charge
W ERC's 1.40
$1,288.70
Wastewater Security Deposit
$0.00
Wastewater New Account Setup Charge
$0.00
Wastewater Capital Improvement Charge „-�
WW ERC's
0.00
$0.00
Lien Fees
6.00
Construction Cost Estimate ..
Fees'.
0.00
0.00
T der:.
N.�/j RC'V
otal Paid: C 70
INSTALL 1";WATER METER
I 'MOND SANDS•PROJECT
Date Paid:
Down Payment: $0.00
Invoice Total: / 1.838.70
Check Number:U "
- ..v1T
Gus mers will be assessed wastewater charges t day they connect to the wastewater system or within 365 days from date wastewater Connection
Cha �i ff 'hfeT cost of the . rvice line from the point of delivery at the property line to the houselbuilding is the responsibility of the
custo Ii WY R e. aws require that a permit from the Health Department must be obtained prior to initiating a septic tank
abandonment. Contact the Health ep 72)873-4931,
Construction cost estimates are based on current labor, equipment and material prices. Actual costs of construction will be determined at the completion of
the project. Should unforeseen circumstances be encountered during construction, including but not limited to adverse weather conditions and
construction conflicts, the customer will be responsible for increased costs. Additional costs incurred by the customer shall not exceed fifteen (15)
percent of the total estimated construction costs e. Estim ed costs paid by the customer that exceed the actual cost of construction will be
refunded by Fort Pierce Utilities Authority.
Reviewed By: K " Strand Key Accounts Specialist Date: 08/25/2014
Customer's Signature: Date:
c� —
Printed Name: cfS. j2