HomeMy WebLinkAboutCreekside Lot 36-UG Plumbing[PUNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: 3 Z 4 — Z / Permit No. .2o 0 71,
Project: ✓-K S
Address: 3 3 S-o Tju,y; 7� L iR
3�
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping &Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
I
Equipment
Equipment
Re -inspection
Re -inspection
I
Re -inspection
Re -inspection
Final Building
Final Electrical
I
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: V20
Inspection Results: PAP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: C/G PIP 5,7�5 'L 4pp"u-7e l—Cia—lq
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: &11 ic.#: 8 N z{l0 8 8
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com