Page 1 of 3
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. E CONCRETE REPAIRS
5167 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2009-0182
PROJECT NAME: Ocean Harbor N. Condos – Bldg. E
Concrete Repairs DATE: March 25, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Units 108/208 & 408/508
OBSERVATIONS:
Shoring is in place as specified in the permit drawings.
Unit 108/208
• (10) Post tension (PT) cables have been locked off at the north elevation.
• Loose concrete has been chipped and removed around the cables.
• Existing bursting bars at slab edge are corroded and require replacing.
• Longitudinal reinforcing bars have minor corrosion and require power tool cleaning and coating.
Unit 408/508
• Lock off plates have been removed from (8) PT cables and have been re-stressed.
• Wedge anchors have been placed at the re-stressed cable ends and cables cut flush with slab.
• Due to the proximity of the cables, the re-stressing will be done in two phases. The remaining (5) cables will
be re-stressed next week.
• The secondary concrete pour at the lock off is complete.
RECOMMENDATIONS:
Unit 108/208
• Replace the bursting bars at the slab edge, dowel and lap with existing.
• Provide 45-degree bursting bars laps at the corner.
• The first pour shall include column type sections between PT cables for additional support during re-stressing.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-202 Report No. 4
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
St. Lucie County Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnel – Structure Con
Page 2 of 3
Pic 1
Unit 108/208
(10) PT cables locked off and concrete repair in
progress
Pic 2
Unit 108/208
PT cable lock off plates
Pic 3
Unit 408/508
Secondary pour at re-stressed cables complete
(5) Remaining cables to be re-stressed
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-202 Report No. 4
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
St. Lucie County Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnel – Structure Con
Page 3 of 3
Pic 4
Unit 408/508
Re-stressed PT cable ends.
Pic 5
Unit 408/508
Re-stressed PT cable ends.