Loading...
HomeMy WebLinkAboutDG Fort Pierce TCO applicationPLANNING AND DEVELOPMENT SERVICES Building and Code Regulation 2300 Virginia Avenue Ft Pierce, FL 34982 Telephone: 772-462-1553 Fax: 772-462-6443 Stockina Aareement and/or Temoorary ConditionallPhased 0ccu-oancy-.R-ecw-qiA Permit Number: 2007-0528 Contractor: Fulcrum Construction Group I (Print Name) Haymes Snedeker legal owner or lease holder of the below listed property do hereby request permission to occupy the structure located at the following address: (Address) 3751 Virginia Avenue Fort Fiercer 34981 I for 30 days (state the time required for completion, not to exceed 90) prior to the satisfaction of the following items which are known or may be noted in the County inspection reports. Outstanding Items: Water meter Certificate being requested: Stocking Certificate X Temporary Certificate of Occupancy Contact information of authorized representative: Name: Brian Knappenburger Phone (815 ) 262 9120 Email: brian.k@fulcrumgroup.com Following the approval of a Stocking Certificate, all remaining items, including life safety must be corrected or finished, inspected, and approved prior to any TCO request or use of the building(s) or structure(s) In consideration of possible failure on our part to correct the deficiencies noted and the potential to leave code deficiencies on the site, if required by St. Lucie County, I have provided a surety, to be held in escrow, for the amount $ which will be held until the St. Lucie County until any deficiencies identified above in County records related to this project, or in attached exhibits have been corrected, inspected and accepted by St. Lucie County staff. I understand that this completion agreement may be revoked, conditional occupancy prohibited and electrical power and/or water disconnected at any time for violations of this agreement. I understand that if it is determined I (we) have failed to abide by any of the specific conditions and agreements associated with the completion agreement, or have created, or have allowed any significant life safety violations to be present, my surety may be forfeited if the deficiencies listed are not corrected in accordance with the terms of this agreement. . I I -.-" '.0 Signature of Owner/Leaseholder). — I I - ` I J- - I I Sworn to or affirmed before me this 2�1 day of by 4W4rne5�.:a- 4ei=\e6s- 0M A who is/are personally known to me or has/have produced Print Notary Name: W S Notary Signature: qao Signature of Prime Contractor: Sworn to or affirmed before me this &I"i"day of E102n by 112 f `1 who is/are personally known to me or has/have produced as identification. Print Notary Name: Kb" D. P=a NOTARY PUWC (seal) Notary Signature: STATE OF FLORIDA C*T" GG357448 it Expires 7122/2023 @ p� By/—[E N, Tfyou are requestinig the use Ufproperty prior to the completion 0fconstruction, please beaware of the following information that affects the approval and use: We offer two (2)types of certificates allowing use of the property prior to the completion of construction: Stocking Certificate --AStocking Certificate is appropriate only when locating items ktthe property that will beneeded when the construction is complete. These items may include: Shelving Boxes Furniture Office furniture and/or furnishings, including office cubicles and filing cabinets To qualify for a stocking cortifivaba, fire sprinklers and fire alarm need tncomplete and operational to the point Qfprotecting the areas that are proposed for storage. The address must also be properly displayed as required. A stocking certificate may be issued for a limited area, such as "the warehouse area" which may be separated from other areas. The requirements are in place as additional fire load is added to the building or structure when materials and merchandise are stored in the building. A stocking certificate does not permit the use of the building or structure by the public. Under a stocking oedificete, no public use is permitted. The site is still considered e construction site, No use of the facility for int*rviawa, training of staff or other uses is permitted. For these purposes. o Temporary Certificate ofOccupancy (TC{})|nrequired Temporary Certificate of Occupancy (TCO) —ToquaUfyforaTCOoU|ife safety items must bein place and active, all accessibility requirements must be met, the address must be properly posted and all departments involved must sign off, these include, but may not be limited to: Building Electrical Mechanical Plumbing Gas Fire Landscape Zoning ERD--Environmental Resources Department Health Department While you may not be ready for a final inspection, this is the method currently used to get the inspectors to the site and authorize the use of the building by the public- It is important to contact the inspectors andlor have personnel on site to ensure the inspectors are aware that a TCO is being requested. While the result cdthe inspection isnot the most important issue, itmay be a^P"mom.^F^mUmr"|"noornpleteresult, the notes from the inspector need to say "OK for TCO" so the office staff knows it is authorized. Once approved, the TCO is valid for not more than ninety (90) days. It is intended to allow for minor items or special order items not related to life safety or accessibility to be received, installed and approved, Should it become necessary, oTCUmay be extended by the Building Official for one additional period not to exceed ninety (90) days. A TCO allows for use of the building or structure, or portion thereof, as shown on the TCO agreement that must beposted mnsite inmconspicuous location. apply at this time. JFA