Loading...
HomeMy WebLinkAboutdep approval Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Ron DeSantis Governor Jeanette Nuñez Lt. Governor Noah Valenstein Secretary March 31, 2021 Via Electronic Transmittal Peter Reed c/o Darwin Stubbs, P.E. Dear Mr. Stubbs: Acceptance of Foundation Location Certification Permit Number: SL-373 Permittee Name: Peter D. Reed Project Address: 4848 Watersong Way, Fort Pierce Project Location: Between approximately 220 feet and 270 feet north of DEP's reference monument R- 65, in St. Lucie County You are hereby notified that the foundation location certification for the referenced project was received via email on March 30, 2021 and was reviewed by the staff. The location of the foundation (the seawardmost pile) of the dwelling (including seaward covered porches / other) at 135.89 feet seaward of the coastal construction control line, as certified, complies with the requirements of the permit (137 feet seaward). You may proceed with construction as authorized. All terms and conditions of the permit remain in effect. If you have any questions, please contact me at the letterhead address (add Mail Station 3522), by telephone at 850/245-7671, or by e-mail to Nathan.bonanno@FloridaDEP.gov. Sincerely, Nathan Bonanno, Permit Manager Coastal Construction Control Line Program Office of Resilience and Coastal Protection cc: Peter Reed, Property Owner Sydney Wilson, CCCL Field Inspector