HomeMy WebLinkAboutEngineering Component & Cladding Wind Loads
Prepared for Edwing's Unlimited Shutter Services Calculations by Seaside Engineers
Project: Hunnicutt Residence Certificate of Authorization No.32048
Location: 2700 N.Hwy A1A#1407 4265 60th Court
Fort Pierce,FL 34949 Vero Beach,Florida 32967
Project ID: (722)202-8008 info@seasideengineers.com
Date: 3/26/2021 w wi.seasideenoineers.com
Design Information
Risk Category II
Windspeed 160 mph
Exposure D
Int.Press.Coef.,GCp,(+/-) 0.18
a 11.00 feet
Select the appropriate fastener size and spacing using the pre-engineered attachment schedule for the Florida Approved Product(s)or NOA used on this job.The
contractor is responsible to ensure the use of the proper material,reinforcement,components,etc.to meet the indicated pressure per the product approval
engineering document.The contractor is responsible to verify the component is in the appropriate zone using the"a"dimension shown above and diagrams
shown below.The building pressures are calculated using the Allowable Stress Design.Contact Seaside Engineers immediately if the substrate at the attachment
locations appears to have deterioration,abnormalities,damage,or other conditions resulting in questionable Integrity.
Florida
Product
Area Approval# Building Design Product Design
ID Opening Description (sqft) Zone or NOA Manufacturer Model Pressure(PSF) Pressure(PSF)
1 Accordian Shutter 219.3 4 FI389.2 ASSA Bertha HV Blade 1 44.0 -47.9 120.0 -100.0
2 lAccordian Shutter 73.3 4 FL389.2 ASSA Bertha HV Blade 1 49.3 1 -51.4 120.0 -100.0
typ `,}r,11 III 11/I/.�
3 2
2 �2 I I I I �� ��••••••�•
.2 . I I I I O ••G N ••
ROOF: 1 �' I I I I I �G/ • •i• i
d 0 ;2 2;0 ;2 Q! 10; 2 Q;0; 2 �.`` : No.722
I I I I � • •
2 2 I I I I s S E OF T ••
3 2 3 3 1 2 1 3 3 1 2 1 3 /� ,[� • •4 Q(�}Q• • ,�
40
11�% s/ONA;f0\��```
WALL: h Edward K Roske, PE
1 6 0 March 26,2021
5 I ®
.file Copy
INSTALLATION SCHEDULE
Unit Wall Shutter Shutter Shutter Storm Anchor Header Storm Mullion
No. Pressure Width Height Span Bars# Spacing Reinforce Panels 'Type
Inter/End Vert/Horz. Rgq'd Req'd Bolted
SIN YIN
+ InMorEnd f / { Top (Q
I + � 6/). !e.0 lV i� Bo om
Interior End Tog p' �f
}N9 j_S I.q ((_ 6,t q tI Vat � ( �c1 N iV !\
t � I� !v Bottom 1`
1�:nor End P�>Bgft,m
�Ottom
�InteriorEnd
J�eriorEhd
1�17teriorEnd Interior Ead
:Interior End Top
Bottom
Interior End TOP
Bottom
>rnteriorEnd Top
Bottom
Inte�Eaid TOP
Bottom
Interior End T.°P
+
Bottom
Interior End Top
Bottom
Interior End Top
Bottom
Interior End TOP
Bottom
Interior End Top
+
Bottom
Interior End Top
+
Bottom
�Inleriur End TOP
Bottom
InteriorEnd TOP
+
Bottom
File Copy