HomeMy WebLinkAboutInsulation Cert 7
INSULATION INSTALLATION CERTIFICATE
T4: Phoenix Companies LOT BLOCK: SECTION:
JOB#:110895 JOB NAME: Burke Res
JOB ADDRESS: 8016 S Ocean Drive
The undersigned hereby certifies that insulation has been installed at the above described property as'
follows:
1. Exterior CBS walls have been insulated with............................Check one ( )Spray on cellulose
to a thickness of N/A inches,which thickness,according to the ( )Fiberglass blankets
manufacturer, FiFoil ()Q Aluminum Foil
Density N/A will yield an"R"value of 4.1 ( ) Rioid
Exterior Frame walls have been insulated with............................Check one ( )Spray on cellulose
to a thickness of inches,which thickness,according to the ( )Fiberglass blankets
manufacturer, ( )Aluminum Foil
Density N/A will yield an"R"value of (,)Other Spray Foam
2. Main Ceilings have been insulated with.........................Check one ( )Fiberglass blankets
to a thickness of 5.25 inches which thickness,according to the O Fiberglass loose fill
manufacturer,. SES Sucraseal
( )Aluminum Foil
Density N/A will yield an"R"value of 20 00 Spray Foam
Ceilings cathedral have been insulated with.........................Check one O Fiberglass blankets
to a thickness of inches;which thickness,according to the O Fiberglass loose fill
manufacturer, ( )Aluminum Foil
Density N/A will yield an"R"value of O Other Cellulose
3. Interior knee walls have been insulated with.................................Check one ( )Fiberglass blankets
to a thickness of 5.25 inches,which thickness,according to the { )Polyurethane
manufacturer, SES Sucraseal ( )Spray on cellulose
Density N/A will yield an"R"value of 20 00 Other Spray Foam
4. Garage partition walls of conditioned living areas have been
insulated with.... ....... . Cleel oae 0()Fiberglass blankets
to a thickness of3.5 &6.25inches,which thickness,according to the ( )Spray on cellulose
manufacturer, Certainteed ( )Polyurethane
Density N/A will.yield an"R"value of 13 & 19 ( )Other Aluminum Foil
MULTI FAMILY RESIDENTIAL CONSTRUCTION. ONLY: The common (party) walls separating
different tenants shall be insulated as follows-Frame/Metal stud walls R-I I (Min.);CBS or Concrete walls
R-3(Min.);by Energy Code requirements. See Energy Code Rev.1187,paragraph 903.2(b),on page 9-17,
latest edition. These"minimums levels of insulation"are not included in the Energy Calculations,but shall
be installed in the field:
NOTE: Densities of sprayed on, loose fill,or any other composed-on site insulation shall be the P.C.F.
(lb/ft3)average of three(3)"DRY SAMPLES"of actual installation.
MER Enterprises,LLC
Insulation Contrµ to yy Insulation Contractor Signature
MCIN6231 8/16/18
Insulation Contractor's CC# Date of Certification
r N
Builder's Name-Builder's CC# �Pe b tc G
n, "n z