March 31, 2021
Saint Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Referenced Permit Numbers:
2011-0432: (Lot #7) 132 Ocean Estates Drive
2012-0628: (Lot #9) 140 Ocean Estates Drive
2012-0631: (Lot #20) 151 Ocean Estates Drive
2012-0636: (Lot #23) 139 Ocean Estates Drive
2012-0656: (Lot #28) 119 Ocean Estates Drive
The following addresses the remaining comments for the permits referenced above not previously addressed by Nasrallah Architectural Group and Earthworks Group.
Comment:
Submit plans for the fire sprinkler system 107 FBC 6th ED 2017
Response:
Fire sprinkler plans are not complete. Will be submitted when finalized by Wayne Automatic Sprinkler.
Comment:
Please show the flood zones on the survey. ([A] 107.2.1)
Response:
See revised survey by Hayhurst Land Surveying.
Comment:
Product Approvals expired ([A] 107.2.1). 107-0614.16 Windows Mullions, Fixed Glass expired. Need separate Product Approval for each product. 17-0420.12-Sliding Doors expired.
Response:
See revised Product Approval Affidavit and Product Approvals for single hung windows, fixed windows, mullions, front door, French door and sliders.
Comment:
Sheet A1.1, suspended air handler and 50-gallon water heater. Please show loading on the truss drawings. Provide details for hanging equipment. ([A] 107.2.1)
Response:
The hot water heater will be installed to rest on the floor and not hang from the ceiling. Nasrallah Architectural Group has provided the detail on page A1.1.
Comment:
The survey has an incorrect flood plane and year. The survey will need the flood information from of the maps of 2020. Please provide corrected survey.
Response:
See revised survey by Hayhurst Land Surveying.
Comment:
Please provide insulation value of 2nd floor as depicted on sheets A7.1 of Architectural Plan set and on Energy Calculation, per 107.2 of the FBC 6th Edition, 2017.
Response:
Revised Energy Calculations provided by Earthworks Group.
Comment:
Please provide the HOA letter of Architectural approval.
Response:
See HOA letter of Architectural approval.