HomeMy WebLinkAboutLetter, comments from D Harvey1
JPI inc
From:Douglas Harvey
Sent:Monday, April 5, 2021 8:29 AM
To:Adam Reilly
Cc:David Johnson; Andrew Wentz; William Durden; JPI inc
Subject:RE: Morton Buildings (New Permit Application for Hangar) Permit Number 2101-0235
Mr. Reilly
You and the plans examiner are correct in the proper designation for use under the building code is S-1 for this
structure. Here is the excerpted section of the code from 311.2
311.2Moderate-hazard storage, Group S-1.
Storage Group S-1 occupancies are buildings occupied for storage uses that are not classified as Group
S-2, including, but not limited to, storage of the following:
· Aerosol products, Levels 2 and 3
· Aircraft hangar (storage and repair)
While the zoning and use of the property is residential and this structure will ultimately be used as a residential
hangar, the structure does not appear to meet the requirements of section 412.5.5 to be considered as a
residential hangar under the governing building code in order to utilize section 412.5 for a residential hangar.
The hangar needs to comply with the applicable sections of section 412 of the 7th edition of the Florida Building
Code – Building.
I have spoken with Andy regarding the plan review comments. We will not be treating this as a commercial
structure, it is considered residential as the property is located in a residential zoning and commercial uses are
not permitted. With this said, we cannot apply section 412.5 of the code as the building appears to exceed the
limitations.
412.5.5Height and area limits.
Residential aircraft hangars shall be not greater than 2,000 square feet (186 m2) in area and 20 feet
(6096 mm) in building height.
Please ensure the appropriate sections of section 412 of the FBC-B are applied to the plans and we will
complete the review accordingly. Thank you for your assistance in getting this permit issued.
Douglas Harvey | Building Official
Ph: 772-462-2186 | Cell: 772-370-2542 | 2300 Virginia Ave. Fort Pierce 34982
harveyd@stlucieco.org
facebook.com/stluciegov | twitter.com/stluciegov | instagram.com/stluciegov | youtube.com/stluciegov
The County is OPEN for business, though, the building remains closed to the general public to
keep our citizens and employees safe during the pandemic. The Building Department is
operating in a new location, just a few feet from the main lobby, at the SW corner of the
building (formerly the Utilities Department). Look for the GREEN A-Frame signs. The hours of
2
operation are Monday – Friday from 8:00 am to 4:30 am. All staff is available by email or
phone.
Please be safe during these unprecedented times while we do our best to help the community
remain safe as we operate at the new normal.
From: Andrew Wentz <WentzA@stlucieco.org>
Sent: Friday, April 2, 2021 12:52 PM
To: William Durden <DurdenW@stlucieco.org>
Cc: David Johnson <johnsond@stlucieco.org>; Douglas Harvey <harveyd@stlucieco.org>
Subject: Fwd: Morton Buildings (New Permit Application for Hangar) Permit Number 2101-0235
This is 3rd time in 3 days I have received this email. As per your directions William I reviewed and commented as a
commercial project. Do I need to respond to this emails or is anyone in contact with them?
Andy Wentz
St. Lucie County
Building Inspector/Plumbing Plans Examiner/Family 1&2 inspector
PH: 772-462-2172
The linked image cannot be displayed. The file may have been moved, renamed, or deleted.
Verify that the link points to the correct file and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the
correct file and location.
How was your service? Please contact, Monica Graziani , at Grazianim@stlucieco.org to submit your suggestions,
comments
The County is open for business, though, the building remains closed to the general public to keep
our citizens and employees safe. The Building Department is operating on the first floor in the
lobby, and the hours of operation are Monday- Friday from 8:00 am to 4:30 pm. All staff is
available by email or phone. If you need to contact me, my direct extension is 462-1599.
Please be safe during these unprecedented times while we do our best to help the community remain safe as we
continue to operate at the new normal.
Thank you
Begin forwarded message:
From: Submittals <Submittals@stlucieco.org>
Date: April 2, 2021 at 12:36:44 PM EDT
To: Andrew Wentz <WentzA@stlucieco.org>
Subject: FW: Morton Buildings (New Permit Application for Hangar) Permit Number 2101-0235
From: Adam Reilly <Adam.Reilly@mortonbuildings.com>
Sent: Thursday, April 1, 2021 9:31 AM
To: Submittals <Submittals@stlucieco.org>
Subject: RE: Morton Buildings (New Permit Application for Hangar) Permit Number 2101-0235
3
SECURITY WARNING: This email originated from outside the County systems. Please show
caution when clicking links or opening attachments unless you recognize the sender and know
the content is safe.
Good morning,
Please confirm that this attachment has been sent to Andy Wentz. This letter is in response to
comments left pertaining to plumbing.
Thank you,
Adam Reilly
Morton Buildings, Inc.
1182 Tamiami Trail Unit B
Port Charlotte, FL 33953
Cell: 321-292-4487
Office: 941-766-6163
Fax: 941-766-6164
Website……………………………… www.mortonbuildings.com
Online brochures…………………… http://issuu.com/mortonbuildings
Video's………………………………. http://www.youtube.com/user/MortonBuildingsAdv?feature=g-all-u
Morton’s new Foundation System... http://www.youtube.com/watch?v=ixXH5y4AFBA
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business
are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for
personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption
applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all
computers.