Project No. 20-202 Report No. 5
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
St. Lucie County Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS – BLDG. E CONCRETE REPAIRS
5167 N. HWY. A1A, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2009-0182
PROJECT NAME: Ocean Harbor N. Condos – Bldg. E
Concrete Repairs DATE: April 1, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Unit 108/208 – Pre pour
OBSERVATIONS:
Shoring is in place as specified in the permit drawings.
Unit 108/208
• (10) Post tension (PT) cables are locked off at the north elevation.
• New bursting bars are in place at the slab edge behind the PT anchor plates.
• Additional 45-degree busting bars are lapped at the corner.
• Form boards are in place for first pour as required prior to re-stressing cables.
RECOMMENDATIONS:
• None at this time.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 20-202 Report No. 5
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
St. Lucie County Bldg. Dept.
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure Con
Page 2 of 2
Pic 1
New bursting bars behind PT anchor plates.
Pic 2
PT cable lap splice encapsulation.
Pic 3
First pour forms, clearance to remove lock off plates
prior to re-tensioning.