Loading...
HomeMy WebLinkAboutCreekside Lot 73-Bond Beam-2nd Story.pdf[BUNIVERSAL ENGINEERING SCIENCES Inspection Date: Project: C es,h2 Address: L 3 s' �Ilzlr/-r y C� jz Check one: 14 Regular Inspection: INSPECTION RESULTS Permit No. goe/ " o / P / ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock I Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 1.2-8 B. lq_Q� Jod Sf Inspection Results: 1 AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 5r a ;z-,P d +L,4ps 1. 2. 3. 4. 5. 6. 7. Inspector's Name:Lic.#: 1�k) L114$ 3 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 - (772) 924-3580 (fax) www.teamgfa.com