Loading...
HomeMy WebLinkAboutCreekside Lot 73-Column-2nd Story.pdf®UNIVERSAL` ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: �' S- zl Permit No. -:1� << — o I Y Project: Address: -3 Z 3 73 Check one: W Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry K Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: I 19 (2O L-- ? poi S-jd Inspection Results: LAP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: Ck S t ze ¢ -rl" -16 w ,O'yJfZ, 1. 2. 3. 4. 5. 6. 7. Inspector's Name: A ��(�JL z Lic.#: 9Ai-) 468� OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com