HomeMy WebLinkAboutInspection Docs Planning &Development Services`r
Building&Code Regulation Divisions
B 2300 Virginia Ave '
Fort Pierce FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
-CONSTRUCTION SOIL TREATMENT
PERMIT #: 2w1 -03 JOB ADDRESS: 108 js c)kes fir.
BUILDER/CONTRACTOR: K_r`�, S (- 16-os wuJ� _
PEST CONTROL CONTRACTOR: CGC-G)trk0_ pQ-N CMfirt�
PEST CONTROL LICENSE #:
We,the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
I
Square feet if area treated: 0� Chemicals used: :13- J�Z
Percentage of solution: G Co Total gallons.used:
Date of Treatment: a 1 a J aj Time of Treatment: �2 30
Footing ✓Slab
Is Treatment �V Treatment
Re-Treat Re Treat
Driveway Pools
1It Treatment 1'Treatment
Re-Treat Re-Treat
Other Perim et Final Inspection
1st Treatment
Re-Treat � !o? a.l
Signatureof Extelini for Date
Note. There must be a completed form for each required treatment orre-treabnentand this form must be on the job
site to be picked up by the inspector at bme of each inspection or Me scheduled inspection will fail and a re-inspection
fee charged.
FBC104.2.6 Cerirficate ofProtectrve Treatmentforprevention of termites A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective ireabnent is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shall provide the product used,identity of the applicator, time and date of the treatment,site location,area
treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record of
protective treatment If the soil chemical barrier method for termite prevention is used,final exterior treatmentshall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover,listing all the treatments and dates of applications.
Revised 7/24/2014