HomeMy WebLinkAboutSLC Building PermitCode Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-2172 Fax: (772) 462-6443
http://www.stlucieco.org/public—works/p6rmitting.htm
Job Location: 4945 CONLEY PL
Permit Type: Roof
Job Description:
f'--f -f, Rr,0
BUILDING PERMIT
714^1i�: ��iMWiL•TALWATfiL•Ttl
City: FORT PIERCE
TEAR OFF - RE- ROOF FIBERGLASS SHINGLES 2800 SF - 5/12P FOR SINGLE FAMILY RESIDENCE
Page 1
S/D Lot: Block: Parcel: 1313-131-0005-000/2
Contractor NEWLAND RICHARD A NEWLAND CONTRACTING INC (772) 464-4329
8004 GEORGES RD FT PIERCE, FL 34951
Property Owner ROBERT DOOLING (772) 532-7834
4945 CONLEY PLACE FORT PIERCE, FL 34951
Property Owner VICTORIA CURRAN (772) 532-7834'
4945 CONLEY PLACE FORT PIERCE, FL 34951
Setbacks Left:
Number of Units: 1.00
Minimum Floor Elevation:
Right:
Floors: 1
Front: Rear:
Buildings: 1
Flood Map: Flood Zone:
Zoning: RS-4
Square Footage: 0.00
Elev:
Permit holder acknowledges through acceptance of ,this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.