HomeMy WebLinkAboutLetter; Pentrometer TestI =# (4TC�� Headquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 October 8, 2019 �`C1t AVIL Ando Builders Attn: Andre Dorawa, Jr. 389 Sebastian Blvd. Sebastian, FL 32978 Re: 1836 Wildcat Cove Drive Fort Pierce, Florida KSM Project #: 191273-b inspection Dear Sir: Mailing FNAINORINA P.O. Box 78-1377 AND TESTING Sebastian, FL. 32978 Phone: 772-589-0712 C.A. # 5693 KSMengineering.net As requested, KSM Engineering & Testing has performed a subsurface investigation at the above referenced site. The data gathered during the investigation, together with our geotechnical related opinions, are included in this report. Site Description: At the time of drilling, the waterfront site was flat and had the footprint of the residence marked in the field with stakes. Site Investigation: The site investigation program consisted of performing thirteen (13) Standard penetration test borings in the proposed footprint of the structure. The borings were terminated at depths of 8 to 14 feet below existing grade. These tests were performed in order to verify that the soil densification had been achieved through grouting under pressure. The locations of the borings are indicated on the attached boring Location Plan. The SPT borings were completed in accordance with procedures described in ASTM D-1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Proudly Serving Florida since 1990 Page 1 of 2 Headquarters 11345 U.S. Highway 1 IV'O Sk At ENGINEERING Mailing P.O. Box 78-1377 Orlando Sebastian, FL. 32958 4VA AND TESTING Sebastian, FL. 32978 Phone: 772 589-07 2 723 Progress Way C.A. # 5693 Sanford, FL. 32771 KSMengineering.net Engineering Evaluation and Conclusions: We performed borings on this site in order to verify that the site had been properly stabilized through cement grouting under pressure, the results of these investigations are as follows: September 21, 2019, we performed Borings SPT-1 through SPT-4, we did not find the site had been densified as recommended in our report. There was still a loose layer between 5 and 7 feet below grade. We informed the contractor that the soils had not achieved densification. September 30, 2019, we performed Borings SPT-5 through SPT-11 and found the rear of the property had been densified however we still found the loose layer in the front of the property. SPT 6, SPT 7 and SPT 8 showed densification, SPT 9 was done as a control boring at the request of the grout contractor. SPT 10 was a boring done using a different mixture of grout. SPT 5 and SPT 11 did not show densification. We informed the pressure grout contractor of our findings and recommended further review by them. The pressure grout contractor came onsite on October 4, 2019 to add additional pressure grout locations. October 7, 2019, we performed Borings SPT-12 through SPT-13 and found the soils had been densified in the locations tested. Even though we have borings showing the soil has been densified, due to the variations in the soil profiles, we are recommending top steel be placed in the foundation to allow the entire foundation to engage and bridge any possible loose soils. The contractor shall install two #5 bars at the top of the footer with #3 stirrups at 6' o.c. The site should be prepared in accordance to our previous soils report, dated April 1, 2019. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please feel free to contact us. ulie EXetler, P. •'•��� '����`� Proudly Serving Florida since 1990 4L �L.+•• Page 2 of 2 KSM Engineering 8 Testing• BORING NUMBER SPT-1 �j ox 78-1377 PAGE 1 OF 1 1Vl Sebastian, t aKSn, FL 32978 Tel:(772)-589-0712 Fax:(772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273=b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8/21/19 COMPLETED 8/21/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split.Spoon Sample SAT TIME OF DRILLING 2.33 ft LOGGED BY MS/SF CHECKED'BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- a o z ♦ SPT N VALUE w 20 40 60 80 Z0 a. O MATERIAL DESCRIPTION �m -1 2 _ WW > Cy �z� O O¢ (WL W H� z a PL MC LL F---� —1 o `� -r a O a m r" 20 40 60 80 0 z W U z 0 0 ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 Brown Sand, Slightly Clayed with Traces of Roots SS 5-5-5 (10) :.......:.......:.......:.. Brown Sand with Traces of Shell Fragments 0 9-9-10 (19) 5 : .... ... ... ... Gray Sandy Clayed Silt 6-1-1 SS (2) .. .... ... ... ... Gray Sand, Slightly Silty 2-4-6 SS (10) Bottom of borehole at 8.0 feet. -. a N O) K W W fn X_ N U O O to W J LL ca Ir W K W N `7 m H • O O m 5 co O7 F y U' N H O J a x m x WU W O' W O KSM Engineering &rresring; BORING NUMBER SPT-2 KSM S basstian, FL 32978 PAGE 1 OF 1 Tel:(772)-589-0712 Fax: (772)-589-6469 3LIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive DROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce. Florida )ATE STARTED 8/21119 COMPLETED 8/21119 GROUND ELEVATION HOLE SIZE inches )RILLING CONTRACTOR GROUND WATER LEVELS: )RILLING METHOD Split Spoon Sample � AT TIME OF DRILLING 2.08 ft _OGGED BY MS/SF _ CHECKED BY JEK AT END OF DRILLING — 40TES See Attached Location Plan AFTER DRILLING — w A SPT N VALUE �,� U �m wo �z� w a- H 20 40 60 80 PL MC LL a0 O 0 MATERIAL DESCRIPTION _3 X > d O� O D¢ o C7 a� z co V ? 20 40 60 80 Lu 0 O ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 Brown Sand, Slightly Clayed with Traces of Roots SS 5-6-7 :.. ;o':::..• - Brown Sand with Traces of Shell Fragments (13) .. (16) ... ... ... .... 5 Gray Sandy Clayed Silt 6-2-2 SS (4) SS 3-5-8 (13) ......................... ...... Gray Sand Bottom of borehole at 8. U O O KSM Engineering & TestingBORING NUMBER SPT-3 r /j P.O. Box 78-1377 jaS Yl KS bassi an, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8121/1.9 COMPLETED 8121/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample VAT TIME OF DRILLING 2.08 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location, Plan AFTER DRILLING - a o z A6 SPT N VALUE A U 0_ >- u1 p=¢ w o_ 20 40 60 80 PLi a� ov o -' MATERIAL DESCRIPTION w Co o_� > 0 O� m0> A " Z Q �" 0 —� 20 80 0 z v U? 40 60 < 0 W ❑ FINES CONTENT (%) ❑ 0 1 20 40 60 80 Brown Sand, Slightly Clayed with Traces of Roots :.•. •:. Brown Sand Traces Shell Fragments SS 5-6-7 (13) with of SS (16) 5 Gray Sandy Clayed Silt :: • .: 3-2-2 ..:....... '• `:',';: ::.,• Gray Sand . 'S 3-5-7 ....... i....... i....... :....... (12l at 8.0 feet. KSM Engineering a Testing. BORING NUMBER SPT-4 P.O. Box 78-1377 11 S � ,)- 1 yl Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8/21/19 COMPLETED 8121/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 2.08 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — °}} o W ♦SPTNVALUE ♦ = ~ U 00 F w g 2^ > d ►f-w O z ¢ o- rjj H Z i 20 40 60 80 i1A� jL o �" —i MATERIAL DESCRIPTION n. O m O> } I — 20 40 60 80 (g Z w U z O p FINES CONTENT n O 0 20 40 60 80 Brawn Sand, Slightly Clayed with Traces, of Roots 6-8-9 ;• 3S (17) .......•.......:...............:...... Brown Sand with Traces of Shell SS 7-10-6 (16) :....... :....... :....... :...... ...... :....... :....... :....... :...... 2-1-1 Gray Sandy Clayed Silt SS (2) SS 3-6-9 (15) Gray Sand .._.........:.......i..... .... .Bottom of borehole at 8.0 feet. KSM Engineering & Testing i. BORING NUMBER SPT-5 /f 8-1377 P.O. BoxlVl KSFL 32978 S bas i n7 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. 'PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 9/30/19 COMPLETED 9/30/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 2.92 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- w o ♦ SPT N VALUE U c� >a- w w >- o:o w w ° �� 20 40 60 80 PL MC LL a O MATERIAL DESCRIPTION g > C'1 OV� 0Z-i O¢ mOZ w N Lu z a I pv �Z }" 20 40 60 80 0-' uj � ❑ FINES CONTENT (%) ❑ a 0 20 40 60 80 Brown Sand with Some Shell and�Roots { Brown Sand with Traces of Shell 5-5-6 :....• SS �'•`O` SS 6-5-5 '.: Dark Brawn Clayed Silt with Traces of Organics 5 •. ;.•• SS Light Gray Sand, Slightly Silty with Traces of Shell Fragments SS2�sai3 ........................... Bottom of borehole at 8.0 OIco r KSM Engineering & Testing BORING NUMBER SPT=6 ]jS ]� P.O. Box 78-1377 l�Sebastian, FL32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION _Fort Pierce, Florida DATE STARTED 9130/19 COMPLETED 9/30119 GROUND ELEVATION _ HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample 4 AT TIME OF DRILLING 3.00 ft 'LOGGED BY MSlSF CHECKED BY JEK AT END OF DRILLING --- NOTES See Attached Location Plan AFTER DRILLING - w o • SPT N VALUE a� = co o: w >- o: o v7 w M H O uj (L W � 20 40 60 80 PL MC LL W O MATERIAL DESCRIPTION : j c7 O' B w N z Q '} 1--0 0 a D O W m 0> ` 20 40 60 80 U5 Z a U 2 0 W D FINES CONTENT (%) ❑ 0 1 1 1 20 40 60 80 a,'.:{ Brown Sand with Traces of Roots and Shell Fragments Brown Sand with Traces of Shell 4-4-4 ESS o.. :. SS 4-5-4 9) Grayish Brown Sand with Some' Shell and Pieces of Grout ; SS 6.8-7 ;.. Brown Sandy Clayed Silt _. (15) :....... :.......:...... ... . . Gray Sand, Slightly Silty with Traces of Shell Fragments SS of borehole at N� J T to KSM Engineering & Testing ^ BORING NUMBER SPT-7 j� (� /j 8-1377 S Vl l LS basstian? FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION -Fo rc rt Piee Florida DATE STARTED 9/30/19 COMPLETED 9/30119 GROUND ELEVATION _ HOLE -SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING MET140D Split Spoon Sample AT TIME OF DRILLING 2.75 ft LOGGED BY MS/SF _ CHECKED BY JEK AT END OF DRILLING_ NOTES See Attached Location P'an AFTER DRILLING -- a z tt ♦ SPT N VALUE ►-. v o: Wm } _ Wo w �Z� w °-� S �"� 20 40 60 80 PL MC LL w nz MATERIAL DESCRIPTION - g > 0' 0¢ o IL O � to 6 X " } .. 20 40 60 80 ❑ FINES CONTENT (%)"17 < W a 0 0 20 40 60 80 o;:'.:; Brown Sand with Traces of Roots and Shell Fragments (� Brown Sand with Traces of Shell, 4-5-5 ESS (10) :......:..................... SS 6-8-9 :.....:...... --R— 5 Dark Brown Clayed Silt with Traces of Organics and Pieces of (17) .... .. Grout SS 3-2-2 _..., .• (4).... ....... :.......... ....:..... •,•. •.; q. Light Gray Sand, Slightly Silty with Traces of Shell Fragments SS 2-11-16 (27) Bottom of borehole at 8.0 feet. CL a a m a m to w m w N W Y_ fq U U � O rn W W J U. r- W K W N ry �i m _o 3 n n m m a r m z z I N h O J IL x m s U W A w � fi KSM Engineering &Testing L BORING NUMBER SPT-8 jj�M P.O. Box 78-1377 PAGE 1 OF 1 L1 -Sebastian,. FL 32978 Tel: (772)-589.0712 Fax: (772)•589.6469 CLIENT Ando Buildina`Corp. __ _ PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 9130/199 COMPLETED 9130119 GROUND ELEVATION __ HOLE SIZE inches DRILLING CONTRACTOR_e GROUNDWATER LEVELS: DRILLING METHOD . Split Spoon Sample AT TIME OF DRILLING 3.08 ft _ LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING - NOTES See Attached Location Plan AFTER DRILLING - w ♦ SPT N VALUE U ° [r o } N w w 20 40 60 80 `� _mow O MATERIAL DESCRIPTION �o j a �F-D 0¢ ° w H� PL MC LL� o -' a � O a CDO > Y " �- 20 60 80`� C7 Q Z ui U 2 a o _40 _ p FINES CONTENT (%) 0 0 20 .40 60 80 o Brown Sand with Traces of Roots Brown. Sand •u,-.____..:__..�..__.-_. _._.,�.._....._�, 5-5-7 02) :.. o :.; Gray Sand, Slightly Silty with Some Shell Fragments _ ... . :o.; . - SS 9.11-10 i Dark Brown. Clayed Silt with Traces of Organics and Pieces of _ 5 Grout 2-2-2 0.. ' ; Light Gray Sand. Slightly Silty withTraces of: Shell Fragments-15-17(32) FS—S Bottom of borehole at 8.0 feet, a t9 m N LLl Q: W N x w' x 0 s N W J LL Y. W } tr W N Y N T O m 0 is Q (9 N O to N z B v� F O :J a x m s U w 0 O w A ,� KSM Engineering & `resting BORING NUMBER SPT-9 PAGE 1 OF 1 1V1 S bas aKSn, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 9130119 COMPLETED 9/30/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample � AT TIME OF DRILLING 2.92 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- �.. LU U =c7 CL p MATERIAL DESCRIPTION c c- W m J o >- _ wo > a g w �zD O ff¢ Z w IL w.4 ~� z n �" A SPT N VALUE A 20 40 60 80 PL MC LL F—�i �� a.= O- m0> Y" 20 40 60 80 O < z � U ? o ❑ FINES CONTENT (%) ❑ a Brown Sand with Traces of Roots, and Shell Fragments Brown Sand with Some Shell Fragments SS 2-2-3 ':. (5) Gray Sand with Some Shell SS 5-6-8 (14) ............................... Dark Brown Clayed Silt with Traces of Organics X: SS 2-2-2 (4) ..... :....... :....... :....... SS 3-5-5 (10) ....... :....... :....... :....... : Gray Sand, Slightly Silty with Traces of Shell Fragments Bottom of borehole at &0 feet. n KSM Engineering & Testing CSORING NUMBER SPT-10 /f PAGE 1 OF 1 aKsn, FL 32978 1 vl S basti Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 9/30/19 COMPLETED 9/30119 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q. AT TIME OF DRILLING 3.33 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING --- W o ♦SPTNVALUE ♦ U 20 40 60 80 ip 0-O ca >( p z -i wx P L a. w� MATERIAL DESCRIPTION W a� O� m0> N �- z CL ��- 20 40 60 80 o z V? ❑ FINES CONTENT (%) 0 � 0 0 0 20 40 60 80 o; • ::!: Brown Sand with Traces of Roots and Shell Fragments Brown Sand with Some Shell Fragments 2-3-3 SS (6) :....... :.......:....... :....... SS 2-6-7 :. :., Dark Brown Clayed Silt with Traces of Organics (13) ........... ...... ..:.. b 2-2-2:: :.(4) US—SS ......:.......:....:.......:.....2-1-1 (2) Bottom of borehole at 8.0 feet, a (7 m rl r` N Ot W� i 111 to Y_ to U O O T U1 W J LL to W WW N N O N m `ro U F- O C7 m 5 In 3 0 P c c7 vi 0 J a x m x U W H O w c7 KSM Engineering & Testing BORING NUMBER SP'T-11 KSM PAGE 1 OF 1 Sebastan, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Buildinq Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 9/30119 COMPLETED 9/30/19 'GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 2.83 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING -- NOTES See Attached Location Plan .AFTER DRILLING --- a a w A SPT N VALUE v a �- cn w 20 40 60 80 H "' 2 o- p MATERIAL DESCRIPTION W M j d p Z¢ n. w Y z a I M= ,L w -� n. � O m O > Y v 20 40 60 80 O Q z W U z 0 � ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 Brown Sand with Traces of Roots Brown Sand with Traces of Shell 4-4-5 SS (9) Gray Sand with Some Shell ' 4-5-5 SS (10) .. Dark Gray Clayed Silt with Traces of Organics :... SS(2) ....... ....... :....... ....... i....... :•.. o. • ; : Gray Sand, Slightly Silty with Traces of Shell FRagments SS (12) Bottom of borehole at 8.0 feet. a C7 ai N O, uj W W N Y O O O O> 9 W J LL r2 N W uj W co co n lV m fo O 0 C) Qm J y 0 r z (N F O -.I a x m x 0 w 0 O w KSM Engineering & Testing'BORING NUMBER SP'T-12 (� /f K PAGE 1 OF 1 1 Yl Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589.6469 CLIENT Ando Building Corp. _ � PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 01273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 1017119 COMPLETED 10/7/19, GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME. OF DRILLING 3.33 ft LOGGED BY MS/SF CHECKED BY JEK AT END OF DRILLING NOTES See Attached Location Plan AFTER DRILLING - A SPIT N VALUE F- U _� a rr Wm > _ wo N w �zJ W -� 20 40 60 '80 PL MC LL a. O MATERIAL DESCRIPTION > a O¢ ►a—� W Y " Z n t---�---f o C7 a Z O in O > U Z Y 20 40 60 80 ❑ FINES CONTENT ("/o) ❑ W a 0 0 20 40 60 80 Brown Sand with Traces of Roots Brown Sand, Slightly Clayed 6-5-6 SS ............................ o • . .: Brown Sand with Traces of Shell Fragments and Pieces of Grout 911:10 SS SS 5-4-3 - - Gray Sandy Clayed'Silt with Traces of Organics (7) a•. • ; Gray Sand, Slightly Silty with Traces of Shell Fragments. 2-5-11 o C, SS (16) 10 Gray Sand, Slightly Silty SS 14-17-23 m d, (40) s SS 19-27-36 (63) .......:....... ..............ILI ... SS21- (9b ) x Bottom of borehole at 14.0 feet. U O O N W J LL In X W (Y- W VI CptJ „ m a r O U m 5 In a 0 r m r z V) O a x m x W W r O w O KSM Engineering &Testing 60RING NUMBER SPT-13 KSMP.O. Box 78-1377 PAGE 1 OF 1 Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Ando Building Corp. PROJECT NAME 1836 Wildcat Cove Drive PROJECT NUMBER 191273-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 10/7/19 COMPLETED 10/7/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample VAT TIME OF DRILLING 3.42 It LOGGED BY MS/SF CHECKED BY JEK AT END OF.DRILLING -- NOTES See Attached -Location -Plan AFTER DRILLING --- a o z ♦ SPT N VALUE v W >. y w W 20 40 60 80 PL MC LL F---„ 1:0 � Wm _ wo OO z� H� ~� a � W" o- p. �� MATERIAL DESCRIPTION g > 0 O� Z ¢ mOz W U" z o �" ��--I 20 40 60 80 0 �z < W a � ❑ FINES CONTENT{%) 0 20 40 60 80 Brown Sand with Traces of Roots Brown Sand, Slightly Clayed :.. SS 4-6-7 (13) ....... .. ..:.. 6:::• ,.: Brown Sand with Traces of Shell Fragments 8-9-11 > • SS (20) . Grout 5 ti• R ¢ :.d..: SS 11-13-14 :....................... �:�''; •i (27) Brownish Y Y Y SS 6-2-4 .................................... ces of Shell Fragments o;;:: •;: Gray Sand, Slightly SiltywithTraces 10 ,a.. SS 819-24 .... ... (43) ... ;.;• .: Gray Sand, Slightly Silty ' SS 17-28-31 ... (59) ... ... .. ... i : SS 23-34-44 ....... :....... :....... :..... ......... Uj (78) N Bottom of borehole at 14.0 feet. Y_ N O O m rn w J LL C y W 7 K W y to !n N_ m a-i O Q m¢ J N 7 O co Z C7 N H O ' J a x m x U w r O w u h A -c�-- Locations of Soil Borings PROJECT: 1836 Wildcat Cove Drive, Fort Pierce, Florida SHEET 1 OF 1 DRAWN Ze ff ENGINEERING DESIGNDYBY: J.L. J.K. PERMIT $: 1 % &J-,AVLNONE AND TESTING DATE: 08 PROJECTM 191273•b2SCALE: NONE