Loading...
HomeMy WebLinkAboutTermite Spray .., . , ., ► REC EIVED ' APR 6 1A21 Planning &Development Services Permitting G�nartment Building&Code Regulation Division sr. �„�;` Qpar count�, COUNTY 2300 Virginia Ave Fort Pierce,Fl.34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE-TREATMENT CONSTRUCTION SOIL-TREATMENT PERMIT #:Sys 1193`060�30B ADDRESS:l3��7 S. -ridgy ►l�icre� _ BUILDERXONTRACTOR: PEST CONTROL CONTRACT �G- _. Cc..l J-(?_ �,��►,-4� , - PEST CONTROL LICENSE #: :/-; 1`l y-2,0`) z We,the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: - �� Chemicals used: �1/6�SC�°Q-C`►� �`uz . t66 ® Percentage of solution: �� Total gallons used: a Date of Treatment: r�-� Time of Treatment �`P \l Footin ab 71st Treatment ! Treatment Re Treat Re-Treat Driveway Pools 1 Treatment ! Treatment Re-Treat Re-Treat Other Perimeter for Final Inspection l Treatment Re Treat Signature of Exterminator Date Note. Mare mustbe.a completed farm frrr each required fmalment orm-treatment and this form must be i site to be picked up by the inspector at time ofem*inspecu'on or the scheduled inspecuon will fail and a r& fee charged. FBclo4.2.6 G'ertiBcate ofPmterUve Treatment forprevendon oftenmites A weatherrnsWantfobsite past shall be provided to receive dupllzate Treatment Cerocates as each riggUzed protective treatment's comple providing a copy for lire person the permit is Issued to and another copy for the bullding Permit files The Tr CetVflcate shall provide the product used,identity of the applkator,time and date of Me traatmen4 site loce treated chemical used,percent concentration and number ofgallons used, to establish a ven fable record a protective treatment If Me sell dremical banMrmethed for termite preventfon's used,final a0wor freabr be compleeted priorto tirral buildrng approval. St Lucie County requires for the final inspection for CO,a-Permanent Slicker to be plan the electrical panel box cover,listing all the treatments and dates of applications. Revised 7/24/2014 z