Loading...
HomeMy WebLinkAboutField Density Tests of Compacted Soils Methodeder & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 Project: Address: Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Proposed Residence Lot 119, Creekside Date: November 24, 2017 Order #: 17-DR-1158 Area Tested: Building Pad IPermit #: Material Type: Brown Sand with Traces of Rock Tech: SL 3105 Yellowstone Circle, Fort Pierce, FL 34945 Client: D.R.. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: Palm Bay, FL 32907 Proctor Method: I 95% ASTM D-1557 Test # TEST LOCATION ! Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12" FL 10.8 106.9 112.0 10.0 95.4% Yes 2 SW Corner of Pad 12" FL 9.3 107.3 112.0 10.0 95.8% Yes 3 NE Corner of Pad 12" FL 9.7 106.6 112.0 10.0 ' 95.2% Yes 4 I 5 I 6 I 7 8 9 I 10 11 � 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification.of, Soil Bearing Capacity. Legend for Elevation: c i PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:, Q SL = Springline FL = Final Lift Keith LeBlaric�P.E:. SG = Subgrade BG =Below Grade Federal Engiopering4 Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florida<Reg. No. 59394 TOP =Top of Pipe FG =Finished Grade Certfirate of Authorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidertial.property of`clients, and authodzatioi; for publication of statements, conclusions or extracts from or regarding our reports is deserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do'not certify the urdeflyiag soil nteterials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring,tesi'is;required-to"cerift,:i at;4he underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils,; we i2comrnend_61 soil 'borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days o� aPiev hoavy,rain/storms, retesting -must be performed on this work. PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts, from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 L Phone 954-784-2941 ,t., 800-848-1919 Jederl- Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 119,-Creekside Date: November 24, 2017 Address: 3105 Yellowstone Circle, Fort, Pierce; FL 34945 Order #: 17-DR-1158 Area Tested: l§uii n6'Pad I I Permit . Material Type: Brown Sand with Traceslof Rock Tech: SL Client: D.R.. Horton,, Inc. Address: 1430 Culver Drive NE, Compaction Req.: 956/0 Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe De th p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Pad 12", FL 10.8 106.9 112.0 1 10.0. 95.4% Yes 2 JSW Corner of Pad 12" FL 9.3 107.3 112.0 10.0 95.8% Yes, 3 NE Corner of Pad 12" FL 9.7 106.6 112.0 10.0 95.2% Yes 4 5 6 7 8 9 10 11 f 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on;the top IT'of the pad and is not a verification of Soil F3earing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E.` SG = Subgrade BG = Below Grade 'Federal Engineering Tesfing,-inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. Na.­59394 TOP = Top of Pipe FG = Finished Grade Certificate of AiAhorization #►547' As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for.+pubGcation of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test deiennines the degree of.compae'orof the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying•,soll materials h�l .-Jie proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is requlreit-to certify thaf'the,underi" ing soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings-bs performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy raln%storms;. retesting must be performed on this work. PAGE 1 of 2 Compacted Soils Method ®-6936 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a 'compaction test at the -referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been -performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances wi►I void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or. regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 ail DEC 0 � 2017 Phone 954-784-2941 ederal L4 1919 PEt;�^a7i7TjFaG 954-784-7875 Fax 954-784-7875 & TESTING INC. St. Lucie County, FL www.fed-eng.com 250 SW13th Ave Pompano Beach, FL 33059 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence . Lot! 119, Creekside Date: November 24, 2017 Address: 3105 Yellowstone Circle, Fort Pierce, FL 34945 Order #: 17-DR-1158 Area Tested: Building Pad Permit #: Material Type: Brown Sand with Traces of Rock I Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 I Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 I Center of Pad 12" FL 10.8 106.9 112.0 10.0 95.4% Yes 2 SW Corner of Pad 12" FL 9.3 107.3 1 112.0 10.0 95.8% Yes 3 NE Corner of Pad ; 12" FL 9.7 106.6 112.0 10.0 95.2% Yes 4 5 I 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of This is a Compaction Test of Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift St. = Springline FL = Final Lift Additional Information for Disclaimer the top 12" of the pad and is not a verification of S-i8e 'f, ao Submitted by: SG = Subgrade BG = Below Grade Federal Engine$W 8,Test%r,,►1ftYr' Zee ` BC = Basecourse BOF = Bottom of Footing i Florida Reg. No @►; �'�' o TOP =Top of Pipe FG =Finished Grade Certificate of Autt�" �•``` As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and autho o ants, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of r� ¢f t�tl�1 layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials badW $�8,brbposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will supportthe proposed structure without settlement. if no soil borings have tieen performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. Keith PAGE 1 of 2 Compacted. Soils Method. D-6938 Disclaimer Pursuant to your request, Federal Engineering. & Testing, Inc. (FET) has performed a compactiontest at the. referenced project on the reverse side: The purpose of our test was to determine the degree of compaction of -the -tested .layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test -must be performed by the client prior to construction to verify subsoil. conditions. Our scope of services only included testing -the top 12" of added fill material. FET was not: contracted to perform supervision of the building pad: preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to, determine if they are capable .of supporting :the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have .been performed in :the location of the proposed structure,, we recommend performing soil .borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required., we can provide a proposal for performing;an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied.or warranted. Job project specifications were not available at the time the work was. performed. Determination of the-pass/fail compaction results are based on current common industry requirements of 95%:of the ASTM D-1557 standard for buildingfoundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be -notified. Our findings are relative to the date and areas of our site work and should not berelied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and -the site must be re -compacted and re -tested prior -to construction. As a mutual protection to clients, the public and ourselves,all reports are submitted are the. confidential property of clients and authorization for use, publication of _statements, conclusions or.ektracts from or regarding our.reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future: Page 2 of-2 eder"''I' & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 Field Densit Project: Proposed Residence Lc Address: 3105'Yell6wst6 e'Circle, Fort Area Tested: . '.Building -Pad Material Type: Brown Sand with Traces Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Tests of Compacted Soils Method'D-6938 119;•Creekside Date: November 24, 2017 'ierce,'FL 34945 Order #: 17-DR-1158 Permit #: f Rock . Tech: SL Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE ! Compaction Req.: 95.% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % ' Dry Density PCF Proctor Value PCF ;.Optimum Moisture % .. Compaction Pass 1 Center of Pad 12" FL 10.8 106.01. , 1.12.0 10.0 , 95.4% Yes 2 i SW Corner of Pad 12" FL 9.3. 107.3 112.0 10.0 - , 95.8% Yes 3 NE Corner of Pad I 12" FL 9.7 106.6 112.0 10.0 95.2% Yes 4 5 6 8 9 . 10 11 i • � trii 12 13 I 14 ! . KemarKS: See Reverse Side (Page 2 of 2) forjAdditional Information for Disclaimer This is a Compaction Test only on 'the top 12" of the pad and is not a verificatioei ofS iCBearing Capacity. Legend for Elevation: f � PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift _. Keith LeBlanc, P.E. N Z'! SG = Subgrade BG = Below Grade Federal Ettgiree[irtg;& Testing '; -Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. t6. 59394 - TOP = Top of Pipe FG = Finished Grade Certificate -of, cktithorization #5471 Asa mutual protection to clients, the public and ourselves, all reports are submitted as the confidential proliert`y.of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density teat determines, the degree of,corri�sation of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify tiig Underlying soil_ r6ateriais-"6elf ro d st t py The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is Fegi;ireii rertiiy th t ihe-underHs • suppo proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recom,mendjtllefi s�11 borings be d eval a th suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy raiiif t- 's,• retesting e n TIM work. PAGE 1 of 2 Compacted Soils Method ®-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. -In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed, structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing, an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of.95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall.be notified. Our findings are relative to the date and areas of. our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2