HomeMy WebLinkAboutDEWITT Contract10 A. �TAYLui
ROOFING CONTRACTOR
COMPLETE REROOF OF HOME
Project Addreas: 8503 FORT PIERCE BLVD. Pb...
FORT PIERCE, FL. Far:
DiteffyPeCede: NOV. 11, 202020M512 Encid: meakda rant mstoet
J A. Taylor Roofng will provide necessary budding permns, s W.Ic ell me ii etme, anh related m-w1palipad maintain Ct
and Immune. This proposal includes labor, mamruls, and all toes. Our-1'rohssweat technician will bcreby complete the
1. Completely remove existing roofing materials down to shea0dngldeck and prepare as needed to ensure a clean, solid
surface in which to apply a new roof
2. Inspect all sheathing and replace any rotten wood. (Estimate includes up to 3 sheers plywood sheathing replacement at
no charge. for additional lumber replacement costs, see attactad sttceq.
115723hi& Install &D 'ring -shock fasteners to existing sheathing/dock to meet current Building Cade
Requirements.
115723169. .1nstall(Il plyVulkrtdhered" roafmg mrdeNrtymenf(PeN-n-UiA), nPilied diim,14, to sheathing, in
I In Ice I IV, install new rooting accesmries including: drip edge, Bushings, counter-0ashings, plumbing stack
Bushings, 10" Goose Neck Vents for ventilation. and vent fleshings, (Accessories will be fabricated from 26 / 24 Gauge
Galvalume materials)
115723171. Seal all penetrations using approved roofing cement and/or sealants.
115723172. Iretall new mating materiaheatcessones using approved fasteners per code requirements.
115723173. Thoroughly clean project ofall "roofing related debris" and haul away_ (Landfill fees are included)
5V 26GA. WITH THE VISIBLE SCREWS MILL FINISH GALVALUM-59'860.0
1" X 16" STANDING SEAM MILL FINISH GALVALUME---- .00
24 GA. KYNAR 500 PAINT FINISH, STRD. COLORS, ADD------------__S 2,860.00
Any alteration or devimio , form the 56ovc speetfieahons involving additional costs will be executed only upon arinen orders, and will becom
enextra charge overatdabovethe cmimss Replarzmad ofrors to rstmgeJ lumberm nnlipelWdinestimate woispecinal. farmerge t
provide access m building y of artaccess n are made approach
to estimate 0xmfre J t Taylor Roofing u nut nespus, oft for damage er
W., oylside r mtdll my otter access areas I -/d% per
assawoM the u. . Airy client ram is in default in the peymem cemontry due usurer
W., of this for collection,
be charged at she toe of I 'fe % per month on collection
balance, IMoimum plus
oil ve nby , eow). ed ett diem a referred
to an ananry for uponcrion, diem egrus m no, all fees incurred in the sallmoor with anoint duo plus ell cum ewes vd aaomry heel Work
will beards aoled upon written accepuuass of this proposed!gis, This proposal mar be withdrawn Ran Vs ial depending
within 60 days. *All m jar
credit used
attepred. Iwwcver an uldisiowl pr«essing he of up m 5 o will he assessed to ewuma total depending on wnenr monthly rote and
card ttutl.
Date:
For fuller assistance please contact I.A. Taylor Roofing 772-466-0040 or fax to 772-468-83V
Think you for the opportunity to bid your prowl
•'••'•"" Serving the Treasure Coast for over 55 Yea. •"•'"•••"
Respectfully Submitted by- JACK HILL 777e370-9012�'
302 Melton Drive Fort Pierce, FL 34982 Tel. 772.466.4040 Fax 772,468,8397
REPAIRS, RE -ROOFS, NEW COMMERCIAL & RESIDENTIAL ROOFING CONTRACTORS
SERVING FLORIDA SINCE 1965