HomeMy WebLinkAboutsunrise permitSection A (General Information)
Master Permit No.
Process No.
Contractors Name: wy I f License# CCC 13�09_
Job Address 3a
* Low Slope
❑ Asphaltic Shingles
❑ New roof ❑ Repair
Low Slope Roof Area (SF) _
ROOF CATEGORY
❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles
etal Panel/Shingles ❑Wood Shingles/Shakes
s❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE_
❑ Maintenance Reroofing ❑ Recovering
ROOF SYSTEM INFORMATION®�
Steep Sloped Roof Area (SF) _ I ton Total (SF)
Section B (Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets.
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA'
System Manufacturer: as
tlutProduct Approval No.:�. e?
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1':one 1: Zone 2--L—Zone 3
q�t
Max. Design Pressure, from the specific product approval
system:
Deck:
Type:
Gauge Thickness: 131,
Slope: _
Anchor/Base Sheet & No. df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base Layer:
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheets & No. of Ply(s):
Base Sheet Fastener/Bonding Material:
Ply Sheet(s)' & No, of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply:
Top Ply Fastener/Bonding Material:
Surfacing:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':—"
oc @ Lap, # Rows
@ "oo
Zone 1:—"
oc @ Lap, # Rows
@ "oo
Zone 2:—"
oc @ Lap, # Rows
@ "oo
Zone 3:—"
oc @ Lap, # Rows
0 "ao
Number of Fasteners Per Insulation Board:
Zone 1': Zone 1: Zone 2: Zone 3
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing, Coping, Etc.,
Indicate: Mean Roof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Details that
Comply with RAS 111 and Chapter 16..
Section D (Steep Slope Roof System)
Roof System Manufacturer:
Notice of Acceptance Number:
Minimum Design Wind P es ures, If A=zone
le (From�R+�127 or Cal ions): ��/
.Zone 1' Zone 2e2► ,. Zone 2 CA
Zone 3e: "'�� Zone 3r:
Deck Type:
Type Ur
Roo lope:
12 Ins
Ridge Ventilation?
Mean Roof Height:
Fire Barrier:
Fastener Type & Spacing: I - V H , V1 (,(� �•
Adhesive Type:
Type Cap Sheet: �= I
Roof Covering: Lk��
Type & Size Drip �-
Edge: OV%
Building Sequence:
1
Bedrooms:
2
Bathrooms:
1
Building Type:
HD -
Story Height:
1 Story
No of Living Units:
1
Total Finished Area:
1,070
Gross Sketched Area:
1,848
Year Built:
1940
Effective Year:
1965
Primary Roof Cover:
Fibrglss Shg
Primary Roof
Hip
Structure:
Primary Wall:
Abs Shingle
A/C %:
0
Building Sequence:
2
Bedrooms:
0
Bathrooms:
0
Building Type:
DGAR - Detached Garage
Story Height-
1 Story
No of Living Units:
Total Finished Area:
0
Gross Sketched Area:
400
Year Built:
1940
Effective Year:
1965
Primary Roof Cover:
Dim Shingle
Primary Roof
Hip
Structure:
Primary Wall:
Abs Shingle
A/C %:
Building Sketches
Sub Area
Building Sequence
Sketch Area Code
Description
Finished Area
Gross Area
1
SPAA
Screen Porch Attached Average
0
298
1
PATA
Patio Average (Plain Slab)
0
180
1
CPAA
Carport Attached Average
0
300
1
BAS
BASE AREA
1,070
1,070
2
GDA
Garage Detached Average
0
400