HomeMy WebLinkAboutAPPROVED Roofing Package ST. LUCIE WORKS
Section A (General Information)
Master Permit No. Process No.
Contractors Name: ��9d15Lx ��i9�s _License#
Job Address 57V yi'a✓ele
ROOF CATEGORY
/EY'Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
,O�Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE.
❑ New roof ❑ Repair 0 Maintenance EIIR�eroofing ❑Recovering
ROOF SYSTEM INFORMATION
Low Slope Roof Area (SF) 3 Steep Sloped Roof Area (SF) 113 y Total(SF) Z 1
Section B(Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
i
ST. LUCIE WORKS
Section C (Low Slope Roof) Surfacing:
Sql 64zJ
Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment:
manufacturer Zone 1': D " oc @ Lap, # Rows--3—@ g"oc
(If a component is not used,identify as"NA") Zone 1:—L" oc @ Lap, # Rows--L @ 00
System Manufacturer:T �+y� Zone 2: b " oc @ Lap,# Rows-a �' "oo
p Zone 3:�" oc @Lap,# Rowse® y "ac
Product Approval No.: � ! ' 19 I
Number of Fasteners Per Insulation Board:
Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2: Zone 3:
Zone 1':•S7 Zone 1: .(� Zone 2:"S� Zone 3: 1/7 Illustrate Components Noted and Details as Applicable:
Max. Design Pressure, from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping,
system: Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing, Coping, Etc..
Deck: I Indicate: Mean Roof Height, Parapet Height, Height of Base
TYPE:—e!q'jev.j Flashing„Component Material, Material'Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Detailsthat
Gauge Thickness: ? 3 2-- Comply with RAS 111 and Chapter 16..
Slope: L> {Z
Anchor/Base Sheet& No.df Ply(s): E I,S b'6-4+L I rk
Anchor/Base Sheet Fastener/Bonding Material: FT.
1�q" �5 w/ 7rw 74�
Insulation Base Layer:
Base lnsultation Size and Thickness: Parapet
Base Insulation Fastener/Bonding Material: Height
�11sk FIB t,4
Top Insulation Layer:
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Material: ti e (.Re, bh SL
Mean
Base Sheet(s)&No.of Ply(s): Roof
Base Sheet Fastener/Bonding Material: 4 k Z Height
Ply Sheet(s)' & No.of Ply(s):
Ply Sheet Fastener/Bonding aterial- 11 fte4rt -
3x
Top Ply: E/01ib C/CX S
Top Ply Fastener/Bonding Material:
.-
ST. LUCIE WORKS
Section D (Steep Slope Roof System)Roof System Manufacturer: [1"9 Jr 1M�jel f iALD L�7
_
Notice of Acceptance Number: 11-
o34?OV1
Minimum Design Wind Pressures, If Applicable(From RAS 127 or Calculations):
19
Zone 1:�Zone 2e:�Zone 2nrL Zone 2r:1QS—Zone 3e: `/'9 Zane 3r: f 2
Deck Type:
Type Underlayment: 3 o re, f
Roof Slope:
12]
• Insulation:
Fire Barrier:
Ridge Ventilation? Fastener Type &Spacing:
Adhesive Type:
Type Cap Sheet: for v•►� Z.
Mean Roof Height: Z Roof Covering:
Type&Size Drip
Edge:
I