Loading...
HomeMy WebLinkAboutAPPROVED Roofing Package ST. LUCIE WORKS Section A (General Information) Master Permit No. Process No. Contractors Name: ��9d15Lx ��i9�s _License# Job Address 57V yi'a✓ele ROOF CATEGORY /EY'Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles ,O�Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair 0 Maintenance EIIR�eroofing ❑Recovering ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) 3 Steep Sloped Roof Area (SF) 113 y Total(SF) Z 1 Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. i ST. LUCIE WORKS Section C (Low Slope Roof) Surfacing: Sql 64zJ Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment: manufacturer Zone 1': D " oc @ Lap, # Rows--3—@ g"oc (If a component is not used,identify as"NA") Zone 1:—L" oc @ Lap, # Rows--L @ 00 System Manufacturer:T �+y� Zone 2: b " oc @ Lap,# Rows-a �' "oo p Zone 3:�" oc @Lap,# Rowse® y "ac Product Approval No.: � ! ' 19 I Number of Fasteners Per Insulation Board: Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2: Zone 3: Zone 1':•S7 Zone 1: .(� Zone 2:"S� Zone 3: 1/7 Illustrate Components Noted and Details as Applicable: Max. Design Pressure, from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping, system: Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc.. Deck: I Indicate: Mean Roof Height, Parapet Height, Height of Base TYPE:—e!q'jev.j Flashing„Component Material, Material'Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Detailsthat Gauge Thickness: ? 3 2-- Comply with RAS 111 and Chapter 16.. Slope: L> {Z Anchor/Base Sheet& No.df Ply(s): E I,S b'6-4+L I rk Anchor/Base Sheet Fastener/Bonding Material: FT. 1�q" �5 w/ 7rw 74� Insulation Base Layer: Base lnsultation Size and Thickness: Parapet Base Insulation Fastener/Bonding Material: Height �11sk FIB t,4 Top Insulation Layer: Top Insulation Size and Thickness: FT. Top Insulation Fastener/Bonding Material: ti e (.Re, bh SL Mean Base Sheet(s)&No.of Ply(s): Roof Base Sheet Fastener/Bonding Material: 4 k Z Height Ply Sheet(s)' & No.of Ply(s): Ply Sheet Fastener/Bonding aterial- 11 fte4rt - 3x Top Ply: E/01ib C/CX S Top Ply Fastener/Bonding Material: .- ST. LUCIE WORKS Section D (Steep Slope Roof System)Roof System Manufacturer: [1"9 Jr 1M�jel f iALD L�7 _ Notice of Acceptance Number: 11- o34?OV1 Minimum Design Wind Pressures, If Applicable(From RAS 127 or Calculations): 19 Zone 1:�Zone 2e:�Zone 2nrL Zone 2r:1QS—Zone 3e: `/'9 Zane 3r: f 2 Deck Type: Type Underlayment: 3 o re, f Roof Slope: 12] • Insulation: Fire Barrier: Ridge Ventilation? Fastener Type &Spacing: Adhesive Type: Type Cap Sheet: for v•►� Z. Mean Roof Height: Z Roof Covering: Type&Size Drip Edge: I