HomeMy WebLinkAbouttermite spray (2)'Pp, "M
COUNTY
F L O R I D A�"'
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772462=2172 Fax 772462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT # : c�ADDRESS:) y Q rrn�na r� 1
BUILDER/CONTRACTOR:
PEST CONTROL CONTRA(
PEST CONTROL LICENSE
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used: "WAIVII of La
G
Percentage of solution: off
Date of Treatment: '� ' JS �,
Footing
ist Treatment
Re -Treat
,Driveway
1St Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Total gallons used:
Time of Treatment: � � ���
Slab
1't Treatment
Re -Treat
Pools
.1st
Treatment
Re -Treat
Perimeter for Final Inspection
n
Signature of Exter
Date
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the schedu/ed inspection wi/l fail and a re -inspection
Fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board
sha/l be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shall pro vide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Kevised 7/24/2014