HomeMy WebLinkAboutJENKINS contract\ l-, "e, A
1. CompleMy mmorc existing roofing Materials duvet to sheathing/deek and prepare sa needodm ensare a clean, solid
surface in which to apply a new roof.
2. Inspect all shedding and replace my rotten wood. (Eertnte, includes up to 3 sheen plywood situation, replacemeat w no
charge, for additional lombm replacement com, am amool ed sham)
3. Install &B "ring-sbarJ." fasteners m mining aheatNng/deck to meet current Building Cite Roquimmmts.
4. lumill (1) ply 030lb, ronfing felt over sheathing, and nachadmlly fasten using appwM faa4nem per wwde
whod,s atialdeeopelu shdawmupgiadeto OCWEdTHEshorm. JvlldvdAeM" fnY urdeAvymem lPrel-n-
nlfekf,applieddirectly ev,,a Urhlrrg,ih,,brJar. Lr dry-ild mole Meear lnsumnre'NSnd-Mdieatbn"
,mrimmaw fm.swa seconenrv-warms-hn.eler rorswnele roornoaorenon<L
5. Install new rooting atte.niea including: ddp edge, flashm ,comet,lashings, pI.b,., stack flusbings,von,
❑oodinge, and valley meal. (Accessint. will be butrieared from 26 Gauge Galvalume materiels.)
6, seal all pentagons using approved mnfmg remwt andtm authors. Drip edge White orBrovm for shingles.
7. (mW [ new roofing materiasl=reaories using approved holiness per cord, requirements,
B. Thoroughly 6. pmj. ofaii 4 fins relaed debris" and haul away. (Landfill fees ere galudsop
Install Arehheetanl Shingles Uifetime Warranty/130 mph) S 7,860.00
"Upgrade to UC Wealherlock G Uuderlayment, Additional
rant mad
Weer spxifM Cu onicr mum
t respmtible he damage to
v prymam Nmorey due order
W I—) if an, in. in refereed
Coate.,. IhW. L/ -/,I
For fuNwr usialenrepease contact dA Taylor Boosting M46(S-4040 or in M M-46&8392
Thank you forth, opponaldry to bid yompmfvx!
orrrrr rr Swing the"assure Caaal for "Yon rr
r Banectfufy Submitted by, JACK W J. Y 70-9012