Loading...
HomeMy WebLinkAboutCertificate of Termite Treatmentr St Lucie County Inspections. 2300 Virginia Avenue 1[+ t• Pierce, FL 349.82 ! - - (772) 462-2172 APR I I Z006 CERTIFICATE OF TERMITE TREA' CONSTRUCTION SOIL TREATMENT PERlYTTT Il `ASS WI3WRESS �G"7 _ r BUILD R & 'F Pest' Contro��:, Inc PEST CONTROLCONTRACTOR1656 SW BayshQre, B1 v Port St Lucie, FL 34984 PEST CONTROL LICENSE 4L_ a O We, the unclersit;neci, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: Ar Percentage of solution: Date of treatment: ❑ rooting ❑ 1st Treatment ❑ Re -treat ' Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat Chemicals used:. exT e / Total gallons used: Time of Treatment: /off ,o C-/ FBC104.2.0 Certificate of Protective Treal►neni for prevention of termites. A weather resistant jobsite posting board shall be provided to receive dnplicate Treatment Certificates. as each regttired prorective treaunent Is completed, providing a copy for the person the pern►ll Is issued to and another copy for the building permit files, Tl►e Treatment Certificate sliall provide /lie product used, identity 'of ilia applicator, tune and date of the treatmew, site location, area treated, chemical used, percent concentration and nionber of gallons used, to evablish a verifiable record of protecilve treran,llaw., If ilia soil chemical barrier method for termite prevention is used, final exlerior• irealrnent shall be completed prior to final buildins approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be Placed on the electrical panel box cover, listing all the treatments and, dates of appliea'iions. ❑ Other ❑ tst Treatment ❑ 'P�e-t7'eal � C C1 Perimeter -for Final Inspection SigAnture of exterminator NOTE - There lutist be a completed. form for each regttired treatment or re -treatment mid this forth ninst he oil the job site to be picked lip by the inspector at tune of each inspection or the scheduled insimclioll 1Nill fail and a re-inspe.etion fee charged.