Loading...
HomeMy WebLinkAboutCreekside Lot 49-Strapping[BUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: IV —14 — a/ Project: (24"ILStz Address: 3 2 IF 2_ % 2r ti 'f 4 Check one: Regular Inspection: ❑ Reinspection Permit No. Zo // , o 7 5— Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural IVI Service/Ground I I Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results: I (AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: Iry/e u—T/+s e s -, ,e dR-o%ter 1. 2. 3. 4. 5. 6. 7. Inspector's Name: &� Lic.#: /9A-) 4z, S 8 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 - (772) 924-3580 (fax) www.teamgfa.com