HomeMy WebLinkAboutCOMPACTION TEST-#1329- MartireDe eral Phone:954-784.2941
E-Fax: 954-784-7875
admin
engineering
��' Inc.www.fed-eng.com
com
@vestin1 n
Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence - George Martire Date: April 5, 2021
Address: 10210 Calton Road , Fort Pierce, FL 34987 Order #: 21 CMT1058
Area Tested: Building Pad Permit #:
Material Type: Pale Brown Sand with Traces of Rock Tech: GD
Company: Groza Builders, Inc.
Address: 1332 SW Biltmore Street
Port St. Lucie, FL 34983
Compaction Req.: _
Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
"�o
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Corner of Pad
12"
FL
8.7
104.8
108.0
10.0
97.0%
Yes
2
Center of Pad
12"
FL
6.2
106.2
108.0
10.0
98.3%
Yes
3
SW Corner of Pad
12"
FL
5.9
103.7
108.0
10.0
96.0%
Yes
4
SE Corner of Pad
12"
FL
6.6
104.1
108.0
10.0
96.4%
Yes
5
6
7
8
9
10
11
12
13
14
.`�tltlt tOHNf
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer ��` �, ,.••"""' '���
This is a Compaction Test only on the top 12" of the pad/footing and is not a verification qfSofi.Searing Cap Qity.W_
O- 59394 :•
Legend for Elevation:
PR = Proofroll 1,43 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift Keith LeBlanc, P.E ,P'•,
SG = Subgrade BG = Below Grade Federal Engineering' I W
BC = Basecourse BOF =Bottom of Footing Florida Reg. No. 59394,E �S'S ' NG\C�\.
TOP = Top of Pipe FG = Finished Grade Certificate of AuthorizatioNt��NAL
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for pu{ili�%fbl#istatements,.
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do
not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
without settlement. if no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
Compacted Soils Method 0-6938 Disclaimer
Pursuant to your request, Federal Engineering & testing, Inc. (FE1) has performed a compaction test at the referenced project
on the reverse side I he purpose of our test was to determine the degree of compaction of the tested layer of material only. In
no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client
prior to cc istruc ,en to verify subsoil col�dificns- Ocr scope ol s,,viccs only incluu ed tu„irig the lop 12' of added fill material.
FL=T was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not
include an analysis of the underlying soil rnaterials to determine if they are capable of supporting the proposed structure
without settlement This density compaction test does not warranty any underlying soil materials or conditions below the
tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we
recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil
conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we: can provide a proposal for performing an environmental analysis of the soil niatorials. The scope of services is for
determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the lime the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASt M D-1557 standard for building foundations and
98% of the AASH1O T-180 standard for paved areas such as roadways and parking lots. If different specifications arc:
required, Federal Engineering & Testing, Inc. shall be. notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates, Any subsequent site disturbances due to water erosion, rain waters. construction activities, utility or footing
excavations. overgrown vegetation, traffic and other disturbances will void this test and the site rnusi be re -compacted and re-
tested prior to construction
As a mutual protection to clients, the public and owselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts fiom or regarding our reports is reserved pending
our v✓i Ren approval.
It has been a pleasure working with you and we look forward to doing so in the near future
Page 2 of 2
OQ ederal
. ngineering
®Oesting, Inc.
DATE SAMPLED: 4/5/2021
CLIENT: Groza Builders, Inc.
ADDRESS: 1332 SW Biltmore Street
Port St. Lucie, FL 34983
Phone: 954.784.2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-eng.com
PROCTOR COMPACTION TEST
DATE TESTED: 4/6/2021 SAMPLE #:
21CMT1058
PROJECT: Proposed Residence - George Martire
LOCATION: 10210 Calton Road , Fort Pierce, FL 34987
SAMPLED FROM: Building Pad MATERIAL #: N/A
MATERIAL DESCRIPTION: Pale Brown Sand with Traces of Rock
SAMPLED BY: GD TESTED BY: SJ TIN #: J32378081-000
SPECIFICATION GOVERNING: ASTM D-1557 LAB NO: 104035
RESULTS OF TEST:
The following compaction test was conducted in accordance with the Standard Methods of Moisture Density Relations of soil using a 10 lb. Hammer and an
18" drop as per the above specified method.
MOISTURE % WET DENSITY (PCF) DRY DENSITY (PCF)
7.8 113.2 105.0
9.2 117.5 107.6
10.6 119.1 107.7
12.1 117.4 104.7
108.5
108.0 —
107.5
U
U
d 107.0
T
a
'7A 106.5
c
v
106.0
105.5
105.0 1
104.5 I
7
8 9 10 11 12 13
Moisture (%)
Optimum Moisture (Percentage)
10.0 %
Maximum Dry Density (lbs./cu. Ft.)
108.0 PCF
Respectfully
GEN§
Keith LeBlanc, P.E.
Federal En&j*'r.,ing§T#Atiq
Florida Reg.tjOimCertific69
lRnIDP•'CC"���.`
PCdJ5A4'1
3i0.NE5th Avenue I Oakland Park Florida 33334
nm •v.
CMEC •
FDOT�i
OQ ederal
Wengineering
esting, Inc.
Phone:954.784-2941
E-Fax: 954.784.7875
admin@fed-eng.com
www.fed-eng.com
Organic Content Test (AASHTO T-267)
Date: Monday, April 5, 2021
Groza Builders, Inc.
1332 SW Biltrnore Street
Port St. Lucie, FL 34983
RE: Geotechnical Services
Job Order Number 21 CMT 1058
Proposed Residence - George Martire
10210 Calton Road
Fort Pierce, FL 34987
Location: Building Pad
Sampled By:
GD
Sample Description
RESULT OF TESTS
Reported To: Client
Pale Brown Sand with Traces of Rock
Crucible
Crucible Weight
Crucible Weight
Organic
Weight
+ Material
+ Material
Content
(grams)
Before Burn
After Burn
(% by Weight)
(grams)
(grams)
22.4
109.2
108.5
0.81
Tested By: SJ (TIN # J32378081-000)
Checked By: KL
`r�rrunun'�u�i
Respectfully S r�l N L39
£
Keith Ler5mrre, P.E.
Federal Enginegring &Nesting hic c
Florida Re t;onT�'�J�3904F
a
Certificate of-
3370 NE 5th
Avenue Oakland Park Flodde 33334
CMEC
•MIAMIDMADE
CWMT
�
Oederal
Ongineering
®Oesting, Inc
Phone: 954.784.2941
E-Fax: 954.784-7875
admin@fed-eng.com
www.fed-eng.com
..
No. 200 Wash Sieve Analysis
Date: Monday, April 5, 2021
Groza Builders, Inc.
1332 SW Biltmore Street
Port St. Lucie, FL 34983
RE: Geotechnical Services
Job Order Number 21 CMT1058
Proposed Residence - George Martire
10210 Calton Road
Fort Pierce, FL 34987
Location: Building Pad
Sampled By:
GD
RESULT OF TESTS
Reported To: Client
Sample Description: Pale Brown Sand with Traces of Rock
Weight: 371.90 g
Sieve Size
Cumulative Wt.
Retained (g)
Cumulative %
Passing
Cumulative %
Retained
#200
347.40
6.6%
93.4%
Pan
----
Tested By: SJ (TIN # J3237808 1 -000)
Checked By: KL
Keith LeBlanc
Federal Enginwring & nc.
Florida Registra3i # 5
V l)I -I
Certificate of AUQ t'leR
IC : ® ®' FDM
�" .�`� AnD:ovM lgpo:alory
Subsoil Investigation Report
prepared by:
deral
sneering
sting, Inc.
Client: George Martire
Contact: George Martire
Address: 1711 SE Carvallio Street
Port St. Lucie, FL 34983
Project: Proposed Residence
Address: 10210 Carlton Road
Fort Pierce, FL 34987
Date: Friday, July 10, 2020
Phon
: 954-784-2941
O raI E-Fax:e 954-784-7875
Onglneering admin@fed-eng.com
www.fed-eng.com
esting, Inc. V1W1ukVNjMvE13Vr1: -:
Table of Contents
Client Information----------------------------------------------------------------------- pg. 1
Project Information---------------------------------------------------------------------- pg. I
General Soil Descriptions-------------------------------------------------------------- pg. 1
Foundation Recommendations--------------------------------------------------------- pg. 2
Soil Parameters -------------------------------------------------------------------------
yg. 3
Excavations
pg. 3
Settlement ---------------------------------------------------------------------------------
yg. 4
Grading----------------------------------------------------------------------------------- 4
pg.
Appendices--------------------------------------------------------------------------------- 5
pg.
Soil Boring Log(s)
Project Location
Soil Boring Location(s)
Soil Classifications
Sampling Procedures
Limitations of Liability
For Your Information
Our findings in this report are based on soil conditions encountered in the test bore locations only, proposed structure to
be built, (if available at this stage), Florida Building Code requirements and standard engineering practices. If your report
is preliminary (i.e. vacant land or building to be demolished) additional borings are required within the foot print of the
proposed stnucture once the location & layout of the proposed structure is known.
Please read this report in its entirety and follow all recommendations. Failure to do so may result in the permitting
agency (Building Department, etc.) withholding the Certificate of Occupancy, This will cause delays and additional
costs. The Permitting Agency will require a final certification or signing off of the project prior to issuing the Certificate
of Occupancy. All of our recommendations need to be followed to receive a final certification from F.E.T., including
densities on each lift, dens ickinng verification, piling inspection, etc., whichever recommendation applies to your project.
Please schedule us at least 24 hours in advance for all tests and inspections. If you choose to use another Engineering
Finn, you must verify they will provide you with the proper certification in writing, as outlined in our report. Our firm
will only provide a certification letter if it has verified all work as recommended in our report.
MINNIMEMINERUMM577 77755MARTItrAvbhyei I Oak Iand P*k,,F1oddw333 1; -
Oederal
OQ ngineering
xP esting, Inc.
Friday, July 10, 2020
George Martire
1711 SE Carvalho Street
Port St. Lucie, FL 34983
Attn.: George Martire
RE: Subsoil Investigation
Proposed Residence
10210 Carlton Road
Fort Pierce, FL 34987
Dear Sirs:
Phone:954.784.2941
E-Fax: 954.784.7875
admin@fed-eng.com
www.fed-eng.com
Job Order Number 20SB537
Pursuant to your request, Federal Engineering & Testing, Inc. has completed a subsoil investigation on 07-09-2020 at the
above referenced site. The purpose of our investigation was to verify subsoil conditions relative to foundation
preparation and design.
A total of two (2) DCP borings were performed according to ASTM D-6951 drilled down to a depth of fifteen feet (15)
below the existing ground surface. (See attached field sketch for locations). The following is a general description of soil
stratas for the subject site:
Depth
From To
Description of Soils
0"
6"
Topsoil & Vegetation
6"
3'
Brown Sand
3'
8'6"
Orange Sand
816"
15,
Pale Gray Sand
Groundwater table elevation was treasured immediately at the completion of each boring and was found at an average
depth of five (5) feet below existing ground surface. Fluctuation in water level should be anticipated due to seasonal
variations and run off as well as varying ground elevation, construction dewatering and pumping activities in the area.
Site contractor trust familiarize himself with site conditions in the event groundwater controls and dewatering is needed.
Surface flooding may result under hurricane conditions and should be taken into consideration in the design of the
project. The contractor shall make sure that groundwater levels on adjacent properties are not affected by the contractors
dewatering activities. Specialty groundwater contractors shall be consulted for all work below the groundwater level.
Friday, July 10, 2020
10210 Carlton Road
Fort Pierce, FL 34987
Page 2
i'�©�91neer
eder l
& esting, Inc.
The boring log(s) attached present a detailed description of the soils encountered at each location. The soil stratification
shown on the boring log(s) is based on the examination of the recovered soil samples and interpretation of the driller's
field log(s). It indicates only the approximate boundaries between soil types. The actual transitions between adjacent
soil types may be gradual.
From a geotechnical engineering perspective, the site is suitable for the construction of the proposed structure, provided
that the surface sand layers are compacted in place and proof rolled. Localized areas of loose materials, if present, will
become evident during site clearing, grubbing and proof rolling, and must be removed prior to filling operations.
Based on our understanding of the proposed structure and the information obtained from our field boring log(s); we
recommend the following procedures for foundation design:
1) Strip the entire footings and building construction areas plus five (5) feet past the outer perimeter of topsoil and
ground vegetation (when encountered) down to clean granular material. Any underground structures, utility
lines, root systems and drainage trenches, etc. must be removed in their entirety from beneath the proposed
construction areas. The city arborists should be contacted prior to any land clearing to verify compliance with
any local codes.
2) Saturate and compact all construction areas with a heavy self propelled vibratory roller to a minimum of 95% of
the ASTM D-1557 modified proctor method. Make a minimum of ten (10) passes with the roller in each
direction.
3) Care should be taken when using vibration in case of existing structures in the vicinity of the construction area.
If vibration cannot be used for compaction, static compaction may be applied. However, in this case, the
compacted layer should not exceed 6 inches in thickness.
4) Backfill construction areas to proper elevation if needed using a clean granular material placed in lifts not to
exceed twelve (12) inches in thickness and compacted as per item 2.
5) Representative samples of the on -site and proposed fill material should be collected and tested to determine the
classification and compaction characteristics.
6) All construction fill material above the water table shall be clean granular soil, free of organics or other
deleterious material, and shall contain no more than twelve (12) percent fines passing a U.S. Standard No. 200
sieve (0.075mm) and have a Unified Soil Classification (USCS) designation of GP, OW, GP -GM, GW-GM, SP
or SW. No particle size greater than three (3) inches shall be used in the lop 12 inches of the building pad.
7) Fill Material below the water table shall be washed free draining gravel such as FDOT No. 57 stone or
equivalent to about 12 inches above the water table unless dewalering is used. When dewatering is used, fill
material shall be clean granular soil, free of organics or other deleterious material, and shall contain no more
than twelve (12) percent fines passing a U.S. Standard No. 200 sieve (0.075mm).
Friday, July 10, 2020
10210 Carlton Road
Fort Pierce, FL 34987
Page 3
�gineer
© wide l
�esting, Inc.
8) Verify all densification procedures by taking an adequate number of field density tests in each layer of
compacted material. Density tests shall be performed on the slab areas, footing areas, interior bearing wall
footings and column pad footings. This must be scheduled immediately after Tamp and Spray and/or
Compaction, but before Reinforcing Steel Placement. If reinforcing steel is already in -place, it must be removed
from all areas to be tested prior to performing densities.
9) After the installation of any plumbing and electrical piping; we recommend that the disturbed area be
recompacted and additional densities tests be performed to verify proper compaction of the disturbed areas.
10) All of the above Geotechnical work shall be performed under the supervision of Federal Engineering &
Testing's geotechnical engineer or his representative to verify compliance with our specifications and the
Florida Building Code. Please call us at 954-784-2941 for scheduling.
11) In the event of existing structures, existing footings or proposed drainage lines, provisions shall be made by the
structural engineer and site contractor to protect all footings from undennining and exposure. The geoteclnnieal
engineer shall be notified of these conditions to evaluate the applicability of his recommendations.
The above foundation recommendations being achieved and verified; it is our opinion that the proposed structure be
designed for a shallow foundation system with a pennnissible soil bearing pressure not to exceed 2500 P.S.F. Building
pad certification requires satisfactory completion and verification of all the above foundation recommendations.
Slabs placed upon compacted fill may be designed using a modulus of subgrade reaction value of 200 pci. The following
soil parameters shall be used for retaining wall designs:
• Soil unit weight moist------------------------------------------------------------------------- 110 pcf
• Soil unit weight buoyant ------------------------------------------------------------------------ 48 pcf
• Angle of internal friction ----------------------------------------------------------------------- 300
• Active Earth pressure coefficient(Ka) ------------------------------------------------------ 0.33
• Passive Earth pressure coefficient(Kp)----------------------------------------------------- 3.0
• Angle of wall friction for steel piles --------------------------------------------------------- 300
• Angle of wall friction for concrete / brick walls -------------------------------------- -.... 20e
• Angle of wall friction for uncoated steel ---------------------------------------------------- 15e
Excavations shall not extend within one (1) foot of the angle of repose next to existing footings or structures unless
underpinned. Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety Act
requirements. Shorings shall be designed and inspected by a Florida licensed professional engineer.
Provisions shall be made by the architect, engineer of record and contractor to address differential settlements when
tying in new to existing structures. Mixing of different foundation types shall not be used unless provided with
expansion joints to address differential settlement.
Friday, July 10, 2020
10210 Carlton Road
Fort Pierce, FL 34987
Page 4
Aederal
gineering
esting, Inc.
Detailed settlement analysis was beyond the scope of this report. Comparing the field test data obtained in this
exploration with our experience with structures similar to those proposed for this project, the estimated magnitude of
these settlements is 0.5 to 1 inch. Due to the granular nature of the subsurface materials, the foundation settlements
should occur as the loads are applied and should be virtually negligible by the end of the building shell completion.
All outside ground surfaces must be sloped away from the structure to avoid water accumulation and ponding. All rain
waters shall be discharged away from all building foundations. Verify all water, sewer, plumbing, sprinkler and drainage
lines are properly functioning with no leaks in the vicinity of the foundation.
Regardless of the thoroughness of a geotechnical exploration, there is always the possibility that conditions may be
different from those of the test locations; therefore, Federal Engineering & Testing, Inc. does not guarantee any subsoil
condition between the bore test holes. A site plan showing the location of the proposed structure was not provided at the
time the soil borings were performed. Once plans and specifications have been finalized and drawn, Federal Engineering
& Testing, Inc. shall be provided a copy of the finalized plans and specifications for review. For a more accurate
portrayal of subsurface conditions, the site contractor should perform test pits. If different conditions are encountered,
Federal Engineering & Testing Inc., shall be notified to review the findings and make any recommendations as needed.
In accepting this report the client understands that all data from the soil borings is intended for foundation analysis only
and is not to be used for excavating, backfilling or pricing estimates. The site contractor must familiarize themselves
with the job site conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. For Environmental
due diligence, a Phase I and/or Phase 11 Environmental Site Assessment is recommended.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of
clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
Federal Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of your project.
Please feel free to contact us if we may be of further service to you,
Sincerely,
Keith LeBlanc, P.13,- 4 t n
Federal EngineerirlgV1Test�ng, Inc. t -
Florida Reg. No. 594\ ArEOp
Certificate of AuthoYla6o�ji��7
{///+'Aft
Friday, July 10, 2020
10210 Carlton Road
Fort Pierce, FL 34987
Page 5
Appendices
®�ederal
Q gineering
8� esting, Inc.
�1 •y�ederal Phone:954-784-2941
\�/ E-Fax: 954-784.7875
Q ngineering admin@fed-eng.com
www.fed-eng.com
DOesting, Inc. __. : •:
Test Boring Report
Client: George Martire Date of Test: July 9, 2020
Project: Proposed Residence Hole No.: B-1
Address: 10210 Carlton Road Location: See Attached Drawing
Fort Pierce, FL 34987
Depth (FT)
Soil Descriptions
Hammer Blows
"N"
1
0" - 6" Topsoil & Vegetation
5 5
2
6" - 3' Brown Sand
4 3
9
3
3 4
10
4
3'- 8'6" Orange Sand
6 6
5
7 g
16
6
8 7
7
6 8
16
8
8 9
9
9 10
20
10
8'6" - 15' Pale Gray Sand
10 9
11
8
17
9
13
10 11
22
14
11 10
15
9 9
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Water Level: 5'0" Below Land Surface
Oederal
engineering
xPOesting, Inc.
Test Boring Report
Client: George Martire
Project: Proposed Residence
Address: 10210 Carlton Road
Fort Pierce, FL 34987
Phone:954.784.2941
E-Fax: 954.784.7875
admin@fed-eng.com
www.fed-eng.com
Date of Test: July 9, 2020
Hole No.: B-2
Location: See Attached Drawing
Depth (FT)
Sol] Descriptions
Hammer Blows
"N"
1
0" - 6" Topsoil & Vegetation
5 5
3
6" - 4'6" Orange Sand
4
9
4
4
4'6" - 8' Pale Grayish Orange Sand
6 6
10
5
7 10
18
6
8 8
7
8 7
8
7 6
14
9
8 8
10
8'- 15' Pale Gray Sand
10 11
18
11
I 1 10
20
12
]0 12
13
II 11
14
10 10
21
15
9 10
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Water Level: 511" Below Land Surface
� � t � ,�31 1, � r �i S •:�
� � � �. �r t�t�{' i.l �Vi'�till Mitt �fi i+•,A
4 t
1 �
'( JJ 11 t{�tZ. 1fPl•` �t�ll��+ }� i� 511 � i �' ''I � i ;1' ' '
1� I {� i 1�� � , �� t }., 1•
t,32 t,
li44 + t t Ir�l
t{d ttl
�;L t�� ft � Site Location '" 1.
1�
SiJ �l'• r j1 �I
a
1 PJim
y � ,
el a ! `4`�
© ederal
.,ngineering
& Vesting, Inc.
Soil Classifications
Correlation of Penetration Resistance with Relative Density and Consistency
Sands
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hammer Blows
Relative Density
0 - 10
0-4
Very Loose
11 - 25
5 - 10
Loose
26 - 45
11 - 20
Finn
45 - 75
21 - 30
Very Firm
76 -120
31 - 50
Dense
> 120
> 50
Very Dense
Silts & Clay
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hammer Blows
Relative Density
0-6
0-2
Very Soft
7-15
3-5
Soft
16 - 30
6 - 10
Finn
31 - 45
11 -15
Stiff
46 - 90
16 - 30
Very St
91 - 150
31 - 50
Hard"
Rock Hardness Description
Soft
Rock core crumbles when handled
Medium
Can break core With onr hands
ha
Moderately Hard
Thin edges of rock core can be broken with fingers
Hard
Thin edges of rock core cannot be broken with fingers
Very Hard
Rock core rings when struck with a hammer
Sand Quantity Modifiers
Very Slight Trace
0 - 2 %
Slight Trace
2 - 5 %
Trace
5 - 10 %
Little Trace
10 - 15 %
Some
15 - 30 %
With
> 30 %
Silt - Clay Quantity Modifiers
Slightly Silty /Clayey
0 - 5 %
Silty / Clayey
5 - 30 %
Very Silty / Clayey
30 - 50 %
Particle Size
Boulder
> 12 in
Cobble
3 - 12 in
Gravel
4.76 mm - 3 in
Sand
0.074 nun - 4.76 mm
Silt
0.005 mm - 0.074 min
Clay
< 0.005 min
Xederal
glneering
esting, Inc.
Drilling & Sampling Procedures
The soil borings were installed in accordance with Standard Penetration Tests procedures as set forth in ASTM D-1586.
Representative samples were collected utilizing spilt -barrel techniques in accordance with the procedures set forth in
"Penetration Tests and Spilt -Barrel Sampling of Soil in ASTM D-1586. The following field tests, measurements and
laboratory analysis were performed/collected during the installation of each soil boring.
Penetration Tests
During the sampling procedures, Standard Penetration Tests were performed at five (5) foot intervals to obtain the
standard penetration value (N) of the subsurface soil. The standard penetration value (N) is identified as the number of
blows of a 140-pound hammer falling thirty (30) inches, required to advance the spilt -barrel sampler one (1) foot into the
subsurface soil. The sampler was lower into the bottom of the previously cleaned drill hole and advanced by blows from
the hammer. The number of blows was recorded for each of the three (3) successive increments of six (6) inches
penetration. The "N" value is obtained by adding the second and third incremental numbers.
Water Level Measurements
Water Level depths were obtained during the test boring operations. In relatively pervious soils, such as sandy soils, the
indicated depths are usually reliable groundwater levels. Seasonal variations, tidal conditions, temperature, land -use and
recent rainfall conditions may influence the depths to groundwater levels.
Soil Properties / Classification
All samples collected were classified in accordance with the Unified Soil Classification System criteria to determined
soil material properties and compared with published literature of the USDA Soil Conservation Survey.
Ground Surface Elevations
Ground surface elevations have not been provided for the proposed boring locations. Therefore, all references to depth
of the various strata and materials encountered were from existing grade at the time of the drilling operations.
Limitations of Liability
Warranty
✓e warrant that the services performed by Federal Engineering and Testing,
me. (F.E.T.) are conducted in a manner consistent with the level of skill and
are ordinarily exercised by members of the profession currently practicing
rider similar conditions. No other warranties, expressed or implied, are
lade. While the services of F.E.T. are an integral and valuable part of the
.sign and construction process, we do not warrant, guarantee, or insure the
laity or completeness of services or satisfactory performance provided by
her members of the construction process and/or the construction plans and
weifications which we have not prepared, nor the ultimate performance of
rilding site materials. As mutual protection to clients, the public and
rrselves, all reports are submitted as the confidential property of clients, and
rthorization for publication of statements, conclusions or extracts from or
garding our reports is reserved pending our written approval. Reports are
it intended for 3rd party use.
Substufice Exploration
ibsurface exploration is normally accomplished by test borings. The soil
ring log includes sampling information, description of the materials
:overed, approximate depths of boundaries between soil and rock strata and
aundwater data. The log represents conditions specifically at the location
d time the boring was made. The boundaries between different soil strata
e indicated at specific depths; however, these depths are in fact approximate
d dependent upon the frequency of sampling. The transitions between soil
atum are often gradual. Water level readings are made at the time the
ring was performed and can change with time, precipitation, canal levels,
:al well drawdown, and other factors. Regardless of the thoroughness of a
!otechnical exploration there is always a possibility that conditions may be
Y'erent from those of the test locations; therefore F.E.T. does not guarantee
y subsoil condition surrounding the bore lest holes. For a more accurate
rtrayal of subsurface conditions, the site contractor should perform tests
s. If different conditions are encountered, F.E.T. shall be notified to review
findings and make any recommendations as needed.
Laboratory and Field Tests
sts are performed in accordance with specific ASTM Standards unless
ienvise indicated. All criteria included in a given ASTM Standard are not
rays required and performed. Each test report indicates the measurements
f determinations actually made.
Ownership of Tests /Reports
lest results and/or reports prepared by F.E.T. pursuant to this agreement
For Addendunm(s) thereto, shall remain the properly of F.E.T. until all
nies due and owing to F.E.T. under this Agreement and/or Addendum(s)
reto, are paid in full.
Analysis rind Recommendations
Geotechnical report is prepared primarily to aid in the design of site work
I structural foundations. Although [lie information in the report is expected
)e sufficient for these purposes, it is not intended to detemmine the cost of
islruction or to stand alone as construction specifications.
federal
- gineering
©esting, Inc.
Analysis and Recommendations coat.
In accepting this report the client understands that all data from the soil boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this report the client understands
that all data from the soil boring is intended for foundation analysis only and
is not to be used for excavating, backfilling or pricing estimates. The site
contractor must familiarize themselves with the job site conditions. Soil
boring(s) on unmarked vacant property or existing structure(s) to be
demolished is considered preliminary with further boring(s) to be performed
after proposed building pad is staked out. Report recommendations are based
primarily on data from test borings made at the locations shown on the test
boring reports. Soil variations may exist between borings and may not
become evident until construction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report stales our understanding as to
the location, dimensions, and structural features proposed of the site. Any
significant changes in the nature, design, or location of the site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted.
Construction Ohservations
Construction observation and testing is an important element of Geotechnical
services. The Geotechnical Engineer's Field Representative (Field Rep.) is the
"owner's representative" observing the work of the contractor, performing
tests, and reporting data from such tests and observations. The Geotechnical
Engineers Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep, is only
collecting data for our Engineer to review. The Field Rep. is responsible for
his/her safety only, but has no responsibility for the safety of other personnel
and/or the general public at the site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep. will stop hiMier
observation/ testing until he/she deenms the site is safe. The Field Rep. is an
important member of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations of Report
Federal Engineering A Testing, Inc. shall have no liability, in contract, ton or
otherwise, for any inaccuracy, defect, or onmissiou in interpreting this report
and shall not in any event have any liability for lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive danmages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees will be billed on an hourly rate, i.e. deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for review and applicability of this report.
edera I Phone: 954-784-2941
E-Fax: 954.784.7875
® ngineering admin@fed-eng.com
www.fed-eng.com
®eating, Inc. Mq
Soil / Aggregate Tests
Soil Borings
Density Compaction Tests
Grain Size Analysis
Moisture Contents
Soil Classifications
Limerock Bearing Ratios
Florida Bearing Values
Specific Gravity
Carbonate Analysis
Hydraulic Conductivity
Organic Contents
L.A. Abrasion
FDOT Inspections
OC Management
arthwork Inspections
OC Concrete Inspections
:IC Asphalt Inspections
Partial List of Services
Geotechnical Engineering Services
Field Inspection Services
Fill & Quality Control Inspections
Demucking Inspections
Building Inspections
Pile Driving Inspections
Pile Load Tests
Steel Inspection
Threshold Inspection
Bolt Inspection
Weld Inspection
Vibration Monitoring
Geotechnical Engineering
Foundation Engineering
Foundation Design & Recommendation
Subsoil Investigation
Pile Load Calculations
Piling Installation Monitoring
Asphalt Services
Backscatter Density Tests
Extractions & Gradations
Marshall Limits
Bulk Specific Gravity
Cores for Thickness Determination
Asphalt Pavement Monitoring
Asphalt Assessment
Concrete Tests
Concrete Strength Testing
Slump Tests
Windsor Probe Testing
Schmidt Hammer Testing
Core Testing
Air Content
Concrete Unit Weight
Flexual Strength Testing
Q Environmental Engineering Services
phase I Site Assessments Phase II Site Assessments Lead Base Paint Surveys
iite Inspections Phase I Follow up on Contaminated Sites Report and Analysis
2esearch of Property Records Installation of Monitoring Wells Air Monitoring
Soil Borings
Soil and Ground Water Analysis
Roof Testing & Inspection Services
'AS 105 Field Fastener Withdrawal Test
AS 106 Tile Uplift Test
'AS 124 Bell Chamber / Bonded Pull Test
'AS 126 Moisture Survey
Vindload Calculation
)rainage Calculations
.ightweight Concrete placement Inspection
toof Assessment / Evaluation
:ap Sheet Inspection
.aslener Spacing Inspection
ile/ Shingle/ Standing Seam Inspection
lase Sheet Installation Inspection
isurance Mitigation
tetrofit Mitigation/ Certification
loof Drainage Calculations
llllllllllllllll�QjNEstiTA-VeBde' ;Qaklaad.Ear ,F, or 8.333
_\\
MIAMrnADE)1 Imo. B•.Q lr 11
s,,®., awci a l$ lztGi�rli-- If @ 9CJ' 1