Loading...
HomeMy WebLinkAboutProducts Review; FSI Skirting Ventilation Specs( [/��[�R{(��e//�q'wlr�n�aryAw� i d 9UI a tltM'.s�C 'S� � �J ,per( ,�y dry, up, P F88 's'nQ TOP MR CUSsign pro�6��� �, (9(9(6����'''' O P0.i79 Gas Of `i onffla ftn per jj N j ot, Atlantic 1 v w8ng panels thQt add Qn addISO p err Dinsmf Panel gn p1sle a Th0119rage 28"1 high vented OrVrSol an mn adrift l 2.8 �8 ®8� Vonwavon per pe"Ou used. Typical 14' set 8Z 28' height TOP ROB Vent: Kneel fSV X 2, 50 . inches per foot 124 P16S. 260 vank. panel: 124 P . x 9-S sq. inches per pc T'2'cl9 Venffl On sq. In6hea TOW Venftv.on a'q. ft. f I 412.5 i R-& o 4ill 827.7 � sq, jgoh'' 1'527.7 � � .3 sq. f Oventilation ;P A: MTACH BAD RXL 1.13cteanlne a place for mounting Thee botwm edgy of back sail *Wow bottom edge of totslionte.Thie location must oifet ealld elf= At atracbkg and wind load pmuo for parade and rails. 2. Keep the back rail straight and kwl Snap a coins Teas awmad the horns to lid the rap edge of ffie beck rid. 3. Correct W=wingornwT4 tttddW iOrbRck rw" Sated the back tilde of the house. Yositioa sr M ax Adh in the career of the slot. S=wfnail to allow f x a clemace -of 1/i6" from else bask ru7 s+uface. Now avoid tightly sutwing or nailing back rail. A 1/16" clearance dtam far nma dl wpumon and oontriaron M& tempecatum dwinge, Pleas s soars ar nxU in every other shot 4. provide a Ull gap berm a i cmh back tail Milan far normd d%Md expansion To WA asauetd corner, I* tc PMP E I,I OPASO. Aso mills ALA EL PJEL IDE Aa 1. Dg4 minx vsa kugar pica d montaje. Cologw d bowie inkdor del Ad de apoya )=,to strSlo des hors in aior de Is cm lei ubicaddn &be ofax�rr on apayo 6rste qns: petn►lta davit ? rielcs y soportar la Qred6c, For corgis de vlecto eat lag Panel es. 2 Womp dekho d rid de sopww y a tdvd. ii uque urn ltaea can d cordd cwisado r & la case pm gout al botdo sup„rior del rid 8e sptrya 3. X6todo coiar eon pare clavu ei del de spoyo: Comic= an Ira parse potdodo la = CoNue loa dTvs so, d =tw de In MnM pm vw.Intmdumlos ck6syd*uns bAlgura de M6° desde h, saperlwe dd dd de gvjoo &M. No clave may y cm el rid de apoyo. Una =to de V16" con la esbeza des CbM pe�moidid el eapacio parr$ 4sotbar la apnown p ®or►tsaccion n.=da resulmnw de Jos embics de �• Colgw so9 duos en mum ale 4. �, mi ego & IM CM 3 cede =&I de 91d &FPPM teaer en tucnt a 4a s ptsasi3n I , etmvd hm lasrdlar d PWAM L-cmor do lea eogttittsa, oomdtc d Pw I. AOUMBUMMRAL i. Gwuad ptvct om Prom to woundso tic it is smooth, tb of loose dumpe, elide og protruding ohtz k& Guard again uneven cetWng of way emvaW ground by mounting d bottom ra on tasted (ZxX) htmber. 2. Idlack the ground location directly below the outd&, bottom ed of the home. Use a kvd or plumb bob to deMMI a this toad at eft c"Act 3. Snap 6 64 fine or lUddl I'aylDtl suing betwalk 4"fi comer goi& the battota rail 4. position the bottom rail wA tlu back leg gird the inside of e dteklice Perimem 5. Dd" pwO 51Stlsea Mry 19 iachm7Wo cots of holes ere ptvda� in the bottom rA'M-,Y are keuod inside the cltenrcel, and ors buk [eg. Groud OOW may be drives In either We at WervaL 19 incltm 6. %ostallWon on aotlaoeM. Use a 314' maoanry WL You mly a &M a bale ta 311rm may eras. and plastic icam (Nail t resew ttraterlais ze available at short k mvwvw sioxas.) To instals sround comet, refer to SCV E. PASO 864 ���E a� mQNT, 9 DEL RML 1. Pop ndda dd pvso de eiy= prcpers 01 piano de maw& qua udomte, aia = sudtas, to mm m obs&uloa qw sobw del ,plso, Pbarrje l© insWl costa el asentamit nm .no mg 4Aptsoe ruidn Mcavados, Mon=& d dd kfekar an una Pic eaadeaa tratada (7 a 21. 2. Muq= la Wmici& en el ,pim dirc=tente aba}a dd i inferior www do la Casa. Use un travel o um plomada &tePagm &ate ubicadda an adg 000, 3: 1V,�cgtte tma i m cm d coidd =fin& o cologm una M MUM entre CA esoa PM gazer el reed de xpaya. 4. Calcque 4 rid de apayu coma Para ds tb tpaldo hick eJ itttrri �dmeteo maasLda got da drier ds Liza. g. Itttrodu dos ctt+voe gtt>ssos oa d PIV 9 rnda 19 getgadav, riel inferior se propordonsn dos conjuntos de agujems. PAtos se enementraa deotco del canal, en la pata de soporte. Los clavos gruesos pars el piso se pueden clavar a tiavds de coaiciuicra de Jos agujeros a una distancia do 19 pulgadas e�'ntre A 6. haWa4dn en pisos de concecto. Use un claw de 31V pare mamposteda. Ad mismo se puede tale r un agujero paxz un Mmillo de 3116° tipo Molly eau on& plbdca. (LO tnated*O de claws y 6 tvrnillos wean dhpovibles en Ja mayoria de in Para hutalar el pmducto alrededor do ias esquinas, consulte el pnso E. P C: PANEL MALLATION 1. Peginning 24a awry from the lowest corner of the home, measure from the ground up to 1-IM above the 6ttom edge o£the back raiL Of the temperature is below 407,v ith frozen ground, measwte to W abwwve the back ma edge.) 1 Z. ,'�Ieasurerrtents on slopi��Nund should fie takeir every Ib° (viuitb o£panelj. 3. Cut the bottom of each panel to angle with the gnawed. Each om panel section should slim 90'ta the bottom edge ofthe home. Use aviation snips or a power saw (with a fine toothed saw blade turned backwards) for cutting. 4. Punch lock tabs every 4° along the top and bottom edge of cut panel stcfms (or outside pore= of each panel face for 13° Vad1l'st). ! Malco A-8) Snap Loch Punch tool is recommended. Comult your sl&dng supplies k obtaining this tool. Tabs are to be positioned outward to catch on the hooked OF of the rails. S. Interlaek panels and insect into the bottom rail. Jiegin with dw fht pantd inserted into die bottom rail. LacEtaba should snap past the hooked edge of the bottom rail. Insert rued panelseedon into the imerlock hooks along tht=vadcal edge;ofthe panels. Seat each panel socunly into the bottom rail. Rep* interlocking parcels, forming about a 12-foot secdoni. Resume panel cut and inteciock method. To install wound corner, refer to Step L C4 CS PAWS imcTALArinm DE LDS PAMELES L Cometnondo a W doh sequinsitferior misb* de la cm mida desdelasupe&cle delpiso hmmI lM mAbadelborda infedordel rlel de apoju (Si la temperatura amblante duronte la instal"n es inferior a los 407 yel piso eetd eongelado, rnida hasty 3° arriba del borde del del de apop). I JLn mediciooee en pleas corn desnivel deben hacerse a cads 16" (ancho del panel). 3. Cam la parts inferior de cede panel en angdlo segn el deanival del piss Wit saddn de panel eort+adv debe eamr a eacuadm (9(r) cos el borde infetlor de la rasa. Use tijem de hojalatem o una deem eMctdca (con una h* de aorta de diente lino oolocada al,t WO) pas cotter 10 pansies. 4r Airfare In ImStlew de cierre cads 4° alo largo del border superior e inferior delao seccionea de panels cottados. Sencomierida el use de una punzonadora de maw Malco (SIr8) Snap Lock Pasch. Cumulm con n pmedor de ccacW SoW come obtecer to hwamienta. Las leng;etae deben coimaese herds slues a fin de Mader engowim d borde de gaucho de cos rivin I S. $nganche to$ paneks c introd6zralos en el riel inferior, Cosniease con el pitmen panel introducido en el fie[ inferior. La leng,eas de Jerre deben enganchatse haste mfs aU del horde con gaucho detriel do apoyo. rntroduzm la slguientc sctida de panel en j los ganchos de enciavamiento a to largo del borde vertical de los paroles. A iente cads panel firtnements en el rW la&dor. Repit� eI eaclavamiento de los pantiles hasta format una section ile aprax>rnadamente 12 pies. Reanude cl oorte de los panelcs y of m&& de enclamolento. Para instalar el poducto en las esquires, consulee el peso Z STEP D: i INTERLOCK FRONT RAIL WITH BACK RAIL 1. Stair swapping one ad of the front top jrrd2 into the back top rail, creating the interlock. Push the front top rail upward, its entire length until the front top rail is completely interlocked with the backra'tl,� 2. Overlap V cKh top rail section. To hwtalt around corner, tefec to Step E. PASO D: ENCLAYAMIEMxO DEL RIEt FRONTAL CON EL RIEL DE APOYO 1. Comience engaacbando un exfremo del ricl hoadsuperior en el riot superior de apoy+o, pare formas'el rumnistm de encbmrniento. Eanpuje el rid superior I de apoyo Imcla arn'ba en coda su longitud pasta que el tic frontal superior este compleruaeote engxWmdo er el riel de, apoya 2. Ttulapc V cada secrida del tiel superior: Pats instdar el producto an In wquinae, consula el pasa F. r �rP Ei CORNER IbIffA LATION 1. Top back rii. — Make a 1" verdcal slit from the sop, TOP interlock hook should be completely cut tbxouglr. Notch 45'onbottom =Yed14 2. Bottom ail — Notch the back portion with snips, as illustrated, Bend around a eoraer and attach to the ground. 3. pmb — Cut panel to proper height. Detemoiue point of corner bend; bend over it table edge, forming a uniform angle. 4. Top frontra7 —Notch at both the top and bottom books of the fi= tail, w illustrated. Bend amt nd the corner and .fit ipoo the interlock with the top back 6L Refea to Step D. POUR Pag-m 'CHED TOP FRONT RAILS ARE INCLUDED IN TRINE PAK. PA�O � INSI'ALACI N DEL PROOUCiO IN LAS ESQUINAS I. Riel superior de spoil —lisp un corte verEW de 1" desdc la parte superior; El gaucho supctior de endavamiento debe cortatse completamente. Hop uno muesm a 45' en la pats curvada inferior. 2. Riet ineeor — Corte la pord6n posteriot con tijeras de hojalatero segtin se muestra en in llustmcidn. Ddblelo &Cdedar de una esquias y clavelo Al piso. 3. pantiles_ Corte el panel a la altttta apropiada. Determine el punto de doblers doble el panel sobrc el borde de una mesa, para fotmgr un 6100 recta 4. Riel &ortel superior — Corte log garchos superior a ll kior del riel £contal, segdn se ilustta en is figtrta. l?obid la picza alrededot de la esquina y en&Aela en el et►elavamiento con el ricl mpedor de apoya Consulte el Paso D. EN EL CONJUWO TRIM PAK $E INCLUYEN CUATRO RIFLES SUPERIORES FRONIALES YA CORIMOOS. II011_ S 0.MMA IMUSA T 1 nr T I ft In er%n Juan r ^nw • • j-'-, . _., ` -- - -- -- • •• __