HomeMy WebLinkAboutCompaction testA Universal
Sciences
snn c .tceCompany
LIES Project No: 3360.1700014.0000
Workorder No: 231100-1
Report Date: 04/22/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In -Place Density Test Report
Client: Doyle Masonry, Inc.
P.O. Box 12339
Fort Pierce, FL 34979-2339
Project: DOYLE MASONRY, INC.
Various Locations, TBD County, FL
Area Tested: Holiday Out - Lot 10 - 10725 S Ocean
Drive, Jensen Beach - Footings
Material: Backfill
Reference Datum: 0 = Top of Footing
The tests below meet the 95% minimum compaction requirement.
LIES Technician: Mark Rogers
Date Tested: 04/15/2021
Type of Test:
Field: ASTM D-6938 Nuclear Gauge Method
Laboratory: ASTM D1557 Modified Proctor
Maximum
Optimum
Field Dry
Field
Soil
Pass
Test
Density
Moisture
Density
Moisture
Compaction
or
No.
Location of Test
Range
(pcf)
N
(pcf)
N
N
Fail
1
Northside footings
0-1 ft
102.1
13.1
101.0
12.7
99
Pass
2
Southside footings
0-1 ft
102.1
13.1
100.1
12.5
98
Pass
Reviewed By
GFA International, Inc
FBPE Registry No.4930
Digitally signed by Thomas D
" 84146
Montano:A01410000000178
W
Lk .
18498DCD000019A3
T"TE°` � Date: 2021.04.2210:32:05
MM, � �°-04'00'
Thomas Dominic Montano
Branch Manager
STATE OF FLORIDA
Professional Engineer No. 84146
This item has been digitally signed and sealed by Thomas Dominic
Montano on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1