Loading...
HomeMy WebLinkAboutProject Information (4) Joe Cicio From: Joe Cicio Sent: Friday, March 16, 2018 7:45 AM To: 'Info Service Star Cooling and Heating' Cc: 'michellelalondeaccessories4@gmail.com'; Monica Barrios; David Johnson;Joe Cicio Subject: RE: HVAC inspection for Permit Number 1705-0242 Good morning, After this permit has been issued to the contractor we will require an original,signed, sealed and dated report from a Florida Licensed Architect or Engineer that the mechanical work has been performed in accordance with the submitted Manual J, Manual D and duct layouts as submitted . Once this report has been received I can sign off all inspections and the permit will be closed. Thank You Joseph 1►t. Cicio Plums I,r<<rniner II iSlar2dard 13t2ilding•Inspector Btj&liiig Pl u2s•Examiner .One w2d T4,o Fvnj7j, Inspector Oi2e v2d Taro Fxni1J,,P1xis E xnincr I,iicie Gou221J�1'1a22nin�;u2d Der elop222e22t Serr ices 772-162-1,55<3 t��s'r3�LLc�x_7 r7 YNT.. � sCS [fit.wit . From:Joe Cicio Sent:Thursday, March 15, 2018 4:05 PM .To: 'Info Service Star Cooling and Heating' <info@servicestarcoolingandheating.com> Cc: 'michellelalondeaccessories4@gmail.com' <michellelalondeaccessories4@gmail.com>;Joe Cicio <cicioj@stlucieco.org> Subject: RE: HVAC inspection f will respond to this in this a.m. Thanks Joseph.M. Ciciv 1'/,zr2.s L;Y�vniner II SGv2dxv c113uilding Inspector Building Plans•1,xafnincr O22e and Tr+o EamilyDrrellinb•I12spector One and 7%r-o Farnily1'lu2s E iminer 1 Duct S stem Summa Job: R a -��- wrightSoft. y � Date: 02-07-1807-18 Entire House By: JND Service Star Cooling and Heating Project Information t . ..� ,v__. 4't.!/All. •. ,;.'lJ J-{a,.!!�"`., li1."1 J`JS`dda For: Lalonde Residence 5307 Myrtle Dr, Fort Pierce, FL 34982 ro Heating Cooling External static pressure 0.50 in H2O 0.50 in H2O Pressure losses 0.17 in H2O 0.17 in H2O Available static pressure 0.33 in H2O 0.33 in H2O Supply/return available pressure 0.232/0.098 in H2O 0.232/0.098 in H2O Lowest friction rate 0.158 in/100ft 0.158 in/100ft Actual air flow 0 cfm 793 cfm Total effective length (TEL) 209 ft SupplyDetail Table Design Htg Cig Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FR (in) (in) Matl Ln (ft) Ln (ft) Trunk Bath c 413 0 20 0.159 5.0 OXO VIFx 21.2 125.0 st1 Bedroom C 1668 0 82 0.165 5.0 Ox0 VIFX 15.8 125.0 st1 Kitchen C 1635 0 80 0.163 5.0 OXO VIFX 17.2 125.0 st2 Kitchen-A C 1635 0 80 0.160 5.0 Ox 0 VIFX 24.9 120.0 st2 Living Dining Rm c 3606 0 177 0.172 5.0 Ox0 VIFx 10.2 125.0 st2 Living Dining Rm-A C 3606 0 177 0.170 5.0 Ox0 VIFX 11.9 125.0 st1 Master Bath C 246 0 12 0.166 5.0 Ox0 VIFx 14.9 125.0 st2 Master Bedroom C 2798 0 138 0.158 5.0 Ox0 VIFx 22.4 125.0 st1 Mwic C 505 0 25 0.160 5.0 Ox0 VIFx 20.1 125.0 1 st2 Supply Trunk Deta.il Table Trunk Htg Cig Design Veloc'• Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk st1 Peak AVF 0 418 0.158 391 14.0 0 x 0 VinlFlx st2 Peak AVF 0 375 0.160 269 16.0 0 x 0 VinlFlx Return Branch Grille Htg Cig TEL Design Veloc Diam H x W Stud/Joist Duct Name Size(in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening(in) Matl Trunk rb2 Ox0 0 793 61.9 0.158 1010 12.0 Ox 0 VIFx �a _Fk wri-QhtsolFt, 2018-Feb-2316:55:22 Right-Suite@ Universal 2018 18.0.10 RSUD7440 Page 1 ACC-N C:IHVACIaWork File\R0218054-LalondaIR0218054.rup Calc=MJ8 Front Door faces: N inu1 -an entSe d Del, rcices St: Lurie Comity Plar � p '772-162-15,53 p ICeS,. t a�tr!t From: Info Service Star Cooling and Heating [mailto:info@servicestarcoolingandheatinR.comj Sent:Thursday, March 15, 2018 4:02 PM To: Michelle LaLonde<michellelalondeaccessories4@gmail.com> Cc:Joe Cicio<cicioi@stlucieco.org> Subject: Re: HVAC inspection St Lucie County will be conducting the final inspection On Thu, Mar 15, 2018 at 3:05 PM, Michelle LaLonde <inichellelalondeaccessories4na� inail.com> wrote: What county office or company will be doing the final inspection? :.On Thu, Mar 15, 2018 at 10:39 AM, Info Service Star Cooling and Heating '<info..a.servicestarcoolingandheating.com> wrote: i e r Good Morning! €' We have spoken with Joe Cicio and will be overnighting him updated paperwork to activate the permit, when we are able to pick up the permit we will get a copy over to you. Once that is completed, we will give you a f I call to schedule a final inspection on your behalf. Please let me know if you have any further questions and/or i concerns. 3 Thanks so much and have a great day! i = On Thu, Mar 15, 2018 at 10:30 AM, Michelle LaLonde <michel letalondeaccessories40),mail.coin> wrote: I j Matt, i To reiterate our phone conversation of 03/14/18. I told you that you were welcome to come next week and look over the work you did last May on the HVAC our company installed. I told you that per Joe Cicio's Y Y Y p Y Y advise to me that you were not to touch anything . You are there only to inspect your work. You said you would contact your service manager and schedule a date and time to come next week. If Feel free to contact me and set up an appointment. Michael LaLonde 518-487-8479 5 307 Mvrtle.Dr Ft. Pierce FI 34982 i Please Note:Florida has very broad public records laws.Most written communications to or from County officials regarding County business are public records available to the public and media upon request.It is the policy of 5t.Lucie County that all County records shall be open for personal inspection;examination and! 2 rAdak Now- FEB 1 5 HELD HVAC Layout Kitchen Mwic Master Bat 10 x 6 10x6 80cfm 173 cfm 5 10x6 5" 10x6 13cfm 27 cfm 5 5" 10x6 2Ton 80 cfm 16" ah located in attic 51. 793 cfm 12 x 12 12" Hall Garage Thru wall RA 4" Bedroom 10x6 141 cfm 10 x 5" 10x6 23cf 173 cfm 5 5" 2x1 Thruwall 10 x 6 82 cfm Master Bedroom Living Dining Rm 5" Bath ST,LUCIE COUN"I V UILDTRTG D?'d7,�ION Pre-Reviewed Not -RO'nowed By- Job#: R0218054 Service Star Cooling and Heating Scale: 1/8" = 1'0" Performed by JND for: g g Page 1 Lalonde Residence RightSuite®Universal 2018 5307 Myrtle Dr 18.0.10 RSU07440 Fort Pierce,FL 34982 2018-Feb-09 08:28:56 ...1R0218054-Lalonde1R0218054.rup Duct System Summary Job: R0218054 -F�- wrightSoftm S y Date: 02-07-18 Entire House By. JND Project Information For. Lalonde Residence 5307 Myrtle Dr,Fort Pierce,FL 34982 Heating Cooling External static pressure 0.50 in H2O 0.50 in H2O Pressure losses 0.17 in H2O 0.17 in H2O Available static pressure 0.33 in H2O 0.33 in H2O Supply/return available pressure 0.232/0.098 in H2O 0.232/0.098 in H2O Lowest friction rate 0.158 in/100ft 0.158 in/100ft Actual airflow 0 cfm 793 cfm Total effective length(TEL) 209 It SupplyDetail Table Design Htg Cig Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (dm) (C m) FR (in) (in) Matl Ln(ft) Ln(ft) Trunk Bat, C 499 0 23 0.159 5.0 Ox 0 VIFx 21.2 125.0 st1 Bedroom C 1778 0 82 0.165 5.0 Ox 0 VIFx 15.8 125.0 st1 Krb:fen c 1734 0 80 0.163 5.0 Ox 0 VI Fx 17.2 125.0 st2 Kitchen•A c 1734 0 80 0.160 5.0 Ox0 VIFx 24.9 120.0 st2 Livlrg Diring Rm c 3746 0 173 0.172 5.0 Ox 0 VIFx 10.2 125.0 52 Living Dirirg RrrrA c 3746 0 173 0.170 5.0 Ox 0 VIFx 11.9 125.0 st1 Master Bath c 284 0 13 0.166 5.0 Ox 0 VIFx 14.9 125.0 st2 Master Bedroom C 3042 0 141 0.158 &0 Ox 0 VIFx 22.4 125.0 st9 MWC c 593 0 27 0.160 5.0 0x 0 VIFx 20.1 125.0 st2 Suipply Trunk Detail Table Trunk Htg Cig Design Veloc Diam HxW Duct Name Type (cfm) (clm) FR (fpm) (in) (in) Material Trunk st1 PeakAVF 0 419 0.158 392 14.0 0 x 0 VinIFIX s12 PeakAVF 0 374 0.160 268 16.0 0 x 0 VinlFlx Return Branch Detail Table Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size(in) (cfm) (dm) (ft) FR (fpm) (in) (in) Opening(in) Mal Trunk rb2 Ox 0 0 793 61.9 0.158 1010 12.0 0x 0 VIFx BoWitaNc values have been manually ovenridden wrightsoft- 2018-Feb-0812:24:22 �� •u•• _ , Riga-Sate®Umrersal 201818.0.10 RSU07440 Page i AC+CK C:WMAC1aWorkF1e1R0218054-Lalonde1R0218054.rup CaIc=MJ8 FrortDoorfaces:N Manual S Compliance Report Job: R0218054 wrightsoft, p ~ Date: 02-0748 Entire House By. JND Project Inf• • For. Lalonde Residence 5307 Myrtle Dr,Fort Pierce,FL 34982 �Cooling Equipment Design Conditions Outdoor design DB: 93.0°F Sensible gain: 17361 Btuh Entering coil DB: 77.7°F Outdoor design WB: 75.2°F Latent gain: 3415 Bluh Entering coil WB: 63.7°F Indoor design DB: 75.0°F Total gain: 20777 Btuh IndoorRH: 50% Estimated airflow: 793 dhn Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer. Rheem Model: RP1424AJ1NA+RH1T2417STANJA Actual airflow: 793 cfm Sensible capacity: 17374 Btuh 100%of load. Latent capacity. 6426 Btuh 188%of load Total capacity. 23800 Btuh 115%of load SHR: 73% Equipmeht Design Conditions Outdoor design DB: 40.9°F Heat loss: 12605 Btuh Entering coil DB: 70.0°F Indoor design DB: 70.0°F Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SpIitASHP Manufacturer: Rheem Model: RP1424AJ1NA+RH1T2417STANJA Actual airflow: 0 cfrn Output capacity: 22800 Btuh 181%of load Capacity balance: 25 °F Supplemental heat required: 0 Btuh Economic balance: -99 °F Backup equipment type: Elecstrip Manufacturer: Model: Actual airflow: 0 cfm Output capacity: 5.0 kW 135%of load Temp.rise: 20 °F Meets all requirements ofACCA Manual S. * wrightsoft® 2018-Feb-0812:03:18 i►... ,--r1, NgttSJte®Uriversal 201818.0.10 RSU07440 Page 1 �iCK CU-NAC1aWorkRle1R0218054-Lalorde1R0218054np Calc=MJ8 FrortDoorfaces:N wri htsoft. Project Summary Job: R0218064 9 Summary Date: 02-074 8 Entire House By. JND Project Inf• • For. Lalonde Residence 5307 Myrtle Dr,Fort Pierce,FL 34982 Notes: Load calculation was obtained from an electronic copy of CAD drawing. Design Informatlon Weather. Orlando Sanford,FL,US / Winter Design Conditions Summer Design Conditions Outside db 41 °F Outside db 93 °F Inside db 70 °F Inside db 75 °F Design TD 29 *F Design TD 18 of Daily range M Relative humidity 50 % Moisture difference 39 grAb Heating Summary Sensible Cooling Equipment Load Sizing Structure 10055 Btuh Structure 12764 Btuh Ducts 1439 Btuh Duds 4392 Btuh Central vent(0 clm) 0 Btuh Central vent(0 cfm) 0 Btuh none Humidification 0 Btuh Blower e) 205 Btuh Piping 0 Btuh Equipment load 11494 Btuh Use manufacturer's data n Rate/swin multiplier 0.98 Infiltration Equipment sensible load 17014 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi-tight Fireplaces 0 Structure 2626 Btuh Duds 790 Btuh Central vent(0 cfm) 0 Btuh Heatingg Coolingg (none) Area(ft2) 938 93B Equipment latent load 3415 Btuh Volume(fF) 7504 7504 Air changes/hour 0.31 0.16 Equipment Total Load(Sen+Lat) 20430 Btuh Equiv.AVF(cfm) 39 20 Req,total capacity at 0.73 SHR 1.9 ton Heating Equipment Summary Cooling Equipment Summary Make Rheem Make Rheem Trade Split HP Trade Split HP Model RP1424AJ1NA Cond KP1424AJ1NA AHRI ref 7489174 Coil RH1T2417STANJA AHRI ref 7489174 Efficiency 8.2 HSPF Efficiency 11.5 EER,14 SEER Heating input Sensible cooling 17374 Btuh Heating output 22800 Btuh @47°F Latent cooling 6426 Btuh Temperature rise 0 °F Total cooling 23800 Btuh Actual airflow 0 cfin Actual airflow 793 dm Airflowfactor 0 cfm/Btuh Airflowfactor 0.046 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.84 Capacity balance point=25'F Backup:Aux Heat Input=5 kW, Output=17061 Btuh,100AFUE Boldftaric values have been manually overridden Calculations approved byACCAto meet all requirements of Manual J 8th Ed. - wrightsoft- 2018-Feb-0812:03:18 �► ^-"�" ^"-TM—,�^^ Right StiteQ�Uriversa1201818.0.10 RSU07440 ACCK C:WVAC1aWorkFIe1R0218054-Lalorde1R0218054np CaIc=W8 FrortDoorfaces:N Page 1 Ri h•®Worksheet • Job: R0218054 -wrightsoft° g Entire House Date: 02-07-18 By. JND 1 Room name Entire House Wster Bedroom 2 Dposedwall 104.0 it 26.3 it 3 Room height 8.0 ft 8.0 ft heat/cool 4 Room dimensions 11.0 x 15.3 ft 5 Room area 938.0 ft' 168.7 iN Ty Construction LI-value Or HTM Area (ft) Load Area OF) Load number (BtuhW-°F) (Bluhll6) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross NIPS Heat Cool Gross NIP/S Heat Cool 6 :W,`y.- 126 Osw °,_ 0.097 ;n. . ,_2.82 2.78 16 6 44 :,.',.. ;0 0 0 0 12B-Cm 0.097 a 2.82 2.78 394 219 618 60B 88 73 206 203 4A5-2ob 0.560 a 16.30 42.39 30 3 489 1272 15 2 244 636 4A5.2ob 0.560 a 16.30 42.39 35 4 570 1484 0 0 0 0 11 11N0 0.3W a 10.18 10.87 20 20 205 218 0 0 0 0 126-0sw O.D97 s 2:82 `2.78 268 187 ` 9 52D " 123 '.102 287 2M ; G 4A.5-lob, -0560 s_ 16:30 1794.. .:21 ._. 20 . _ _i 342 377. 21. _ '20 342 377 12B-0sw OD97 w 2.82 2.78 304 248 700 689 0 0 0 0 4A5.20b 0.560 w 16.30 4025 9 2 147 362 0 0 0 0 4A5-2obd 0.560 w 16.30 4321 47 4 764 2027 0 0 0 0 P 12B-0sw. }_, 0.097 2.82 177 192 192, :' 542 340 0.. 0 : 0 0 C 16B-30ad, __0.032 _._- o.93 1.75 938 938 873 1637 169 ._ 169 157 294 989 0 - :28:78 .• 0.00 '838 .104... ..,2993 0. .;169 '26 758 U T. 6 c)AEDexcursion 0 _89 Envelope loWgain 8817 9579 1995 1703 12 a) Infiltration 1239 395 314 100 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 3 690 2 460 Appfiances/other 2100 0 Subtotal(lines 6 to 13) 10055 12764 2308 2263 Lem exlemalload 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 10055 12764 2308 2263 15 Ductloads 14% 34% 1439 4392 14% 341% 330 779 Total room load 11494 17157 2639 3042 Air required(clm) 0 793 0 141 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. -44 - wr1gImtsoR- 2016-Feb-0812: e 1 .4AWNIZgkSlite®Uriversal 201618.0.10 RSU07440 Page 1 C:IFNACIaWorkFlIe1R0218054-Lalorde1R0218054np Calc=MJB FrontDoorfaces:N wri htsoft° Righ•®Worksheet • Job: R0218054 9 Date: 02-07-18 Entire House By. JND 1 Room name We Master Bath 2 Exposedvall 14.3 ft 5.3 It 3 Room height 8.0 ft heaYwol 8.0 ft heaYbool 4 Room dimensions 5.7 x 8.7 ft 5.3 x 8.7 ft 5 Room area 49.1 fF 462 ft Ty Construction U-value Or HTM Area (ft) Load Area (ft') Load number (Btiuh/ft'-q (Btuh#-) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P1S Heat Cool 6 .W 1 Msw 0.097 ri. .: 2.82. _.. 12B-0sw 0.097 a 2.82 2.78 0 0 0 0 0 '0 0 0 T�G 4A5-2ob 0.560 a 16.30 42.39 0 0 0 0 D 0 0 0 4A5.2ob 0.560 a 16.30 42.39 0 0 0 0 0 0 0 0 i D 11N0 0.350 a 10.18 10.87 0 0„ 0 0 0_ 0 0 0 126 Osw 0 097 s 2.82 218 •'69 69 196 193 .0 0 0 0 4A5 lob -0560 _s 16:30 _ 1794 0 0 0 0'. 0 _ -. :.. 0 1213-Osw 0.097 w 2.82 2.78 45 45 128 126 43 43 120 119 4A5.2ob 0.560 w 16.30 4025 0 0 0 0 0 0 0 0 4A5-2obd. 0.560 w 16.30 _ 4321 0 0 0 0 0 0 0 0 P 12B-Osw " 0.097.'.-: 2.82- 177 0 01 0. 0 D. 0 0 0 C 16B30ad 0.032 0.93 1.78 49 49 46 86 46 46 43 61 %0:989 28.78 ....:,0.00 49. .,.::14 48 . ,. ;.,5 153 0 6 c)AED excursion -17 .8 Envelope loss/gain 782 387 317 191 12 a) Ufiltration 171 54 64 20 b) Room ventilation 0 0 0 0 13 Internal gaim Occupants@ 230 0 0 0 0 Appfiances/other 0 0 Subtotal Vines 6to 13) 953 441 380 211 Less wdamal load 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 953 441 380 211 15 Ductloads 14% 34%1 136 152 14% 34% 54 73 F1Total room load 1089 593 435 284 Airrequired(dm) 0 27 0 13 Calculations approved byACCAto meet all requirements of Manual J 8th Ed -.�-• wrigl�tsoT�^ �A Rigk-Su Page 2te®Uriversal 201818.0.10 RSU07440 2018-Feb 0812:age 2 CIHVAC1aWorkFIeV20218054-Lalorde1R0218054ttp CaIc=MJB FroriDoorfaces:N wri 'htsoft" Ri h t@ Worksheet Job: R0218054 � , Date: Q2�7-18 Entire House By. JND 1 Room name Living Dining Rm Wtdien 2 Fdwall 25.0 ft 17.0 ft 3 Room height 8.0 It heat/cool 8.0 ft heat(mol 4 Room dimensions 1.0 x 303.0 ft 13.0 x 12.3 ft 5 Room area 303.0 f 160.3 f? Ty Construction U-value Or HTM Area (fe) Load Area W) Load number (BtuhAt2_-q (Btuh&) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross NIP/S Heat` Cool Grow N/P/S Heat Cool 6':W, :.; -126-Osnr_- .. ...: :0.097 n , ;. 2.82 .2.78 D . W 1213-0sw 0.097 a 2.82 218 88 33 93 91 0 0 0 0 4A5-2ob 0.560 a 16.30 42.39 0 0 0 0 0 0 0 0 4A5-2ob 0.560 a 16.30 42.39 35 4 570 1484 0 0 0 0 11 11N0 0.350 a 10.18 10.87 20 20 205 218 0 0 0 0 VW A26Osw 0.097 s' 282 '2.78 D 0 0 0 i'' 16 16 cUr "qq t ..G 4A5-2ob. _ OS60 -s.: 16.30. _ .17.94 . . _ 0 , 0 0 0 0 0 0 -0 fW 12B-0sw 0.097 w 2.82 2.78 112 65 184 181 104 95 268 264 I--ti 4A5-2ob O.560 w 16.30 4025 0 0 0 0 9 2 147 362 �G 4A5-2obd 0.560 w_ 16.30 4321 47 4 764 2027 0 0 0 0 s P 121]l ,:` 0697 2.82 177 0 0 _ 0 ..:._ 0 .. .. ..83., 83 ;<._ 233 146 C 16B30ad _ 0.032 023 1.75 303 303 282 529 160 160 149, 280 F 22A*4l...'. 0 989 :.28:78. ..:0.00_. .. .;303 25 719 0 160 17 489, 0 ell s< 6 c)AED.,d.n 34 106 Envelopelosslgain 2818 4564 1377 1248 12 a) Infiltration 298 95 202 65 b) Roomventilation 0 0 01 0 13 Internal gains Occupants @ 230 0 0 0 0 Appliancestother 900 1200 Subtotal(lines 6to 13) 3115 5560 1580 2512 Less eAemalload 0 0 0 0 Lewtransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 3115 5560 1580 2512 15 Ductloads 14% 341% 446 1913 14% 34% 226 865 Total room load 3561 7473 1806 3377 Air rewired(dm) 0 Mg 0 156 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. wrYgt�tsoTt� 2018-Feb-0812:03:18 PigttSute@ Uriversal 20l8 l8.0.10 RSU07440 Page 3 CUiVAaaWorkRIe1R0218054-Lalorde1R0218054np Calc=W8 FrortDoorfaces:N g wrightsoft Righf-!@)Woll-ksheet Job: R0218054 Entire House Data: 02-07-18 By. JND 1 Room name Bedroom Bath 2 E)posedvell 10.0 ft 6.0 ft 3 Room height 8.0 ft heaYbool 8.0 ft heat/cool 4 Room dimensions 10.0 x 11.0 ft 6.0 x 8.0 ft 9 Room area 110.0 ft2 48.0 ft2 Ty Construction U-value or HTM Area (ft-) Load Area OF) Load number (BWW F) (BtuhV) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross NPIS Heat Cool Gross NIPS Heat Cool 0 0.09 7 01 6 12B� 7 n'," 2..8 b I . - ,-.� : - -.%, 0 w 12B4)sw 0.097 e 2.82 2.78 80 65 183 181 48 48 135 133 4A5-lob 0.560 e 16,30 42.39 15 2 244 636 0 0 0 0 4A5-lob 0.560 a 16'30 42.39 0 0 0 0 0 0 0 0 11 11NO 0.350 e 10.18 10.87 0 0 0 0 0 0 0 0 0.097 a 0 0 2.78 0 4A-,72ob 0.560 31). a- 16 17.94 _0, --.0 0 0 0 0 A ti12B-Osw 0.097 w 2M 2.78 0 0 0 0 0 0 0 0 4A5-2ob 0.560 w 16.30 4025 0 0 0 0 0 0 a 0 4A5-2obd 0.560 w 16.30 4321 0 0 0 0 0 0 0 0 P"r- ­�b­ :­'-b ­0 "'0 -64 2-8� f.17 18 —'113 - 64 C 16B30ad 0.93 1.75 .110 110 102 -.192 48 ..48 45 814 i2878 0.00 110 10 6 1,73 L 1 L 7 7 q 6 c)AED excursion -6 -13 Envelope losslgain 818 1003 1 534 317 12 a) MItralion 119 38 71 23 b) Roorrivenfilation 0 0 0 0 13 Internal gains: Occupants @ 230 1 230 0 0 Applianoesiblher 0 0 Subtotal(lines;6 to 13) 937 1271 6051 340 Less eAemal load 0 0 0 0 LesstranAr 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 937 I271 605 340 151 Ductloads 14% 34./. 134 437 14%1 34% 87 117 Total room load 1071 1708 692 457 Air required(drn) -- 1 01 79 01 21 Calculations approved bYACCAtO meet all requirements of Manual J 8th Ed. -Fw 2018-Feb-0812:0118 Rglt-SLite@)Uriversal2ol8iB.D.IORSU07440 ACUN D.\FiVAC�aWorkFile)RO218054-Lalonde\RO218054xLp Calc=W8 FrorlDoorfaces:N Page 4 • wrightsoft Righ!!@ Wo'rksheet Job: R0218054 Entire House Date, 02-07-18 By. JND I Room name Hall 2 Exposedmfl 0 ft 3 Room height 8.0 ft heatbDol 4 Room dimensions 1.0 x 52.7 It 9 Room area 52.7 fF Ty Construction U-value or HTM Area (fe) Load Area Load number (Btuh/P-T) (Btuhffe) or perimeter (it) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cod Gross N/P/S Heat Cool 1 7 --,, . "`b 6 J2�Gs�i - 7 .- ,,2.82-- 2.78 1213-Osw 0.097 e 2.82 2.78 0 0 0 0 4A5-20b 0.560 a 16.30 42.39 0 0 0 0 4A5.2ob 0.660 a 16.30 42.39 0 0 0 0 11 11NO 0.350 a 10.18 10.87 0 0 0 , �,%: ObW 7 82 2.8 '0 0- z'O 0, 2. Z 0 s. 16.30 17.94 � O 0 4A5-lob 0 0 6 12B-Osw 0.097 w 2.82 2.78 0 0 0 0 4A5-lob 0.560 w 1630 4025 0 0 0 0 4AS-2obd,.--, , ....... 0.560 w 16.30 4321 0 0 0 0 6.1*7 2.82 1.77 28 C 16B-30ad 0.032 0.93 1.75 53 53 49 92 F: 22A cpl,:V OM 0 0 A W,I % - 4 6 c)AED excursion -7 Envelope loss(galn 177 166 12 a) Infiltration 0 0 b) Roorrivenglation 0 0 13 Internal gains: Ocuipants @ 230 0 01 Appliancestother 0 Subtotal(lines 6 to 13) 177 166 Less external load 0 0 Lesstransfer 0 0 Redistribution 0 0 14 Subtotal 177 166 15 Ductloads 14% 34% 25 57 Total room load 202 223 Air required(rim) 0 10 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. Right-SLite@ Uriversal 2018 18.0.10 RSU07440 2018-Feb-08 12:03:18 ACC-k C.,V-iVACIaWorkFileRO218054-Laloride1R0218054Ap CaIc=MJ8 FircritDoorfaces:N Page 5