Loading...
HomeMy WebLinkAboutTermite Treatment Planning Development Services Building &Code Regulation Division 2300 Virginia Ave mom Fort pierce,FL 34982 L111111111110W 772-462-2172 Fax 772-462-6443 CERTIFECATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #:SLe LULL t) J B ADDRESS: ��$ �� �1 ITT BUILDER/CONTRACTOR:, PEST CONTROL CONTRACTOR: EVIL -A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:JB176775 We, the,undersigned, hereby certify that we have pretreated the above,described construction for subterranean termites in accordance-with'the standards of the National Pest Control-Association. - Squarefeet if area treated: EAOD Chemicals.used: BASELINE _ - • .�.• .�... • +4'i�6;ear Percentage of solution: .06°i° Total gallons used: - Date,_of."i`reatment F/ _- =--Tme-of-Treatment: -- 4,2a� -- -- --�-- _ '' ' Footing Slab 1st Treatment 1st Treatment Re-Treat Re-Treat /Driveway': .• : . Pools -- ` :. eatment 1st Treatment i Rq-Treat. •` � Re-Treat t f6ther Cs' o �Perime r for Final:In t Treatment Re-Treat Signature of Extermin Date a. %1/ote.' 777ere must be,a completed form for each required treatment or re-treatment and this form must be on'the Job -site to be picked up by the inspector at time of each inspection or the scheduled inspection will fa!/and a re-Inspection fie e`charged• F11$�f®4:2.6 Certl&ate of'Protective Treatment for preventlon of Termites.A weather.reslstant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for,'the person the perrrtlt is issued to and another copy-for the building permit files The Treatment Certificate sha//pro vide the product used, /dent/ty of the appl/cator, time and date of the treatment,site location,area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment, If the loll chemical barrier method for termite prevention is used, final exterior treatment shall . be completed prior to final building approval. Sit Lucle County requires for the final inspection for C®,p permanent Sticker to be-placed on the electe•icaB panel boas cover, 9isting all the treatments and dates of.appincations. Revised 7/24/2014 REalvu 1UL 2 7 26i7 ,,