HomeMy WebLinkAboutSLC Building PermitCode Compliance Division BUILDING PERMIT
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-2172 Fax: (772) 462-6443
http://www.stlucieco.org/public—works/permifting.htm
Issued: 02/11 /2009
Conf #: 778
Job Location: 2699 N U S 1 LOT 41
Permit Type: Mobile Home
Job Description: I INSTALLATION OF A USED MOBILE HOME
S/D Colonv Club MHP
41
Permit #: SLC- 0812-0080
City: FORT PIERCE
Page 1
Block: Parcel: 1433-120-0010-000/5
Contractor ROBERT BARETT ! VAPOR LOCK TIGHT (866) 595-5245
7551 SW 40TH TERR PALM CITY, FL 34990
Property Owner HOWARD FEIN FINE REALTY CORP
2601 N US HWY 1 1 FORT PIERCE, FL 34946
(954) 478-7602
Setbacks Left: 15.00 Right: 16.00 Front: 11.00 Rear: 8.10 Zoning: RMH-5
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 0.00
Minimum Floor Elevation: . Flood Map: 177G Flood Zone: X Elev:
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official
Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.